← Back
Three families
701 EAST 2 STREET
BROOKLYN · BIN 3258903
💬 Discuss this project
1990Year Built
3.5Stories
C0Building Class
R5Zoning
3,867 sfGross Floor Area
3Units
Rent Stabilized23 Open Violations 22 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · Owner of record: 701 GBL LLC · 2,142 sf lot · 1.81 FAR built · Flood zone X
Locations of Work
Architecture
Roof18p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 118p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
701 GBL LLC503/22/2026
TO THE OWNER OF 701 2ND S103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/20/2024$2.2M—— → —$582/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FOCAL POINT ARCHITECTS & ASS.309/10/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STERN ABRAHAMElectrical103/21/2026
J&R CONSTRUCTION SERVICESGeneral Contractor104/09/2026
AL PLUMBING & CONT. INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449309/10/2025
Building Lifecycle
All (97)Filed (3)Permit Issued (2)Violation (40)Inspection (2)Objection (20)Special Inspection (30)
05/04/2026
Violation issued (HPD, open)
A
03/12/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/25/2025
Violation issued (ECB, closed)
Construction
11/25/2025
Violation issued (ECB, closed)
Construction
11/19/2025
Violation issued (HPD, open)
I
11/13/2025
Permit issued — Plumbing
B01218533-S2-PL
10/30/2025
Permit issued — General Construction
B01218533-I1-GC
09/12/2025
Special inspection requirement — Permanent certificate
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Fenestration areas
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Metering
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Electric vehicle service equipment requirements
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Air barrier — testing
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Insulation placement and R values
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Protection of exposed foundation insulation
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Concrete - Cast-In-Place
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Final
Feng Zhang
09/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Fenestration air leakage
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Air barrier - visual inspection
MOHAMED MAHMOUD
09/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MOHAMED MAHMOUD
09/10/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION WITH VERTICAL EXTENSION AND HORIZONTAL ENLARGEMENT AT FIRST FLOOR TO THE REFERENCED (3) THREE FAMILES BUILIDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01218533-P1
09/08/2025
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
09/08/2025
Special inspection requirement — Concrete - Cast-In-Place
MOHAMED MAHMOUD
09/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
09/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
09/08/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
09/08/2025
Special inspection requirement — Final
Feng Zhang
09/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMED MAHMOUD
09/08/2025
Special inspection requirement — Fenestration air leakage
MOHAMED MAHMOUD
09/08/2025
Special inspection requirement — Insulation placement and R values
MOHAMED MAHMOUD
09/08/2025
Special inspection requirement — Metering
MOHAMED MAHMOUD
09/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MOHAMED MAHMOUD
09/08/2025
Special inspection requirement — Permanent certificate
08/05/2025
Objection resolved — Addressed
08/04/2025
Objection raised — Zoning
07/29/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION WITH VERTICAL EXTENSION AND HORIZONTAL ENLARGEMENT AT FIRST FLOOR TO THE REFERENCED (3) THREE FAMILES BUILIDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01218533-S2
07/25/2025
Objection resolved — Addressed
07/18/2025
Objection raised — Admin
06/17/2025
Objection resolved — Addressed
06/17/2025
Objection resolved — Addressed
06/13/2025
Objection resolved — Addressed
06/13/2025
Objection resolved — Addressed
06/13/2025
Objection resolved — Addressed
06/13/2025
Objection resolved — Addressed
06/13/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Addressed
06/09/2025
Violation issued (HPD, open)
A
05/07/2025
Objection raised — Structural
05/07/2025
Objection raised — Other
05/07/2025
Objection raised — Scope
05/07/2025
Objection raised — Scope
05/07/2025
Objection raised — Zoning
05/07/2025
Objection raised — Zoning
05/07/2025
Objection raised — Zoning
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAL PLUMBING & CONT. INC11/13/2025
DOB NOWGeneral ConstructionPermit IssuedJ&R CONSTRUCTION SERVICES10/30/2025
1 project · most recent 09/10/2025
Water/Sanitary
FiledStatusContractorScope
09/10/2025Signed-offAL PLUMBING & CONT. INCWater/Sanitary
1 project · most recent 08/25/2025
General Wiring
FiledStatusContractorScope
08/25/2025Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/12/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
09/12/2025Permanent certificateMOHAMED MAHMOUDenergy_progress
09/12/2025Fenestration areasMOHAMED MAHMOUDenergy_progress
09/12/2025MeteringMOHAMED MAHMOUDenergy_progress
09/12/2025Electric vehicle service equipment requirementsMOHAMED MAHMOUDenergy_progress
09/12/2025Air barrier — testing MOHAMED MAHMOUDenergy_progress
09/12/2025Insulation placement and R valuesMOHAMED MAHMOUDenergy_progress
09/12/2025Protection of exposed foundation insulationMOHAMED MAHMOUDenergy_progress
09/12/2025Concrete - Cast-In-PlaceMOHAMED MAHMOUDspecial
09/12/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
09/12/2025Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
09/12/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
09/12/2025FinalFeng Zhangprogress
09/12/2025Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
09/12/2025Fenestration air leakageMOHAMED MAHMOUDenergy_progress
09/12/2025Maintenance informationMOHAMED MAHMOUDenergy_progress
09/12/2025Interior lighting powerMOHAMED MAHMOUDenergy_progress
09/12/2025Air barrier - visual inspectionMOHAMED MAHMOUDenergy_progress
09/12/2025Fenestration and door U-factor and product ratingsMOHAMED MAHMOUDenergy_progress
09/08/2025Maintenance informationMOHAMED MAHMOUDenergy_progress
09/08/2025Concrete - Cast-In-PlaceMOHAMED MAHMOUDspecial
09/08/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
09/08/2025Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
09/08/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
09/08/2025FinalFeng Zhangprogress
09/08/2025Fire-Resistance Rated ConstructionMOHAMED MAHMOUDprogress
Latest 25 of 43.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026B01218533-P1Request digital key ↗
08/20/2026B01218533-S2Request digital key ↗
08/20/2026B01218533-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01218533-I1Open ↗
08/13/2026B01218533-P1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026B01218533-P1Open ↗
08/28/2026B01218533-P1Open ↗
08/26/2026B01218533-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/28/2026B01218533-P1Open ↗
08/26/2026B01218533-I1Open ↗
08/26/2026B01218533-S2Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026B01218533-S2Open ↗
08/20/2026B01218533-P1Open ↗
08/20/2026B01218533-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026B01218533-P1Open ↗
08/20/2026B01218533-S2Open ↗
08/20/2026B01218533-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/13/2026B01218533-P1Open ↗
08/13/2026B01218533-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01218533-I1Open ↗
08/13/2026B01218533-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B01218533-P1Open ↗
08/13/2026B01218533-I1Open ↗