← Back
BuildNYC
Two stories - detached, small or mid-size
70 HOLLAND AVENUE
STATEN ISLAND · BIN 5028648
💬 Discuss this project
1910Year Built
2Stories
A1Building Class
R3-2Zoning
1,832 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,600 sf lot · 0.7 FAR built · Flood zone X500
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofPhotovoltaic solar panel installationUnder Construction1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering110/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272110/30/2026
Building Lifecycle
11/09/2026
Permit issued — Solar
S01482253-I1-SL
10/30/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01482253-I1
10/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
10/30/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
10/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
7 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSunrun Installation Service11/09/2026
1 project · most recent 11/03/2026
General Wiring
FiledStatusContractorScope
11/03/2026Permit IssuedSunrun Solar ElectlGeneral Wiring
1 project · most recent 10/30/2026
FiledStatusContractorScope
10/30/2026Permit IssuedSunrun Installation Service—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/30/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
10/30/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
10/29/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
10/29/2026Energy Code Compliance InspectionsWalid Abdullaprogress
10/29/2026FinalWalid Abdullaprogress
8 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account