← Back
Walk-up cooperative
70 THOMAS STREET
MANHATTAN · BIN 1001615
💬 Discuss this project
1870Year Built
5Stories
C6Building Class
C6-2AZoning
11,500 sfGross Floor Area
5Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 70 THOMAS ST OWNERS CORP. · 2,487 sf lot · 4.62 FAR built · Flood zone X500
Locations of Work
MechanicalPlumbingEquipmentGeneral
Roof1p · 1 filing · 10 docs
Floor 22p · 2 filings · 16 docs
Floor 12p · 2 filings · 11 docs
Cellar1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
70 THOMAS STREET OWNERS4507/08/2026
70 THOMAS STREET403/22/2026
DUANE THOMAS CO.203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KWHC CONSULTING ENGINEER PLLC103/26/2021
KAM CHIU CONSULTING ENGINEER, P.C.206/12/2020
BHH ARCHITECTS106/09/2020
PACE ENGINEERING P.C.203/13/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES403/21/2026
EUROCELT EXPEDITING, INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC RENOVATION INCGeneral Contractor407/08/2026
REPUBLIC SCAFFOLD&HOIST CGeneral Contractor307/08/2026
PRACTICAL PLBG & HTG INCFire Protection207/08/2026
PRACTICAL PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL INSPECTION SERVIC1200403/26/2021
Building Lifecycle
All (71)Filed (6)Permit Issued (9)Signed Off (4)Violation (23)Objection (16)Special Inspection (13)
04/29/2026
Violation issued (HPD, open)
A
06/04/2025
Violation issued (HPD, open)
A
11/22/2024
Violation issued (HPD, closed)
I
05/06/2022
Signed off — Alteration
Plumbing work as shown on plans filed herewith.
M00346366-I1
05/05/2022
Signed off — Alteration
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
M00346372-I1
04/13/2022
Permit issued — Plumbing
M00346366-I1-PL
04/13/2022
Permit issued — Sprinklers
M00346372-I1-EW-SP
04/12/2022
Signed off — Alteration
Install (2) 5-ton VRF heat pump split system for the 1st and 2nd floor with new duct distribution as shown on plans. Install radiant floor heating for 2nd fl with a high-efficiency boiler. No change in use, egress, or occupancy.
M00346362-I1
02/16/2022
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
I
11/15/2021
Signed off — Alteration
Structural work as shown on plans filed herewith. No change in use, egress or occupancy.
M00351376-I1
07/15/2021
Permit issued — Structural
M00351376-I1-ST
07/15/2021
Permit issued — Mechanical Systems
M00346362-I1-MS
06/24/2021
Objection raised — Scope
06/24/2021
Objection resolved — Addressed
03/26/2021
Filed — Alteration
Structural work as shown on plans filed herewith. No change in use, egress or occupancy.
M00351376-I1
03/19/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Christopher Drutjons
03/19/2021
Special inspection requirement — Concrete - Cast-In-Place
Christopher Drutjons
03/19/2021
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
03/19/2021
Special inspection requirement — Structural Steel - Welding
Christopher Drutjons
03/19/2021
Special inspection requirement — Structural Steel - Details
Christopher Drutjons
03/19/2021
Special inspection requirement — Structural Steel - High Strength Bolting
Christopher Drutjons
11/18/2020
Permit issued — Sprinklers
M00346372-I1-EW-SP
11/17/2020
Permit issued — Plumbing
M00346366-I1-PL
09/13/2020
Objection raised — Other
09/13/2020
Objection resolved — Addressed
09/13/2020
Objection raised — Other
09/13/2020
Objection resolved — Addressed
09/13/2020
Objection raised — Other
09/13/2020
Objection resolved — Addressed
09/13/2020
Objection raised — Other
09/13/2020
Objection resolved — Addressed
09/03/2020
Special inspection requirement — Maintenance information
Christopher Drutjons
06/12/2020
Filed — Alteration
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
M00346372-I1
06/12/2020
Filed — Alteration
Install (2) 5-ton VRF heat pump split system for the 1st and 2nd floor with new duct distribution as shown on plans. Install radiant floor heating for 2nd fl with a high-efficiency boiler. No change in use, egress, or occupancy.
M00346362-I1
06/11/2020
Objection raised — Other
06/11/2020
Objection resolved — Addressed
06/11/2020
Objection raised — Other
06/11/2020
Objection resolved — Addressed
06/11/2020
Objection raised — Other
06/11/2020
Objection resolved — Addressed
06/09/2020
Filed — Alteration
Plumbing work as shown on plans filed herewith.
M00346366-I1
06/08/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
06/08/2020
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
05/22/2020
Special inspection requirement — Final
Christopher Drutjons
05/04/2020
Special inspection requirement — Sprinkler Systems
Christopher Drutjons
05/04/2020
Special inspection requirement — Final
Christopher Drutjons
05/04/2020
Special inspection requirement — Mechanical Systems
Christopher Drutjons
10/09/2018
Violation issued (HPD, closed)
I
08/14/2018
Permit issued — Sidewalk Shed
M00001924-I1-SH
04/06/2018
Permit issued — Sidewalk Shed
M00001924-I1-SH
03/13/2018
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH ALT 1. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00001924-P1
11/08/2017
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS IN CONJUNCTION WITH ALT 1. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2014.
M00001924-I1
11/08/2017
Permit issued — Sidewalk Shed
M00001924-I1-SH
10/01/2015
Violation issued (HPD, closed)
I
04/12/2007
Violation issued (ECB, closed)
Construction
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/24/2000
Violation issued (ECB, closed)
Construction
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPRACTICAL PLBG & HTG INC04/13/2022
DOB NOWSprinklersSigned-offPRACTICAL PLBG & HTG INC04/13/2022
DOB NOWStructuralSigned-offNYC RENOVATION INC07/15/2021
DOB NOWMechanical SystemsSigned-offNYC RENOVATION INC07/15/2021
DOB NOWSprinklersSigned-offPRACTICAL PLBG & HTG INC11/18/2020
DOB NOWPlumbingSigned-offPRACTICAL PLBG & HTG INC11/17/2020
DOB NOWSidewalk ShedPermit IssuedREPUBLIC SCAFFOLD&HOIST C08/14/2018
DOB NOWSidewalk ShedPermit IssuedREPUBLIC SCAFFOLD&HOIST C04/06/2018
DOB NOWSidewalk ShedPermit IssuedREPUBLIC SCAFFOLD&HOIST C11/08/2017
BISOTISSUEDNYC RENOVATION INC07/13/2021
BISOTISSUEDNYC RENOVATION INC12/24/2020
BISPLISSUEDARCON PLBG SOLUTIONS01/11/2018
BIS—ISSUEDKLEEN CONSTRUCTION LLC12/15/2017
BIS—ISSUEDKLEEN CONSTRUCTION LLC12/14/2017
BISEQISSUEDKLEEN CONSTRUCTION LLC12/14/2017
BISOTISSUEDWINICK PRODUCTIONS, LLC08/26/2013
BISPLISSUEDPREMIER SEWER & WATERMAIN LLC,03/11/2013
BISOTISSUEDROB HERSCHENFELD DESIGN I11/16/2012
BISPLISSUEDVICTORY PLBG & HTG INC12/21/2010
BISOTISSUEDPROBERT CONSTRUCTION CO10/08/2010
BISOTISSUEDUMANA DESIGNS INC.10/26/2007
BISEQISSUEDSOHO RESTORATION CO.,INC.01/03/2000
BIS—ISSUEDSHORESTORATION CO INC04/28/1999
BISPLRE-ISSUEDBAY RIDGE MECHNICAL CORP02/16/1999
BIS—ISSUEDTMA CONSTRUCTION INC02/03/1999
BISBLISSUEDCAPITOL FUEL OIL TRANSP.CORP.03/10/1994
3 projects · most recent 06/04/2025
General Wiring
FiledStatusContractorScope
06/04/2025CompleteNASSA ELECTRICAL CONT CORGeneral Wiring
01/28/2021CompleteADAM ELECL CONTRNG LLCGeneral Wiring
01/29/2018CompleteROMCON ELECTRIC, INC—
1 project · most recent 03/13/2018
Sidewalk Shed
FiledStatusContractorScope
03/13/2018Permit IssuedREPUBLIC SCAFFOLD&HOIST CSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
03/19/2021Structural Stability – Alterations of existing buildingsChristopher Drutjonsspecial
03/19/2021Concrete - Cast-In-PlaceChristopher Drutjonsspecial
03/19/2021Post-installed AnchorsChristopher Drutjonsspecial
03/19/2021Structural Steel - WeldingChristopher Drutjonsspecial
03/19/2021Structural Steel - DetailsChristopher Drutjonsspecial
03/19/2021Structural Steel - High Strength BoltingChristopher Drutjonsspecial
09/03/2020Maintenance informationChristopher Drutjonsenergy_progress
06/08/2020Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
06/08/2020Energy Code Compliance InspectionsChristopher Drutjonsprogress
05/22/2020FinalChristopher Drutjonsprogress
05/04/2020Sprinkler SystemsChristopher Drutjonsspecial
05/04/2020FinalChristopher Drutjonsprogress
05/04/2020Mechanical SystemsChristopher Drutjonsspecial
▾Documents — 186 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch2
09/06/2026M00001924-I1Request digital key ↗
09/06/2026M00001924-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00346372-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/14/2026M00346366-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00346362-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/14/2026M00351376-I1Request digital key ↗
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION17
05/29/2025121403285Open ↗
09/25/2020140912617Open ↗
08/12/2020140912617Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION12
12/24/2020140912617Open ↗
01/12/2018121190905Open ↗
12/19/2017121190905Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWLPC Approval/Permit3
08/13/2026M00346362-I1Open ↗
08/13/2026M00351376-I1Open ↗
08/13/2026M00346366-I1Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
03/27/2017121190905Open ↗
▸BISZONING DIAGRAM1
03/27/2017121190905Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
03/27/2017121190905Open ↗
▸Seals & Professional Certifications32
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026M00346372-I1Open ↗
08/31/2026M00346362-I1Open ↗
08/26/2026M00351376-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
12/15/2017121190905Open ↗
12/15/2017121190905Open ↗
12/22/2010120561702Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/06/2026M00001924-I1Open ↗
09/06/2026M00001924-P1Open ↗
08/13/2026M00346366-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026M00346362-I1Open ↗
08/31/2026M00346362-I1Open ↗
08/31/2026M00346362-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
03/17/2017140610710Open ↗
03/01/2017140610710Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/03/2013121757410Open ↗
12/22/2010120561702Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/30/2013121757410Open ↗
12/22/2010120561702Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/28/2020140912617Open ↗
▸Trade Schedules & Equipment11
▸BISSCHEDULE B - PLUMBING6
04/06/2017140610710Open ↗
03/27/2017121190905Open ↗
03/20/2017140610710Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
05/31/2013121403285Open ↗
06/23/2011120561702Open ↗
02/09/2011120561702Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
05/06/2022140912617Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
05/06/2022140912617Open ↗
▸Safety & Tenant Protection10
▸DOB NOWTenant Protection Plan4
08/13/2026M00346362-I1Open ↗
08/13/2026M00346366-I1Open ↗
08/13/2026M00346372-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
12/15/2017121190905Open ↗
08/15/2016121190905Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
12/15/2017121190905Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/27/2017121190905Open ↗
▸BISTPP1 FORM1
03/27/2017121190905Open ↗
▸BISTenant Protection Plan and Notes1
07/28/2020140912617Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/13/2026M00346372-I1Open ↗
08/13/2026M00346366-I1Open ↗
08/13/2026M00351376-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS-CERTIFICATION (DEP ACP5)2
11/16/2012121403285Open ↗
05/06/2010120323426Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
07/28/2020140912617Open ↗
12/15/2017121190905Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
12/22/2010120561702Open ↗
04/20/2010120323426Open ↗
▸Energy Compliance10
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
05/30/2025121403285Open ↗
05/06/2022140912617Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/15/2017121190905Open ↗
09/05/2013121757410Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/28/2020140912617Open ↗
▸BISTR8: Energy Code Progress Inspections1
11/16/2012121403285Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/30/2025121403285Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/27/2017121190905Open ↗
▸BISLIGHTING IN DWELLING UNITS1
05/30/2025121403285Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00346362-I1Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY17
05/10/2022140912617Open ↗
05/10/2022140912617Open ↗
05/06/2022140912617Open ↗
Showing 3 of 17 on file for this type
▸BISHYDRO FLOW TEST LETTER1
03/01/2017140610710Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/27/2017121190905Open ↗
▸BISSOIL REPORT1
03/27/2017121190905Open ↗
▸BISMASONRY MANUFACTURER'S STATEMENT-FORM 10H1
12/15/2017121190905Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
03/17/2017140610710Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/30/2025121403285Open ↗
▸Approvals, Objections & Sign-offs21
▸BISLANDMARKS APPROVAL6
12/15/2020140912617Open ↗
03/27/2017121190905Open ↗
09/03/2013121757410Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
11/16/2012121403285Open ↗
12/22/2010120561702Open ↗
05/06/2010120323426Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/28/2020140912617Open ↗
11/28/2016121190905Open ↗
08/15/2016121190905Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
03/27/2017121190905Open ↗
03/27/2017121190905Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
06/02/2025121403285Open ↗
05/10/2022140912617Open ↗
▸BISLANDMARKS SIGNOFF2
05/30/2025121403285Open ↗
05/10/2022140912617Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
02/08/2017121190905Open ↗
02/01/2017121190905Open ↗
▸BISFINAL1
05/30/2025121403285Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT6
07/28/2020140912617Open ↗
03/27/2017121190905Open ↗
03/01/2017140610710Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
05/30/2025121403285Open ↗
05/06/2022140912617Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
12/15/2017121190905Open ↗
▸Filing & Intake Forms17
▸BISADDITIONAL INFORMATION8
10/22/2020140912617Open ↗
09/09/2020140912617Open ↗
08/25/2020140912617Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING COVER SHEET7
03/13/2017121190905Open ↗
02/28/2017121190905Open ↗
01/09/2017121190905Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/28/2020140912617Open ↗
03/01/2017140610710Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/18/2017121190905Open ↗
11/16/2012121403285Open ↗