← Back
Public elementary, junior or senior high
J.h.s. 062 Ditmas
557 CORTELYOU ROAD · BIN 3126842
💬 Discuss this project
1956Year Built
3Stories
W1Building Class
R7BZoning
130,024 sfGross Floor Area
1Units
LL97 Covered22 Open Violations 15 unresolved · 7 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 96,400 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction71p · 1 filing · 20 docs
Floor 3Under Construction60p · 1 filing · 20 docs
Floor 2Under Construction61p · 1 filing · 20 docs
Floor 1Under Construction60p · 2 filings · 20 docs
CellarUnder Construction55p · 1 filing · 20 docs
2 jobs · most recent 04/16/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/16/2024Permit IssuedVENUS GROUP INCAir Conditioning Systems
Cooling
Mitsubishi Electric PUZ-A24NHA7 24,000 BTU · Heat Pump Outdoor ×3
PUZ-A18NKA7 18,000 BTU · Heat Pump Outdoor ×1
07/15/2022——Air Conditioning Systems
Cooling
Fujitsu ASUB36KSA1 3 tons · Fan Coil Indoor ×12
Fujitsu - AOSK120LSAN7 10 tons · Vrf Outdoor ×3
1 job · most recent 04/16/2024
Storm Water/Sanitary
FiledStatusContractorScope
04/16/2024Permit IssuedVARSITY PLBG AND HTG INCStorm, Water/Sanitary
23 jobs · most recent 07/20/2026
General Wiring Lighting
FiledStatusContractorScope
07/20/2026Permit IssuedCANDELA SYSTEMS CORP DBALighting
03/30/2026Permit IssuedCANDELA SYSTEMS CORP DBALighting
03/26/2026CancelledPLUS ELECTRIC INCLighting
06/17/2025CompleteEVEREST ELECTRIC CORP—
06/02/2025Permit IssuedA & S ELECTRIC INC.General Wiring
11/15/2024Permit IssuedACE ELEC'L CONSTRUCTIONGeneral Wiring
10/16/2024Permit IssuedBZ ELECTRIC, INCGeneral Wiring
05/21/2024Permit IssuedACE ELEC'L CONSTRUCTIONGeneral Wiring
12/04/2023Permit IssuedHIGH VOLT ELEC CORP. OFGeneral Wiring
10/30/2023CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
05/30/2023CompleteCHARAN ELEC'L ENTERP'S IN—
03/22/2023CompleteGEMINI ELECTRIC CO., INC.—
03/13/2023CompleteCHARAN ELEC'L ENTERP'S IN—
01/09/2023Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
09/28/2022CompleteCHARAN ELEC'L ENTERP'S IN—
1 job · most recent 04/16/2024
Concrete Masonry
FiledStatusContractorScope
04/16/2024Permit IssuedVENUS GROUP INCConcrete, Masonry
3 jobs · most recent 11/09/2023
Scaffold Fence Sidewalk Shed
FiledStatusContractorScope
11/09/2023Permit IssuedVENUS GROUP INCScaffold
10/30/2023Permit IssuedVENUS GROUP INCFence
10/30/2023Permit IssuedVENUS GROUP INCSidewalk Shed
Building Lifecycle
All (141)Filed (10)Permit Issued (33)Signed Off (1)Violation (60)Inspection (2)Objection (15)Special Inspection (20)
06/24/2026
Permit issued — Sidewalk Shed
B00953254-I1-SH
06/23/2026
Permit issued — Supported Scaffold
B00953316-I1-SF
06/23/2026
Permit issued — General Construction
B00785586-I1-GC
06/23/2026
Permit issued — General Construction
B00785586-I1-ST
06/23/2026
Permit issued — Construction Fence
B00953249-I1-FN
03/31/2026
Permit issued — Mechanical Systems
B00785586-S1-MS
03/30/2026
Permit issued — Plumbing
B00785586-S2-PL
03/16/2026
Permit issued — Supported Scaffold
B00953316-I1-SF
03/16/2026
Permit issued — General Construction
B00785586-I1-ST
03/16/2026
Permit issued — General Construction
B00785586-I1-GC
03/10/2026
Violation issued (ECB, open)
Construction
03/10/2026
Violation issued (ECB, open)
Construction
03/10/2026
Violation issued (ECB, open)
Construction
03/10/2026
Violation issued (ECB, open)
Construction
01/28/2026
Permit issued — Sidewalk Shed
B00953254-I1-SH
01/28/2026
Permit issued — Construction Fence
B00953249-I1-FN
01/08/2026
Permit issued — Mechanical Systems
B00785586-S1-MS
12/22/2025
Violation issued (FDNY_ORDER, closed)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/24/2025
Violation issued (FDNY_ORDER, closed)
10/24/2025
Violation issued (FDNY_ORDER, closed)
10/24/2025
Violation issued (FDNY_ORDER, closed)
10/24/2025
Violation issued (FDNY_ORDER, closed)
10/24/2025
Violation issued (FDNY_ORDER, closed)
10/24/2025
Violation issued (FDNY_ORDER, closed)
08/25/2025
Violation issued (ECB, open)
Boilers
07/02/2025
Violation issued (ECB, open)
Construction
07/02/2025
Violation issued (ECB, open)
Construction
05/09/2025
Permit issued — Mechanical Systems
B00785586-S1-MS
04/03/2025
Violation issued (FDNY_NOV, closed)
04/02/2025
Permit issued — Plumbing
B00785586-S2-PL
03/25/2025
Permit issued — General Construction
B00785586-I1-GC
03/24/2025
Permit issued — Supported Scaffold
B00953316-I1-SF
03/24/2025
Permit issued — Structural
B00785586-I1-ST
01/28/2025
Permit issued — Sidewalk Shed
B00953254-I1-SH
01/27/2025
Permit issued — Construction Fence
B00953249-I1-FN
01/06/2025
Violation issued (FDNY_ORDER, closed)
10/24/2024
Violation issued (FDNY_ORDER, closed)
10/16/2024
Objection resolved — Addressed
08/30/2024
Objection raised — Other
08/26/2024
Violation issued (FDNY_NOV, closed)
08/21/2024
Filed — Alteration
B00954152-I1
04/19/2024
Permit issued — Structural
B00785586-I1-ST
04/16/2024
Filed — Alteration
MECHANICAL WORK- REPLACE EXISTING SPLIT AC UNIT WITH NEW.
B00785586-P1
04/16/2024
Special inspection requirement — Structural Steel - Welding
MIKHAIL ZEYGMAN
04/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
04/16/2024
Special inspection requirement — Final
MIKHAIL ZEYGMAN
04/16/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MIKHAIL ZEYGMAN
04/16/2024
Special inspection requirement — Concrete - Cast-In-Place
MIKHAIL ZEYGMAN
04/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
04/16/2024
Special inspection requirement — Masonry
MIKHAIL ZEYGMAN
04/16/2024
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
04/16/2024
Special inspection requirement — Sprayed fire-resistant materials
MIKHAIL ZEYGMAN
04/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MIKHAIL ZEYGMAN
04/16/2024
Special inspection requirement — Structural Steel - Details
MIKHAIL ZEYGMAN
04/16/2024
Special inspection requirement — Structural Steel - High Strength Bolting
MIKHAIL ZEYGMAN
04/08/2024
Permit issued — Plumbing
B00785586-S2-PL
04/08/2024
Permit issued — Mechanical Systems
B00785586-S1-MS
Latest 60 of 141 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY6307/08/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION603/22/2026
DOE 040303/22/2026
NYC DOE 0103/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
DOE IS 62703/22/2026
D.O.E. IS62 0203/22/2026
I.S 62 D.O.E 0203/22/2026
IS 62 DOE 04803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EME CONSULTING ENGINEERING GROUP208/21/2024
NYC SCHOOL CONSTRUCTION AUTHORITY204/16/2024
KNF SERVICES CROP311/09/2023
NYCSCA103/01/2023
NYC SCA102/28/2023
NYMS CONSULTING, LLC102/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VENUS GROUP INCGeneral Contractor3206/28/2026
INDEPENDENT TEMPERATUREGeneral Contractor1107/08/2026
THERMO TECH MECHANICAL I*General Contractor807/08/2026
VARSITY PLBG AND HTG INCPlumbing307/08/2026
RAMNAUTH, RAMANANDElectrical103/21/2026
KELLEHER, VINCENTElectrical103/21/2026
GIOVANNI DITURIElectrical103/21/2026
CUIFFO, JAMESElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351208/21/2024
TWIN PEAKS INC.317404/16/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedVENUS GROUP INC06/24/2026
DOB NOWSupported ScaffoldPermit IssuedVENUS GROUP INC06/23/2026
DOB NOWGeneral ConstructionPermit IssuedVENUS GROUP INC06/23/2026
DOB NOWGeneral ConstructionPermit IssuedVENUS GROUP INC06/23/2026
DOB NOWConstruction FencePermit IssuedVENUS GROUP INC06/23/2026
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*03/31/2026
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC03/30/2026
DOB NOWSupported ScaffoldPermit IssuedVENUS GROUP INC03/16/2026
DOB NOWGeneral ConstructionPermit IssuedVENUS GROUP INC03/16/2026
DOB NOWGeneral ConstructionPermit IssuedVENUS GROUP INC03/16/2026
DOB NOWSidewalk ShedPermit IssuedVENUS GROUP INC01/28/2026
DOB NOWConstruction FencePermit IssuedVENUS GROUP INC01/28/2026
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*01/08/2026
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*05/09/2025
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC04/02/2025
DOB NOWGeneral ConstructionPermit IssuedVENUS GROUP INC03/25/2025
DOB NOWSupported ScaffoldPermit IssuedVENUS GROUP INC03/24/2025
DOB NOWStructuralPermit IssuedVENUS GROUP INC03/24/2025
DOB NOWSidewalk ShedPermit IssuedVENUS GROUP INC01/28/2025
DOB NOWConstruction FencePermit IssuedVENUS GROUP INC01/27/2025
DOB NOWStructuralPermit IssuedVENUS GROUP INC04/19/2024
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC04/08/2024
DOB NOWMechanical SystemsPermit IssuedTHERMO TECH MECHANICAL I*04/08/2024
DOB NOWStructuralPermit IssuedVENUS GROUP INC04/05/2024
DOB NOWSupported ScaffoldPermit IssuedVENUS GROUP INC02/14/2024
DOB NOWConstruction FencePermit IssuedVENUS GROUP INC01/31/2024
DOB NOWSidewalk ShedPermit IssuedVENUS GROUP INC01/31/2024
DOB NOWSidewalk ShedSigned-offINDEPENDENT TEMPERATURE03/30/2023
DOB NOWSidewalk ShedSigned-offINDEPENDENT TEMPERATURE10/17/2022
DOB NOWSidewalk ShedSigned-offINDEPENDENT TEMPERATURE03/28/2022
DOB NOWSidewalk ShedSigned-offINDEPENDENT TEMPERATURE03/24/2021
DOB NOWSidewalk ShedSigned-offINDEPENDENT TEMPERATURE10/30/2020
DOB NOWSidewalk ShedSigned-offINDEPENDENT TEMPERATURE03/05/2020
BISMHISSUEDINDEPENDENT TEMPERATURE04/01/2025
BISMHISSUEDINDEPENDENT TEMPERATURE04/01/2025
BISOTISSUEDINDEPENDENT TEMPERATURE04/01/2025
BISOTISSUEDINDEPENDENT TEMPERATURE04/01/2025
BISPLISSUEDFORSYTHE P&H CORP12/17/2024
BISOTISSUEDINDEPENDENT TEMPERATURE03/25/2024
BISMHISSUEDINDEPENDENT TEMPERATURE03/25/2024
+ 43 more permits on file
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
04/16/2024Structural Steel - WeldingMIKHAIL ZEYGMANspecial
04/16/2024Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
04/16/2024FinalMIKHAIL ZEYGMANprogress
04/16/2024Subsurface Conditions – Fill Placement & In-Place DensityMIKHAIL ZEYGMANspecial
04/16/2024Concrete - Cast-In-PlaceMIKHAIL ZEYGMANspecial
04/16/2024Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
04/16/2024MasonryMIKHAIL ZEYGMANspecial
04/16/2024Post-installed AnchorsMIKHAIL ZEYGMANspecial
04/16/2024Sprayed fire-resistant materialsMIKHAIL ZEYGMANspecial
04/16/2024Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
04/16/2024Structural Steel - DetailsMIKHAIL ZEYGMANspecial
04/16/2024Structural Steel - High Strength BoltingMIKHAIL ZEYGMANspecial
10/26/2023FinalAsma Hashmiprogress
10/26/2023Fire-Resistant Penetrations and JointsAsma Hashmispecial
10/26/2023Post-installed AnchorsAsma Hashmispecial
10/26/2023Mechanical SystemsAsma Hashmispecial
10/25/2023Post-installed AnchorsMIKHAIL ZEYGMANspecial
03/21/2023Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
11/16/2022Mechanical SystemsMIKHAIL ZEYGMANspecial
11/16/2022FinalMIKHAIL ZEYGMANprogress
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
08/26/2026B00953249-I1Request digital key ↗
08/26/2026B00953254-I1Request digital key ↗
08/26/2026B00953316-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00311534-I1Request digital key ↗
▸Seals & Professional Certifications29
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026B00954152-I1Open ↗
09/02/2026B00954152-I1Open ↗
09/02/2026B00954152-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026B00953316-I1Open ↗
08/25/2026B00785586-I1Open ↗
08/25/2026B00785586-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026B00954152-I1Open ↗
09/01/2026B00785586-S1Open ↗
08/28/2026B00785586-P1Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment1
▸BISFA - FDNY APPROVAL : FD-FAA1
05/03/2023302583719Open ↗
▸Safety & Tenant Protection4
▸DOB NOWNYCSCA - Approved Site Safety Plans4
08/13/2026B00953254-I1Open ↗
08/13/2026B00311534-I1Open ↗
08/13/2026B00953249-I1Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs24
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/13/2026B00785586-P1Open ↗
08/13/2026B00785586-I1Open ↗
08/13/2026B00785586-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)9
08/13/2026B00785586-S2Open ↗
08/13/2026B00785586-P1Open ↗
08/13/2026B00953254-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/13/2026B00953254-I1Open ↗
08/13/2026B00953316-I1Open ↗
08/13/2026B00953249-I1Open ↗
▸DOB NOWDEP Variance (V5) letter3
08/13/2026B00785586-I1Open ↗
08/13/2026B00785586-S1Open ↗
08/13/2026B00785586-S2Open ↗
▸Cost, Insurance & Ownership1
▸DOB NOWNYCSCA Wrap-up Insurance1
08/13/2026B00311534-I1Open ↗
▸Other Documents12
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal9
08/13/2026B00785586-S1Open ↗
08/13/2026B00785586-S2Open ↗
08/13/2026B00785586-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProof of Historic Building3
08/13/2026B00954152-I1Open ↗
08/13/2026B00785586-P1Open ↗
08/13/2026B00785586-I1Open ↗