← Back
Pier, dock, bulkhead
70 COLUMBIA STREET
💬 Discuss this project
0Year Built
—Stories
T2Building Class
M2-1Zoning
721,396 sfGross Floor Area
1Units
LL97 CoveredFDNY Report ↗
Pier, dock, bulkhead · Owner of record: PORT AUTHORITY OF NY AND NJ · 1,277,192 sf lot · 0.56 FAR built · Flood zone X500
Locations of Work
StructuralPlumbing
Floor 13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC ECONOMIC DEVELOPMENT CORP1204/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STRACAR ENGINEERING, P.C.412/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STRACAR ENGINEERING P C803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ECONOMY P & H CO.,INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRACAR SPECIAL INSPECTIO229212/24/2025
Building Lifecycle
All (20)Filed (4)Permit Issued (2)Signed Off (2)Inspection (3)Special Inspection (9)
01/20/2026
Signed off — Alteration
RESTORE EXISTING GAS SERVICE WITH PIPING MODIFICATIONS AS PER PLANS.
B01253501-I1
01/20/2026
Signed off — Alteration
NEW BOILER INSTALLATION AS PER PLANS
B01324470-I1
01/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MIRO Stracar
01/05/2026
Special inspection requirement — Heating Systems
MIRO Stracar
01/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
MIRO Stracar
01/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
MIRO Stracar
12/24/2025
Filed — Alteration
NEW BOILER INSTALLATION AS PER PLANS
B01324470-P1
12/23/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
MIRO Stracar
12/23/2025
Special inspection requirement — Heating Systems
MIRO Stracar
12/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MIRO Stracar
12/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
MIRO Stracar
12/16/2025
Permit issued — Boiler Equipment
B01324470-I1-BE
12/15/2025
Filed — Alteration
NEW BOILER INSTALLATION AS PER PLANS
B01324470-I1
10/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2025
Filed — Alteration
RESTORE EXISTING GAS SERVICE WITH PIPING MODIFICATIONS AS PER PLANS.
B01253501-P2
09/23/2025
Special inspection requirement — Energy Code Compliance Inspections
MIRO Stracar
09/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/18/2025
Permit issued — Plumbing
B01253501-I1-PL
07/17/2025
Filed — Alteration
RESTORE EXISTING GAS SERVICE WITH PIPING MODIFICATIONS AS PER PLANS.
B01253501-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offECONOMY P & H CO.,INC12/16/2025
DOB NOWPlumbingSigned-offECONOMY P & H CO.,INC07/18/2025
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/23/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
01/05/2026HVAC-R and service water piping design and insulationMIRO Stracarenergy_progress
01/05/2026Heating SystemsMIRO Stracarspecial
01/05/2026HVAC-R and service water heating equipmentMIRO Stracarenergy_progress
01/05/2026HVAC-R and service water heating system controlsMIRO Stracarenergy_progress
12/23/2025HVAC-R and service water heating system controlsMIRO Stracarenergy_progress
12/23/2025Heating SystemsMIRO Stracarspecial
12/23/2025HVAC-R and service water piping design and insulationMIRO Stracarenergy_progress
12/23/2025HVAC-R and service water heating equipmentMIRO Stracarenergy_progress
09/23/2025Energy Code Compliance InspectionsMIRO Stracarprogress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026B01253501-P2Request digital key ↗
08/21/2026B01253501-I1Request digital key ↗
08/19/2026B01324470-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature7
08/26/2026B01324470-I1Open ↗
08/26/2026B01324470-I1Open ↗
08/26/2026B01324470-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026B01253501-P2Open ↗
08/21/2026B01253501-I1Open ↗
08/19/2026B01324470-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B01324470-I1Open ↗
08/22/2026B01324470-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026B01253501-P2Open ↗
08/21/2026B01253501-I1Open ↗
08/19/2026B01324470-P1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs4
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter4
08/21/2026B01253501-P2Open ↗
08/21/2026B01253501-I1Open ↗
08/19/2026B01324470-I1Open ↗
Showing 3 of 4 on file for this type