LL97 Covered2 Open Violations 0 unresolved · 2 paperwork only▸
ECB10/05/2020NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER FEATURE WHICH ENSURES PASSENGER SAFETY. REMEDY; FILE APPLICATION, INSTALL DLM ANothing owed — awaiting certificate of correction
ECB10/02/2020NO DOOR LOCK MONITORING INSTALLED IN THIS CONTROLLER AS MANDATED BY 3.10.12 OF APPENDIX K3 OF THE 2014 NYCBC. THIS IS A CONTROLLER FEATURE WHICH ENSURES PASSENGER SAFETY. REMEDY; FILE APPLICATION, INSTALL DLM ANothing owed — awaiting certificate of correction
Prison, jail, house of detention · 116,032 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.