DOB09/14/2022FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG.
DOB04/26/2021STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION, AT 3RD FLOOR AT REAR OF BUILDING, MANSARD HAS CHARRED JOISTS, WINDOWS OUT, INTERIOR WALLS REMOVED AND WINDOWS OUT, AT 2ND FLOOR AT REAR, JOISTS CHARRED, WALLS REMOVED AND WINDOWS OUT, 1ST FLOOR REAR WALLS REMOVED, WINDOWS OUT. EXTENSIVE FIRE, WATER AND SMOKE DAMAGE THROUGHOUT.
Locations of Work
No floor-level scope or drawing coverage on file for this building.