← Back
Walk-up apt, over six families with stores
70 7 AVENUE
BROOKLYN · BIN 3019643
💬 Discuss this project
1889Year Built
4Stories
C7Building Class
R6AZoning
8,400 sfGross Floor Area
14Units
Rent Stabilized36 Open Violations 35 unresolved · 1 paperwork only ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: VM REALTY 6 LLC · 3,325 sf lot · 2.53 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Roof2p · 1 filing · 3 docs
Penthouse3p · 1 filing · 3 docs
Floor 142p · 1 filing · 15 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 32p · 1 filing · 11 docs
Floor 21p · 1 filing · 11 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
B MANGREEN DEVELOPMENT607/08/2026
VM REALTY 6 LLC503/22/2026
DATTILO ESTATE A103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/12/2020$3.0M—— → —$357/sf building
02/21/2017$172K—— → —$20/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TBC & ASSOC.403/21/2026
CROWN DESIGN CONSULTING1403/21/2026
B MANGREEN DEVELOPMENT203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MERRICK REAL ESTATE GP INGeneral Contractor607/08/2026
TOTAL ELECTRIC SOLUTIONSElectrical103/22/2026
MASTER FIRE MECH CORPGeneral Contractor107/08/2026
CLEAN TECH MECHANICAL INCPlumbing107/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CDG ARCHITECTS LLC /DBA:1327302/24/2025
DOMANI INSPECTION SERVICE843309/10/2024
GRASSO-MENZIUSO ARCHITECT1279505/08/2024
Building Lifecycle
All (155)Filed (11)Permit Issued (8)Signed Off (7)Violation (60)Inspection (8)Objection (39)Special Inspection (22)
01/06/2026
Violation issued (ECB, open)
Construction
04/17/2025
Violation issued (ECB, closed)
Construction
02/27/2025
Signed off — Alteration
UPGRADE OF EXISTING COMMERCIAL KITCHEN COOKING VENTILATION SYSTEM AS PER PLANS. REPLACEMENT S/S EXHAUST HOODS WITH REPLACEMENT EXHAUST/MUA DUCTS AND REPLACEMENT EXHAUST/MUA FANS TO BE INSTALLED. NO OTHER WORK TO BE DONE UNDER THIS FILING.
B00933687-S1
02/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
Yongho Kim
02/27/2025
Special inspection requirement — Mechanical Systems
Yongho Kim
02/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
02/27/2025
Special inspection requirement — Final
DAVIDSON CHRISTMAS
02/24/2025
Filed — Alteration
UPGRADE OF EXISTING COMMERCIAL KITCHEN COOKING VENTILATION SYSTEM AS PER PLANS. REPLACEMENT S/S EXHAUST HOODS WITH REPLACEMENT EXHAUST/MUA DUCTS AND REPLACEMENT EXHAUST/MUA FANS TO BE INSTALLED. NO OTHER WORK TO BE DONE UNDER THIS FILING.
B00933687-P1
01/22/2025
Signed off — Alteration
MECHANICAL WORK IN EXISTING APARTMENT 1A/1D AND 2A/2D FOR BATH EXHAUST FANS, APARTMENT SPLIT AC UNITS, ROOFTOP CONDENSORS, AND ASSOCIATED PIPING
B08037668-I1
01/08/2025
Signed off — Alteration
B07999192-I1
11/13/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2024
Violation issued (HPD, open)
C
10/30/2024
Violation issued (HPD, open)
C
10/30/2024
Violation issued (HPD, open)
A
10/30/2024
Violation issued (HPD, open)
A
09/26/2024
Signed off — Alteration
UPGRADE OF EXISTING COMMERCIAL KITCHEN COOKING VENTILATION SYSTEM AS PER PLANS. REPLACEMENT S/S EXHAUST HOODS WITH REPLACEMENT EXHAUST/MUA DUCTS AND REPLACEMENT EXHAUST/MUA FANS TO BE INSTALLED. NO OTHER WORK TO BE DONE UNDER THIS FILING.
B00933687-I1
09/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/17/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/17/2024
Special inspection requirement — Final
JOHN MCMONAGLE
09/17/2024
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
09/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Menziuso
09/16/2024
Signed off — Alteration
PLUMBING ASSOCIATED WITH THE INTERIOR RENOVATION OF APARTMENTS 1A/1D AND 2A/2D
B08037666-I1
09/10/2024
Filed — Alteration
MECHANICAL WORK IN EXISTING APARTMENT 1A/1D AND 2A/2D FOR BATH EXHAUST FANS, APARTMENT SPLIT AC UNITS, ROOFTOP CONDENSORS, AND ASSOCIATED PIPING
B08037668-P1
09/10/2024
Signed off — Alteration
COMBINATION OF UNITS 2A/2D UNDER TPPN 3/97 INCLUDING INSTALLATIONS OF PARTITIONS, DOORS, AND FINISHES AS PER PLANS. NO CHANGE TO USE OR EGRESS
B08037616-I1
09/10/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/04/2024
Violation issued (ECB, closed)
Construction
09/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/03/2024
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
09/03/2024
Special inspection requirement — Final
JOHN MCMONAGLE
08/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Menziuso
08/14/2024
Filed — Alteration
PLUMBING ASSOCIATED WITH THE INTERIOR RENOVATION OF APARTMENTS 1A/1D AND 2A/2D
B08037666-P1
07/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
06/20/2024
Signed off — Alteration
Remove 1 door in apartment 1a and 1 door in apt 2a . No change to use bulk or egress.
B01026609-I1
06/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/06/2024
Permit issued — General Construction
B01026609-I1-GC
05/30/2024
Permit issued — General Construction
B08037616-I1-GC
05/17/2024
Objection resolved — Addressed
05/14/2024
Objection raised — Scope
05/08/2024
Filed — Alteration
Remove 1 door in apartment 1a and 1 door in apt 2a . No change to use bulk or egress.
B01026609-I1
03/22/2024
Permit issued — Mechanical Systems
B00933687-S1-MS
03/05/2024
Filed — Alteration
UPGRADE OF EXISTING COMMERCIAL KITCHEN COOKING VENTILATION SYSTEM AS PER PLANS. REPLACEMENT S/S EXHAUST HOODS WITH REPLACEMENT EXHAUST/MUA DUCTS AND REPLACEMENT EXHAUST/MUA FANS TO BE INSTALLED. NO OTHER WORK TO BE DONE UNDER THIS FILING.
B00933687-S1
12/13/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/14/2023
Permit issued — General Construction
B07999192-I1-GC
10/31/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/10/2023
Permit issued — Plumbing
B00933687-I1-PL
10/01/2023
Filed — Alteration
UPGRADE OF EXISTING COMMERCIAL KITCHEN COOKING VENTILATION SYSTEM AS PER PLANS. REPLACEMENT S/S EXHAUST HOODS WITH REPLACEMENT EXHAUST/MUA DUCTS AND REPLACEMENT EXHAUST/MUA FANS TO BE INSTALLED. NO OTHER WORK TO BE DONE UNDER THIS FILING.
B00933687-I1
09/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yongho Kim
09/13/2023
Special inspection requirement — Tenant Protection Plan Compliance
Yongho Kim
07/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/29/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/09/2023
Permit issued — Plumbing
B08037666-I1-PL
04/27/2023
Permit issued — General Construction
B08037616-I1-GC
04/21/2023
Permit issued — Mechanical Systems
B08037668-I1-MS
04/03/2023
Objection resolved — Addressed
04/03/2023
Objection resolved — Addressed
04/03/2023
Objection resolved — Addressed
04/03/2023
Objection resolved — Addressed
02/13/2023
Objection resolved — Addressed
01/24/2023
Objection raised — Other
01/12/2023
Objection raised — Other
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offMERRICK REAL ESTATE GP IN06/06/2024
DOB NOWGeneral ConstructionSigned-offMERRICK REAL ESTATE GP IN05/30/2024
DOB NOWMechanical SystemsSigned-offMASTER FIRE MECH CORP03/22/2024
DOB NOWGeneral ConstructionSigned-offMERRICK REAL ESTATE GP IN11/14/2023
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR10/10/2023
DOB NOWPlumbingSigned-offCLEAN TECH MECHANICAL INC05/09/2023
DOB NOWGeneral ConstructionSigned-offMERRICK REAL ESTATE GP IN04/27/2023
DOB NOWMechanical SystemsSigned-offMERRICK REAL ESTATE GP IN04/21/2023
BISPLISSUEDLUVER PLBG & HTG INC08/16/2011
BISOTISSUEDJIMCO CONTRACTORS INC08/08/2011
BISFPISSUEDMASTER FIRE SYSTEMS, INC04/27/2010
BISPLISSUEDCC CONTROLLED PLBG CO INC12/08/2006
BISBLISSUEDCC CONTROLLED PLBG CO INC12/08/2006
2 projects · most recent 11/13/2023
General Wiring
FiledStatusContractorScope
11/13/2023Permit IssuedTOTAL ELECTRIC SOLUTIONSGeneral Wiring
08/01/2023CompleteTESTA ELECTRIC CO., INC12 meters, 12 new_meters
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/31/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
02/27/2025Tenant Protection Plan ComplianceYongho Kimspecial
02/27/2025Mechanical SystemsYongho Kimspecial
02/27/2025Fire-Resistant Penetrations and JointsYongho Kimspecial
02/27/2025FinalDAVIDSON CHRISTMASprogress
09/17/2024FinalJOHN MCMONAGLEprogress
09/17/2024Mechanical SystemsJOHN MCMONAGLEspecial
09/17/2024Tenant Protection Plan ComplianceChristopher Menziusospecial
09/03/2024Tenant Protection Plan Compliance—special
09/03/2024Mechanical SystemsJOHN MCMONAGLEspecial
09/03/2024FinalJOHN MCMONAGLEprogress
08/16/2024Tenant Protection Plan ComplianceChristopher Menziusospecial
07/18/2024Tenant Protection Plan Compliance—special
09/13/2023Fire-Resistant Penetrations and JointsYongho Kimspecial
09/13/2023Tenant Protection Plan ComplianceYongho Kimspecial
11/10/2022Tenant Protection Plan ComplianceChristopher Menziusospecial
11/09/2022FinalChristopher Menziusoprogress
11/09/2022Fire-Resistant Penetrations and JointsChristopher Menziusospecial
11/09/2022Fire-Resistance Rated ConstructionChristopher Menziusoprogress
11/04/2022Exterior Insulation and Finish Systems (EIFS)—special
11/03/2022Fire-Resistant Penetrations and Joints—special
11/03/2022Structural Stability – Alterations of existing buildings—special
11/03/2022Fire-Resistance Rated Construction—progress
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/28/2026B07999192-I1Request digital key ↗
08/28/2026B08034167-I1Request digital key ↗
08/28/2026B08037668-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits15
▸DOB NOWLPC Approval/Permit10
08/14/2026B08037666-I1Open ↗
08/13/2026B00933687-S1Open ↗
08/13/2026B00933687-P1Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
03/20/2020320146613Open ↗
02/24/2020320146613Open ↗
04/05/2010320146613Open ↗
▸BISWORK PERMIT APPLICATION1
08/29/2011320344944Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/18/2020320146613Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026B07999192-I1Open ↗
08/28/2026B08034167-I1Open ↗
08/28/2026B08037668-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/27/2026B08037616-I1Open ↗
09/27/2026B08037616-I1Open ↗
08/30/2026B08037668-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/27/2026B08037616-I1Open ↗
09/27/2026B08037616-I1Open ↗
08/30/2026B08037668-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
02/07/2012320344944Open ↗
04/05/2010320146613Open ↗
04/05/2010320146613Open ↗
▸Trade Schedules & Equipment4
▸BISEQUIPMENT USE PERMITS1
03/27/2012320344944Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
11/04/2011320344944Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
03/27/2012320344944Open ↗
▸BISSCHEDULE B - PLUMBING1
04/05/2010320146613Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/28/2026B07999192-I1Open ↗
08/28/2026B08037668-I1Open ↗
08/28/2026B08037668-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/05/2010320146613Open ↗
▸Energy Compliance2
▸BISAS-BUILT ENERGY ANALYSIS1
02/07/2012320344944Open ↗
▸BISTECHNICAL REPORT: ENERGY1
03/27/2012320344944Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
03/27/2012320344944Open ↗
02/07/2012320344944Open ↗
▸BISLANDMARKS APPROVAL1
02/07/2012320344944Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
02/07/2012320344944Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/05/2010320146613Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/07/2012320344944Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
02/07/2012320344944Open ↗
04/05/2010320146613Open ↗
▸Filing & Intake Forms1
▸BISADDITIONAL INFORMATION1
11/18/2011320344944Open ↗
▸Other Documents7
▸DOB NOWProof of Historic Building6
08/14/2026B08037666-I1Open ↗
08/13/2026B07999192-I1Open ↗
08/13/2026B08037668-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial1
08/13/2026B08034167-I1Open ↗