4 Open Violations 2 unresolved · 2 paperwork only▸
DOB11/16/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB11/16/2016FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB08/15/2016WRK NO PERMIT.OBSERVED ON 6/20/16 @ 12PM IN BST/NEW GAS PIPING REPLACED-EWN#11787 ISSUED ON 5/25/16-NO/LAA FILED WITHIN 5 BUSINESS DAY OF CONNECT OF WRK-PHOTOS TAKEN.REM:OBTAIN A PERMITNothing owed — awaiting certificate of correction
ECB08/15/2016FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEM TESTED-OBSERVED ON 6/20/16 @ 12PM-REPLACED GAS PIPING FROM GAS METER TO BOILER ROOM WITH 1/4 GAS PIPING 3/4 GAS PIPING & FITTING-NO INSPECTION ON FILE @ TIME OF NONothing owed — awaiting certificate of correction
Two family converted from one family · 2,050 sf lot · 1.21 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.