← Back
Condo, commercial tower (mixed-use) [derived]
The 76 West 36th Street Condominium
70 WEST 36 STREET · BIN 1015916
💬 Discuss this project
1924Year Built
16Stories
RCBuilding Class
M1-9A/R12Zoning
128,315 sfGross Floor Area
28Units
LL97 Covered2 Open Violations ▸FISP: SWARMPFDNY Report ↗
Condo, commercial tower (mixed-use) [derived] · Owner of record: UNAVAILABLE OWNER · 9,875 sf lot · 12.99 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Roof1p · 1 filing · 3 docs
Floor 134p · 1 filing · 6 docs
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 16p · 2 filings · 20 docs
Mezzanine2p · 1 filing · 11 docs
Cellar12p · 5 filings · 20 docs
25 jobs · most recent 09/19/2025
General Wiring HVAC Wiring
FiledStatusContractorScope
09/19/2025CompleteVOLTAGE ELECTRIC CORP2 meters
06/06/2025CompleteMATROS AUTOMATED ELEC'L C—
04/22/2025Permit IssuedVOLTAGE ELECTRIC CORPGeneral Wiring
03/24/2025CompleteKJK ELECTRIC INCGeneral Wiring
07/12/2024CompleteEFCO ELECTRICAL SERVI INCGeneral Wiring
08/05/2023CompletePAC ELECTRIC CORP.HVAC Wiring
03/15/2022CompleteVOLTAGE ELECTRIC CORP—
07/21/2021CompleteVOLTAGE ELECTRIC CORP—
06/28/2021CompleteVOLTAGE ELECTRIC CORP—
04/23/2021CompleteTEAM ELECTRIC, INCGeneral Wiring
03/11/2021CompleteBELMONT ELECTRICAL, INCGeneral Wiring
09/16/2019Permit IssuedVOLTAGE ELECTRIC CORP—
07/22/2019Permit IssuedVOLTAGE ELECTRIC CORPGeneral Wiring
07/11/2019CompleteVOLTAGE ELECTRIC CORP—
06/21/2019CompleteVOLTAGE ELECTRIC CORP—
Building Lifecycle
All (181)Filed (27)Permit Issued (28)Signed Off (15)Facade (FISP) (13)Violation (60)Inspection (8)Special Inspection (30)
03/06/2026
Violation issued (FDNY_NOV, closed)
11/10/2025
Violation issued (FDNY_NOV, closed)
10/14/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/04/2025
Cycle 10 facade report signed — SWARMP
08/22/2025
Cycle 10 facade inspection completed
08/06/2025
Cycle 10 facade report submitted
08/05/2025
Cycle 9 facade report signed — SWARMP
07/23/2025
Cycle 9 facade inspection completed
05/01/2025
Permit issued — General Construction
M01193502-I1-GC
04/14/2025
Violation issued (FDNY_ORDER, closed)
04/14/2025
Violation issued (FDNY_ORDER, closed)
04/09/2025
Filed — Alteration
Minor Interior Renovation of Existing office space. No change in egress, use or occupancy.
M01193502-I1
03/20/2025
Special inspection requirement — Lighting controls
Shahrish Shuvo
03/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
03/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
03/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
03/20/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
03/11/2025
Special inspection requirement — Final
Shahrish Shuvo
02/12/2025
Signed off — Alteration
TO MINOR CHANGE EXISTING SPRINKLER SYSTEM, TO INSTALLED NEW HAND SINKS OF EXISTING OFFICE AT UNIT #12B ON 12 FLOOR IN CONJUNCTION WITH ALTERATION JOB #M01107987-I1 AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCPANCY.
M01075113-I1
02/06/2025
Signed off — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING OFFICE WITH GENERAL CONSTRCUTION WORK AT UNIT #12B ON 12 FLOOR AS PER PLAN. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01107987-I1
01/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/22/2025
Special inspection requirement — Lighting controls
ZHENHUAN XU
01/22/2025
Special inspection requirement — Interior lighting power
ZHENHUAN XU
01/22/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
01/22/2025
Special inspection requirement — Final
ZHENHUAN XU
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
01/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
01/22/2025
Special inspection requirement — Sprinkler Systems
NARESH MAHANGU
01/22/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
01/17/2025
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING OFFICE WITH GENERAL CONSTRCUTION WORK AT UNIT #12B ON 12 FLOOR AS PER PLAN. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01107987-P1
01/17/2025
Filed — Alteration
TO MINOR CHANGE EXISTING SPRINKLER SYSTEM, TO INSTALLED NEW HAND SINKS OF EXISTING OFFICE AT UNIT #12B ON 12 FLOOR IN CONJUNCTION WITH ALTERATION JOB #M01107987-I1 AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCPANCY.
M01075113-P1
01/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
01/16/2025
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
01/16/2025
Special inspection requirement — Sprinkler Systems
NARESH MAHANGU
01/15/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/13/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/09/2024
Permit issued — Plumbing
M01075113-I1-PL
12/09/2024
Permit issued — Sprinklers
M01075113-I1-EW-SP
11/18/2024
Permit issued — General Construction
M01107987-I1-GC
11/07/2024
Permit issued — Boiler Equipment
M01019454-I1-BE
10/30/2024
Signed off — Alteration
Adding two bathrooms and new plumbing lines for future sinks.
M01040012-I1
10/29/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/18/2024
Permit issued — General Construction
M01107987-I1-GC
10/07/2024
Filed — Alteration
TO MINOR CHANGE EXISTING SPRINKLER SYSTEM, TO INSTALLED NEW HAND SINKS OF EXISTING OFFICE AT UNIT #12B ON 12 FLOOR IN CONJUNCTION WITH ALTERATION JOB #M01107987-I1 AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCPANCY.
M01075113-I1
10/03/2024
Signed off — Alteration
Adding two bathrooms and new plumbing lines for future sinks.
M01040012-S1
10/03/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/23/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/16/2024
Permit issued — General Construction
M01107987-I1-GC
09/09/2024
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING OFFICE WITH GENERAL CONSTRCUTION WORK AT UNIT #12B ON 12 FLOOR AS PER PLAN. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01107987-I1
08/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/16/2024
Permit issued — Plumbing
M01040012-S1-PL
07/15/2024
Filed — Alteration
Adding two bathrooms and new plumbing lines for future sinks.
M01040012-S1
07/10/2024
Filed — Alteration
TO PROPOSE INTERIOR RENOVATION OF EXISTING OFFICE WITH GENERAL CONSTRCUTION WORK AT UNIT #12B ON 12 FLOOR AS PER PLAN. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
M01075112-I1
07/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
JEFF AKERMAN
07/08/2024
Permit issued — General Construction
M01040012-I1-GC
07/01/2024
Special inspection requirement — Final
ZHENHUAN XU
07/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ZHENHUAN XU
07/01/2024
Special inspection requirement — Energy Code Compliance Inspections
ZHENHUAN XU
07/01/2024
Special inspection requirement — Lighting controls
ZHENHUAN XU
07/01/2024
Special inspection requirement — Interior lighting power
ZHENHUAN XU
Latest 60 of 181 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JKAN HOLDINGS1007/08/2026
LOCAL 798 IATSE307/08/2026
ROCK GROUP NY707/08/2026
TIME EQUITIES INC AS AGENT1807/08/2026
TIME EQUITIES5707/08/2026
70 WEST 36TH STREET HOLDINGS8203/22/2026
70 W 36TH STREET HOLDINGS403/22/2026
70 WEST 36 STREET HOLDING103/22/2026
20 WEST 36 ST CONDO C/O T103/22/2026
OWNER OF 70 WEST 36 ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS303/21/2026
GREEN STUDIO403/21/2026
PDG BUILDING CONSULTANTS LLC LLC103/21/2026
DHD ARCHITECTURE203/21/2026
LOUIS STRIAR603/21/2026
AM EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MXP LLCGeneral Contractor707/08/2026
ROCK GROUP NY CORPGeneral Contractor607/08/2026
VOLTAGE ELECTRIC CORPElectrical503/22/2026
KLDNY INCGeneral Contractor403/21/2026
ACTIVE SIGNSScaffold307/08/2026
ISTVAN DANCSElectrical303/21/2026
KORNEL DESIGN INCGeneral Contractor303/21/2026
ROBERT LOGOZIOElectrical203/21/2026
PREMIER FLOW PLBG AND HTGFire Protection207/08/2026
BAR CONSTRUCTION SERVICESGeneral Contractor207/08/2026
MC2 MECHANICAL INCGeneral Contractor107/08/2026
PREMIER GROUP INCGeneral Contractor107/08/2026
TOP 2 BOTTOM IMPROVERSGeneral Contractor107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
FRANKIE PLBG & HTG L.L.CPlumbing107/08/2026
L.L.G. PLBG & HTG INCPlumbing107/08/2026
PREMIER FLOW PLBG AND HTGPlumbing107/08/2026
ALBANO TILE SETTERS INCGeneral Contractor107/08/2026
JOHN DICAPUAElectrical103/21/2026
LEONID SIMKINElectrical103/21/2026
PAC ELECTRIC CORP.Electrical103/22/2026
ROBERT COLOMBOElectrical103/21/2026
ROBERT COVELLOElectrical103/21/2026
SANCHEZ ALBERTOElectrical103/21/2026
TEAM ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524104/09/2025
HUAN DESIGN INC7669501/17/2025
NKM ENGINEERING PLLC6244201/17/2025
SIA INSPECTIONS LLC7306207/15/2024
SOLOMON ROSENZWEIG P.E. P1801406/11/2024
BAZINI ENGINEERING, P.C.1808103/25/2024
SOUTHPORT ENGINEERING ASS7514212/20/2023
JACK GREEN ASSOCIATES422106/15/2023
JOHN PATRICK BOHAN ARCHIT1189304/05/2021
RICHARD B. KORNBLAU, AIA3208101/31/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTOP 2 BOTTOM IMPROVERS05/01/2025
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.12/09/2024
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN12/09/2024
DOB NOWGeneral ConstructionSigned-offMXP LLC11/18/2024
DOB NOWBoiler EquipmentSigned-offMICHAEL S. KAPLAN11/07/2024
DOB NOWGeneral ConstructionSigned-offMXP LLC10/18/2024
DOB NOWGeneral ConstructionSigned-offMXP LLC09/16/2024
DOB NOWPlumbingSigned-offFRANKIE PLBG & HTG L.L.C07/16/2024
DOB NOWGeneral ConstructionSigned-offALBANO TILE SETTERS07/08/2024
DOB NOWGeneral ConstructionPermit IssuedKORNEL DESIGN INC05/29/2024
DOB NOWBoiler EquipmentSigned-offMICHAEL S. KAPLAN03/28/2024
DOB NOWMechanical SystemsSigned-offMC2 MECHANICAL INC06/28/2023
DOB NOWStructuralSigned-offPREMIER GROUP INC01/13/2023
DOB NOWGeneral ConstructionSigned-offBAR CONSTRUCTION SERVICES06/04/2021
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC04/25/2021
DOB NOWSprinklersSigned-offGALICJA PLBG AND HTG CORP04/17/2021
DOB NOWGeneral ConstructionSigned-offBAR CONSTRUCTION SERVICES04/07/2021
DOB NOWMechanical SystemsSigned-offKLDNY10/15/2020
DOB NOWMechanical SystemsSigned-offKLDNY07/06/2020
DOB NOWSprinklersSigned-offGALICJA PLBG AND HTG CORP06/09/2020
DOB NOWPlumbingSigned-offGALICJA PLBG AND HTG.CORP06/04/2020
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP10/03/2019
DOB NOWSupported ScaffoldPermit IssuedROCK GROUP NY CORP02/13/2019
DOB NOWSignSigned-offACTIVE SIGNS INC01/04/2019
DOB NOWSignSigned-offACTIVE SIGNS INC01/03/2019
DOB NOWSignSigned-offACTIVE SIGNS INC01/02/2019
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP12/20/2018
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP04/13/2018
BIS—ISSUEDSC CONTRACTING MANAGEMENT05/02/2025
BIS—ISSUEDSC CONTRACTING MANAGEMENT08/03/2021
BIS—ISSUEDSC CONTRACTING MANAGEMENT02/16/2021
BISFSISSUEDOLYMPIAN FUEL OIL CORP01/14/2021
BISMHISSUEDCONSTRUCTOMICS LLC10/16/2020
BISOTISSUEDCONSTRUCTOMICS LLC10/16/2020
BISOTISSUEDKLDNY INC09/30/2020
BISOTISSUEDKLDNY INC05/28/2020
BISSPISSUEDUNIVERSAL FIRE SPR LLC05/20/2020
BISSPISSUEDUNIVERSAL FIRE SPR LLC05/20/2020
BISOTISSUEDCONSTRUCTOMICS LLC03/23/2020
BISMHISSUEDCONSTRUCTOMICS LLC03/23/2020
+ 38 more permits on file
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/14/2025Pass-Final Boiler Equipment InspectionPassView ↗
01/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/15/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/29/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/03/2024Fail-Final General Construction Non-Directive 14FailView ↗
09/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
03/20/2025Lighting controlsShahrish Shuvoenergy_progress
03/20/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
03/20/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
03/20/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
03/20/2025Interior lighting powerShahrish Shuvoenergy_progress
03/11/2025FinalShahrish Shuvoprogress
01/22/2025Lighting controlsZHENHUAN XUenergy_progress
01/22/2025Interior lighting powerZHENHUAN XUenergy_progress
01/22/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
01/22/2025FinalZHENHUAN XUprogress
01/22/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
01/22/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
01/22/2025Sprinkler SystemsNARESH MAHANGUspecial
01/22/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
01/16/2025Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
01/16/2025Energy Code Compliance InspectionsZHENHUAN XUprogress
01/16/2025Sprinkler SystemsNARESH MAHANGUspecial
07/10/2024Tenant Protection Plan ComplianceJEFF AKERMANspecial
07/01/2024FinalZHENHUAN XUprogress
07/01/2024Fire-Resistant Penetrations and JointsZHENHUAN XUspecial
07/01/2024Energy Code Compliance InspectionsZHENHUAN XUprogress
07/01/2024Lighting controlsZHENHUAN XUenergy_progress
07/01/2024Interior lighting powerZHENHUAN XUenergy_progress
06/11/2024FinalJoseph Jattusoprogress
06/11/2024Fire-Resistant Penetrations and JointsSolomon Rosenzweigspecial
Latest 25 of 54.
▾Documents — 2,545 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch20
09/06/2026M00025371-I1Request digital key ↗
09/06/2026M00026038-I1Request digital key ↗
09/06/2026M00026034-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00280346-I1Request digital key ↗
09/03/2026M00336278-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/03/2026M00455742-I1Request digital key ↗
09/03/2026M00455742-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00280357-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00115162-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00279685-I1Request digital key ↗
▸Applications & Permits507
▸BISPLAN / WORK APPROVAL APPLICATION283
07/31/2025122648037Open ↗
05/02/2025122138365Open ↗
08/29/2023122138365Open ↗
Showing 3 of 283 on file for this type
▸BISWORK PERMIT APPLICATION206
05/02/2025122138365Open ↗
04/30/2025122138365Open ↗
02/17/2021122138365Open ↗
Showing 3 of 206 on file for this type
▸BISPLACE OF ASSEMBLY10
07/23/2025122648037Open ↗
06/07/2021122350561Open ↗
06/03/2021122350561Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLACE OF ASSEMBLY SIGN OFF2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications533
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION298
05/18/2020123922005Open ↗
03/06/2020140742481Open ↗
03/06/2020140742481Open ↗
Showing 3 of 298 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST74
01/04/2022123359864Open ↗
05/18/2020123922005Open ↗
Showing 2 of 74 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT52
05/18/2020123922005Open ↗
Showing 1 of 52 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/06/2026M00025371-I1Open ↗
09/06/2026M00026034-I1Open ↗
09/06/2026M00026036-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/01/2026M01075112-I1Open ↗
09/01/2026M01075112-I1Open ↗
09/01/2026M01075113-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026M01019454-I1Open ↗
09/07/2026M00279685-I1Open ↗
09/01/2026M01075112-I1Open ↗
Showing 3 of 20 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment286
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE56
12/31/2019123407287Open ↗
12/27/2019123407287Open ↗
12/03/2019123407287Open ↗
Showing 3 of 56 on file for this type
▸BISSCHEDULE B - PLUMBING55
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 55 on file for this type
▸BISSELF-CERT PLUMBING NOTICE50
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 50 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT49
01/26/2022123359864Open ↗
01/24/2022123359864Open ↗
Showing 2 of 49 on file for this type
▸BISEQUIPMENT USE PERMITS40
01/24/2022123359864Open ↗
Showing 1 of 40 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA25
02/28/2022122055596Open ↗
06/24/2020123130218Open ↗
03/27/2020123213593Open ↗
Showing 3 of 25 on file for this type
▸BISSPRINKLER INSP REPORT : FP-858
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes3
05/18/2020123922005Open ↗
Showing 1 of 3 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos142
▸BISASBESTOS: CERTIFICATION (DEP ACP5)68
05/18/2020123922005Open ↗
Showing 1 of 68 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report25
09/06/2026M00026034-I1Open ↗
09/06/2026M00026036-I1Open ↗
09/05/2026M00280346-I1Open ↗
Showing 3 of 25 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance169
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS91
05/18/2020123922005Open ↗
Showing 1 of 91 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS46
12/19/2022123249564Open ↗
12/16/2022123249564Open ↗
10/08/2021121078207Open ↗
Showing 3 of 46 on file for this type
▸BISTECHNICAL REPORT: ENERGY15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
12/19/2022123249564Open ↗
12/16/2022123249564Open ↗
01/24/2022123359864Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/21/2022122138365Open ↗
01/24/2022123359864Open ↗
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00455742-I1Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY20
12/19/2022123249564Open ↗
12/19/2022123249564Open ↗
12/16/2022123249564Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
01/17/2020122134920Open ↗
Showing 1 of 2 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/23/2022140742481Open ↗
▸Approvals, Objections & Sign-offs245
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST131
12/20/2022123249564Open ↗
03/25/2022122639902Open ↗
02/28/2022122055596Open ↗
Showing 3 of 131 on file for this type
▸BISADMINISTRATIVE OBJECTIONS50
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 50 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION36
03/25/2020123359864Open ↗
Showing 1 of 36 on file for this type
▸BISSUPERSEDING LETTER14
01/15/2021122134920Open ↗
01/15/2021122134920Open ↗
05/22/2020121116960Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
08/25/2023122138365Open ↗
07/08/2021122138365Open ↗
07/06/2021122138365Open ↗
Showing 3 of 9 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Cost, Insurance & Ownership242
▸BISCOST AFFIDAVIT239
12/19/2022123249564Open ↗
12/16/2022123249564Open ↗
09/16/2022140742481Open ↗
Showing 3 of 239 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
09/16/2022140742481Open ↗
03/25/2022122639902Open ↗
01/24/2022123359864Open ↗
▸Filing & Intake Forms306
▸BISEFILING COVER SHEET138
05/18/2020123922005Open ↗
Showing 1 of 138 on file for this type
▸BISADDITIONAL INFORMATION95
07/31/2025122648037Open ↗
01/13/2022123359864Open ↗
11/08/2021122138365Open ↗
Showing 3 of 95 on file for this type
▸BISBOROUGH INTAKE FORM67
01/15/2021122134920Open ↗
01/15/2021122134920Open ↗
05/29/2020123922005Open ↗
Showing 3 of 67 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Other Documents28
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION22
05/29/2020123922005Open ↗
05/22/2020123922005Open ↗
03/27/2020123213593Open ↗
Showing 3 of 22 on file for this type
▸BISPLOT DIAGRAM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type