← Back
Two family frame
701 AVENUE K
BROOKLYN · BIN 3171170
💬 Discuss this project
1930Year Built
2.5Stories
B2Building Class
R2XZoning
3,538 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family frame · Owner of record: 701 AVENUE K. LLC · 5,000 sf lot · 0.71 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction9p · 1 filing · 20 docs
Floor 3Under Construction23p · 1 filing · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HADDAD APPAREL GROUP907/10/2026
VORTEX CONSTRUCTION CORP203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BGM ENGINEERING110/22/2025
A&D ASSOCIATES, INC.210/07/2025
J.L.RAMIREZ ARCHITECTS PC108/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PROACTIVE BUILDING SOLUTIONS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JC CONSULTING & MANAGEMENTGeneral Contractor306/28/2026
SCHIMENTI CONSTRUCTION COPlumbing107/10/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI1008310/22/2025
Building Lifecycle
All (57)Filed (4)Permit Issued (4)Violation (9)Inspection (2)Objection (26)Special Inspection (12)
07/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/15/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/08/2026
Permit issued — Plumbing
B01269805-S2-PL
06/22/2026
Permit issued — Structural
B01269805-S3-ST
04/20/2026
Objection resolved — Addressed
04/15/2026
Objection raised — Cost
03/24/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/18/2026
Permit issued — General Construction
B01269805-I1-GC
02/09/2026
Objection resolved — Addressed
12/08/2025
Objection raised — Admin
11/24/2025
Objection resolved — Addressed
11/24/2025
Objection resolved — Addressed
11/24/2025
Objection resolved — Addressed
11/24/2025
Objection resolved — Addressed
11/06/2025
Permit issued — Mechanical Systems
B01269805-S1-MS
11/05/2025
Objection resolved — Addressed
10/29/2025
Objection raised — Structural
10/29/2025
Objection raised — Structural
10/29/2025
Objection raised — Structural
10/29/2025
Objection resolved — Addressed
10/29/2025
Objection resolved — Addressed
10/29/2025
Objection resolved — Addressed
10/29/2025
Objection resolved — Addressed
10/22/2025
Filed — Alteration
Mechanical work associated with partial vertical extension of 3rd floor to increase height, replacement of elevator cad within existing shaft. No change in egress, occupancy or use.
B01269805-S3
10/22/2025
Special inspection requirement — Structural Steel - Details
GLEN LANGER
10/07/2025
Filed — Alteration
Mechanical work associated with partial vertical extension of 3rd floor to increase height, replacement of elevator cad within existing shaft. No change in egress, occupancy or use.
B01269805-S1
10/07/2025
Filed — Alteration
Mechanical work associated with partial vertical extension of 3rd floor to increase height, replacement of elevator cad within existing shaft. No change in egress, occupancy or use.
B01269805-S2
09/03/2025
Objection raised — Scope
09/03/2025
Objection raised — Fire_Protection
09/03/2025
Objection raised — Inspections
09/03/2025
Objection raised — Fire_Protection
09/03/2025
Objection raised — Fire_Protection
09/03/2025
Objection raised — Fire_Protection
09/03/2025
Objection raised — Inspections
09/03/2025
Objection raised — Scope
08/20/2025
Filed — Alteration
Mechanical work associated with partial vertical extension of 3rd floor to increase height, replacement of elevator cad within existing shaft. No change in egress, occupancy or use.
B01269805-I1
08/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
GLEN LANGER
08/14/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
GLEN LANGER
08/14/2025
Special inspection requirement — Final
GLEN LANGER
08/14/2025
Special inspection requirement — Energy Code Compliance Inspections
GLEN LANGER
08/14/2025
Special inspection requirement — Demolition
GLEN LANGER
08/14/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
GLEN LANGER
08/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
GLEN LANGER
08/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
GLEN LANGER
08/11/2025
Special inspection requirement — Final
GLEN LANGER
08/11/2025
Special inspection requirement — Final
GLEN LANGER
08/11/2025
Special inspection requirement — Mechanical Systems
GLEN LANGER
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/12/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/18/1991
Violation issued (DOB, open)
VP-VIOLATION UNSERVED ECB-ACTIVE
01/18/1991
Violation issued (ECB, closed)
Construction
10/23/1990
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
08/28/1990
Violation issued (ECB, closed)
Site Safety
07/18/1990
Violation issued (ECB, closed)
Site Safety
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPIPEWORKS NYC INC07/08/2026
DOB NOWStructuralPermit IssuedJC CONSULTING & MANAGEMENT06/22/2026
DOB NOWGeneral ConstructionPermit IssuedJC CONSULTING & MANAGEME*03/18/2026
DOB NOWMechanical SystemsPermit IssuedJC CONSULTING & MANAGEME*11/06/2025
1 project · most recent 10/22/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/22/2025Permit IssuedJC CONSULTING & MANAGEME*Air Conditioning Systems
Cooling
Carrier 24AH436A300 36,000 BTU · Condensing Unit ×1
BVE08ASAASSAB57B3AABABM 950 CFM · Ahu ×1
1 project · most recent 10/22/2025
Water/Sanitary
FiledStatusContractorScope
10/22/2025Permit IssuedPIPEWORKS NYC INCWater/Sanitary
1 project · most recent 10/22/2025
Steel Wood
FiledStatusContractorScope
10/22/2025Permit IssuedPIPEWORKS NYC INCSteel, Wood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/15/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
10/22/2025Structural Steel - DetailsGLEN LANGERspecial
08/14/2025Fire-Resistance Rated ConstructionGLEN LANGERprogress
08/14/2025Wall Panels, Curtain Walls, and VeneersGLEN LANGERspecial
08/14/2025FinalGLEN LANGERprogress
08/14/2025Energy Code Compliance InspectionsGLEN LANGERprogress
08/14/2025DemolitionGLEN LANGERspecial
08/14/2025Exterior Insulation and Finish Systems (EIFS)GLEN LANGERspecial
08/14/2025Fire-Resistant Penetrations and JointsGLEN LANGERspecial
08/14/2025Structural Stability – Alterations of existing buildingsGLEN LANGERspecial
08/11/2025FinalGLEN LANGERprogress
08/11/2025FinalGLEN LANGERprogress
08/11/2025Mechanical SystemsGLEN LANGERspecial
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026B01269805-S1Request digital key ↗
08/20/2026B01269805-S2Request digital key ↗
08/15/2026B01269805-S3Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWSpecial Inspector Seal & Signature7
08/30/2026B01269805-S3Open ↗
08/28/2026B01269805-S1Open ↗
08/22/2026B01269805-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/30/2026B01269805-S3Open ↗
08/28/2026B01269805-S1Open ↗
08/22/2026B01269805-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026B01269805-S1Open ↗
08/20/2026B01269805-S3Open ↗
08/20/2026B01269805-S2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026B01269805-S1Open ↗
08/20/2026B01269805-S2Open ↗
08/15/2026B01269805-S3Open ↗
Showing 3 of 4 on file for this type