Floor 1614p · 2 filings · 20 docs
ArchitectureMechanicalOther
Issued Permit Scope
General Construction · Mechanical Systems
MECHANICAL WORK FOR AC UNIT REPLACEMENT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
7 documents · 3 drawing sheets
OFFICE RENOVATION AS PER PLANS FILED HEREWITH.
On file for this project
24 documents · 1 drawing sheet
Floor 15
Floor 1431p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to the Existing Sprinkler System on Part of 14th Floor
On file for this project
6 documents · 3 drawing sheets
Replace existing lavatory with new lavatory. Reconnect new water, waste, and vent lines into existing connections. No change to use, egress or occupancy.
On file for this project
3 documents
Ducts and Piping for ventilation system associated with replacement of air handler unit filed under application M00906530.
On file for this project
9 documents
Latest 3 of 4 filings on this floor.
Floor 13
Floor 12
Floor 1112p · 2 filings · 9 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Mechanical filing herewith for HVAC Replacement. No change to use, occupancy or egress.
On file for this project
6 documents · 2 drawing sheets
11TH-FLOOR OFFICE BUILDOUT ERECT MINOR INTERIOR PARTITIONS INSTALL NEW FINISHES. NO CHANGE IN EGRESS, OCCUPANCY, OR USE.
On file for this project
3 documents
Floor 106p · 1 filing · 6 docs
Architecture
Issued Permit Scope
General Construction
General Construction Plans filed herewith for tenant improvement (office fit-out). The interior renovations consists of creating 8 new separate office spaces and an open / flexible team work area. No change to use, egress or occupancy.
On file for this project
6 documents
Floor 9
Floor 8Under Construction6p · 2 filings · 10 docs
ArchitectureGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
Plumbing work for restroom renovations in office space.
On file for this project
9 documents · 2 drawing sheets
Demolition of partitions, floors and ceilings of office on the 8th floor. The tenant will construct the space under a separate application.
On file for this project
1 document
Floor 72p · 2 filings · 14 docs
Architecture
Issued Permit Scope
General Construction
RENOVATION OF TOILETS; NEW ADA TOILET. ALL PL WORK IS TO BE FILED SEPARATELY. NO CHANGE IN EGRESS OCCUPANCY OR USE.
On file for this project
7 documents
REMOVAL OF MINOR NON-LOAD BEARING INTERIOR PARTITIONS AND HUNG CEILING TO 7TH FLOOR OFFICE. NO PL WORK UNDER THIS APPLICATION. NO CHANGE IN EGRESS OCCUPANCY OR USE.
On file for this project
7 documents
Floor 6
Floor 534p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Masonry opening and installation of roll down door between separate tax and zoning lots 85 and 81. Easement agreement not required as opening does not affect egress, light & air or party wall. 3-hour fire rated roll down door separation for fire and smoke
On file for this project
7 documents · 2 drawing sheets
Mechanical work for landlord HVAC prep & floor heat electrification only. Replace Water Cooled DX AC w/ new Water Source Heat Pump, Plate-Frame Heat Exchange & secondary loop circulator pump Add Perimeter Fan Powered Boxes & ERV. (R) all steam radiator
On file for this project
6 documents · 1 drawing sheet
EXISTING RESTROOMS FINISHES AND PARTIAL WALL REMOVAL AT LEVEL 5. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
8 documents
Latest 3 of 6 filings on this floor.
Floor 4
Floor 31p · 1 filing · 6 docs
Plumbing
Issued Permit Scope
Plumbing
Minor plumbing work as per plans, plumbing on existing roughing. No SP, FA or MH work. No change in use, egress or occupancy.
On file for this project
6 documents
Floor 2
Floor 111p · 1 filing · 3 docs
Mechanical
Issued Permit Scope
Mechanical Systems
HVAC replacement 1st floor and cellar prep. No change to use, egress or occupancy.
On file for this project
3 documents
Mezzanine12p · 3 filings · 16 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems
HVAC replacement 1st floor and cellar prep. No change to use, egress or occupancy.
On file for this project
3 documents
HEREWITH FILING PAA TO ADD DUCTWORK AND HEAT EXCHANGER TO THE APPLICATION. ORIGINAL SCOPE WAS: HVAC REPLACEMENT ON MEZZANINE LEVEL. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 7 drawing sheets
RENOVATION TO 1ST FL. MEZZ TOILET RMs. REMOVE MINOR PARTITIONS, INSTALL NEW FINISHES, REPLACE DOORS, NEW HUNG CLNG, REPLACE FIXTURES (PLUMBING WORK TO BE FILED UNDER SUB-APPLICATION AFTER APPROVAL OF THIS APPLICATION). NO CHANGE IN EGRESS OCCUPANCY OR USE
On file for this project
5 documents
Cellar14p · 1 filing · 3 docs
Mechanical
Issued Permit Scope
Mechanical Systems
HVAC replacement 1st floor and cellar prep. No change to use, egress or occupancy.
On file for this project
3 documents · 3 drawing sheets
Site & exterior8p · 2 filings · 5 docs
EquipmentGeneralStructural
Issued Permit Scope
Sidewalk Shed · Supported Scaffold
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents · 3 drawing sheets
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents · 6 drawing sheets
Filed — no permit issued26p · 6 filings · 20 docs
ArchitectureDMElectricalGeneralMechanicalPlumbing
ROOF REPAIRS
On file for this project
7 documents · 2 drawing sheets
5TH-FLOOR OFFICE BUILDOUT ERECT MINOR INTERIOR PARTITIONS AND INSTALL NEW FINISHES. NO CHANGE IN EGRESS, OCCUPANCY, OR USE.
On file for this project
6 documents
GRANITE REPLACEMENT AT MAIN ENTRANCE.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.