HPD08/27/2026HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT G1M, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
HPD08/27/2026§ 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT G1M, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
HPD06/25/2026§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH
HPD06/25/2026HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH
HPD06/25/2026HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH
HPD06/25/2026§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH
HPD06/25/2026§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH
HPD05/08/2026§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT APT2M, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
DOB05/05/2026EMERGENCY WORK ORDER DUE TO BULGING BRICKS,SPALLING & MISSING MORTAR JOINTS BENEATH COPING STONE @ PARAPET AT EXPOSURE #4 SOUTH FACING WALL PARAPET. ALSO LOOSE METAL CAPPING AT THE SAME BUILDING BRICK WALL REMEDY: TAKE SECURE/PROVIDE SAFETY MEASURES TO SECURE PUBLIC SAFETY & EXP4 SOUTH FACING PARAPET WALL
DOB05/05/2026FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED AT TIME OF INSPECTION,I OBSERVED AT EXP1,CRACKS IN TERRACOTTA WATER TABLE ON T HE 8TH FLOOR.EXP2:CRACKS IN EYEBROW/WINDOW SILL ON 3RD FLOOR.EXP4 WEST ELEV:MISSING/SPALLING BRICKS ON THE 6TH,7TH,AND 9TH FLOORS.LOSE METAL CAPPING ON PARAPET.REMEDY:REPAIR AND/OR REPLACE ALL DAMAGES ON FACADE
ECB05/05/2026PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. AS NOTED AT TIME OF INSPECTION I OBSERVED ROTTED MUDSILLS. DEFECTIVE PARAPET PANELSPEALING FROM FRAME AND PANEL LEANING OUT, WITHOUT ADEQUET BRACING. REM$2K due
DOB11/26/2024FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB09/26/2024FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES. NOTE: AT TIME OF INSPECTION, OBSERVED AT EXPOSURE #1 COVERED/SHORED UP BRICK WORK AT EXPOSURE #4 OBSERVED DAMAGED/CRACKED SPALLING TERRA-COTTA AT PARAPET LEV$2K due
ECB02/15/2024FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#906778.REM:FILE ACCEPTABLE REPORT.$1K due
DOB11/01/2023FAILURE TO CORRECT SWARMP CONDITIONS
DOB02/21/2023CYCLE 9B UNSAFE REPORT FILED
ECB09/10/2021FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS/FACADE AND APPURTENANCES.NOTE:AT THE TIME OF INSPECTIONS VIEW AT EXPOSURE 1 NORTH ELEVATION CRACKS AT PARAPET VERTICAL CRACKS AT CORNER OF EXPOSURE 1 AND EXPOSURE 2 C$1K due
ECB03/03/2021FAILURE TO REPAIR SWARMP CONDITIONS IN A TIMELY MANNER.OWNER FAILURE TO REPAIR "REPAIR OF CRACKS WITHIN THE TERRACOTTA" WITHIN TIME FRAME RECOMMENDED BY QEWI.QEWI FRANK CAMINITE RECOMMENDED IN HIS TECHINCAL REP$1K due
ECB08/14/2020FAILURE TO MAINTAIN BUILDING IN CODE-COMPLAINT MANNER. AT TIME OF INSPECTION, OBSERVED DAMAGED, CRACKED/BULGING PARAPET WALL AT EXP #3, CRACKED MORTAR JOINT ABOVE THE WINDOW AT EXP #2 ROOF LEVEL ADJACENT TO PAR$1K due
DOB08/14/2020FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED CRACKED/BULGING PARAPET WALL AT EXPOSURE #3, CRACKED MORTAR JOINT ABOVE THE WINDOW AT EXP #2 ROOF LEVEL. CRACKED BRICK/BLOCK ABOVE DOORWAY AT EXPOSURES #2/3. CRACKS TO THE BRICK AND MORTAR JOINTS OF THE ELEVATOR BULKHEAD RIGHT SIDE OF COURTYARD IN
DOB03/30/2000AKA 70 CONVENT AVENUE
ECB04/20/2026FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #906778. AGG1: PRIOR NOV 37026483J UNDER 28-302Hearing held — result not yet published$3K proposed
ECB02/09/2021FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35540468K ISSUED ON 10/13/20 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.Nothing owed — awaiting certificate of correction
ECB01/06/2021FAILURE TO MAINTAIN BUILDING FACADE AND APPURTENANCES.NOTE:AT THE TIMEOF INSPECTION OBSERVED AT EXPOSURE 1 NORTH ELEVATION EXPOSURE 2 EAST ELEVATION EXPOSURE 3 SOUTH ELEVATION(INTERIOR YARD)AND EXPOSURE 4 WESTNothing owed — awaiting certificate of correction