Elevator apt, fireproof without stores
Gun Hill (NYCHA)
701 MAGENTA STREET · BIN 2093517
💬 Discuss this project
1949Year Built
14Stories
D3Building Class
R5Zoning
659,606 sfGross Floor Area
733Units
LL97 Covered14 Open Violations 7 unresolved · 7 paperwork only ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 345,256 sf lot · 1.91 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction11p · 2 filings · 20 docs
Bulkhead9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA2307/22/2026
NEW YORK CITY HOUSING AUTHORITY607/08/2026
M BHUIYAN CONSTRUCTION503/22/2026
NYC HOUSING AUTH103/22/2026
NYC HOUSING AUTHORITY803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAMAN & OUNDJIAN ENGINEERS & ARCHIT304/22/2025
JOEL PHAGOO P.E. PLLC405/15/2024
LIGHT HOUSE111/19/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LGML GROUP303/21/2026
CB EXPEDITING103/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
JOEL PHAGOO P.E. PLLC203/21/2026
JOEL PHAGOO P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZORIA HOUSING, LLCGeneral Contractor407/08/2026
M. BHUIYAN CONSTRUCTION CO.General Contractor303/21/2026
MNK ENTERPRISES LLCGeneral Contractor303/21/2026
AUJLA ELECTRIC CORPElectrical103/22/2026
ZITO, ROCCOElectrical103/21/2026
ROBERT SPALLINOElectrical103/21/2026
STEPHENS, KENNETHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MT GROUP798304/22/2025
JOEL PHAGOO ,PE, PLLC2416305/07/2024
Building Lifecycle
All (86)Filed (11)Permit Issued (11)Signed Off (5)Facade (FISP) (10)Violation (16)Inspection (2)Objection (2)Special Inspection (29)
07/21/2026
Permit issued — Suspended Scaffold
X01129660-I1-SC
03/05/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
03/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/13/2025
Signed off — Alteration
roofing replacement and rooftop structure renovation per plans herewith. no change in use, egress or occupancy under this application.
X08012214-I1
07/24/2025
Permit issued — Suspended Scaffold
X01129660-I1-SC
05/02/2025
Special inspection requirement — Concrete - Cast-In-Place
CHRISTOPHER BEHLE
05/02/2025
Special inspection requirement — Air barrier - visual inspection
CHRISTOPHER BEHLE
05/02/2025
Special inspection requirement — Insulation placement and R values
CHRISTOPHER BEHLE
05/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
CHRISTOPHER BEHLE
05/02/2025
Special inspection requirement — Final
CHRISTOPHER BEHLE
05/02/2025
Special inspection requirement — Masonry
CHRISTOPHER BEHLE
05/02/2025
Special inspection requirement — Post-installed Anchors
CHRISTOPHER BEHLE
05/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
CHRISTOPHER BEHLE
05/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTOPHER BEHLE
04/22/2025
Filed — Alteration
roofing replacement and rooftop structure renovation per plans herewith. no change in use, egress or occupancy under this application.
X08012214-P3
04/22/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Marisa Harte
04/22/2025
Special inspection requirement — Concrete - Cast-In-Place
Marisa Harte
04/22/2025
Special inspection requirement — Masonry
Marisa Harte
04/22/2025
Special inspection requirement — Post-installed Anchors
Marisa Harte
04/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Marisa Harte
04/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
Marisa Harte
04/22/2025
Special inspection requirement — Final
MICHAEL KALINOWSKI
04/22/2025
Special inspection requirement — Insulation placement and R values
Marisa Harte
04/22/2025
Special inspection requirement — Air barrier - visual inspection
Marisa Harte
04/11/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01047209-I1
04/11/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01033079-I1
04/11/2025
Signed off — Alteration
X01033085-I1
03/31/2025
Signed off — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD & MATERIAL HOIST FOR ROOF REPLACEMENT & ROOFTOP STRUCTURE RENOVATION. SUSPENDED SCAFFOLD & MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01012441-I1
03/27/2025
Permit issued — Suspended Scaffold
X01012441-I1-SC
02/15/2025
Violation issued (FDNY_NOV, closed)
11/27/2024
Permit issued — Suspended Scaffold
X01129660-I1-SC
11/13/2024
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
X01129660-I1
05/23/2024
Permit issued — Structural
X08012214-I1-GC-CX
05/15/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01033079-P1
05/14/2024
Violation issued (FDNY_NOV, closed)
05/10/2024
Permit issued — Suspended Scaffold
X01012441-P1-SC
05/07/2024
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01047209-I1
05/07/2024
Permit issued — Supported Scaffold
X01047209-I1-SF
05/07/2024
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
05/01/2024
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD & MATERIAL HOIST FOR ROOF REPLACEMENT & ROOFTOP STRUCTURE RENOVATION. SUSPENDED SCAFFOLD & MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01012441-P1
05/01/2024
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
04/23/2024
Filed — Alteration
roofing replacement and rooftop structure renovation per plans herewith. no change in use, egress or occupancy under this application.
X08012214-P1
04/10/2024
Permit issued — Sidewalk Shed
X01033079-I1-SH
04/10/2024
Permit issued — Construction Fence
X01033085-I1-FN
04/09/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01033079-I1
04/09/2024
Filed — Alteration
X01033085-I1
04/04/2024
Special inspection requirement — Insulation placement and R values
Marisa Harte
04/04/2024
Special inspection requirement — Air barrier - visual inspection
Marisa Harte
04/04/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Marisa Harte
04/04/2024
Special inspection requirement — Final
MICHAEL KALINOWSKI
04/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Marisa Harte
04/04/2024
Special inspection requirement — Post-installed Anchors
Marisa Harte
04/04/2024
Special inspection requirement — Masonry
Marisa Harte
04/04/2024
Special inspection requirement — Concrete - Cast-In-Place
Marisa Harte
04/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
Marisa Harte
03/14/2024
Permit issued — Suspended Scaffold
X01012441-I1-SC
03/14/2024
Objection raised — Other
03/14/2024
Objection resolved — Addressed
02/29/2024
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD & MATERIAL HOIST FOR ROOF REPLACEMENT & ROOFTOP STRUCTURE RENOVATION. SUSPENDED SCAFFOLD & MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BC. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X01012441-I1
12/02/2022
Violation issued (ECB, open)
Local Law
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM07/21/2026
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM07/24/2025
DOB NOWSuspended ScaffoldSigned-offZORIA HOUSING LLC03/27/2025
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM11/27/2024
DOB NOWStructuralSigned-offZORIA HOUSING, LLC05/23/2024
DOB NOWSuspended ScaffoldPermit IssuedZORIA HOUSING LLC05/10/2024
DOB NOWSupported ScaffoldSigned-offZORIA HOUSING, LLC05/07/2024
DOB NOWSidewalk ShedSigned-offMNK ENTERPRISES LLC04/10/2024
DOB NOWConstruction FenceSigned-offZORIA HOUSING, LLC04/10/2024
DOB NOWSuspended ScaffoldSigned-offZORIA HOUSING LLC03/14/2024
DOB NOWConstruction FencePermit IssuedM. BHUIYAN CONSTRUCTION C11/20/2018
BISOTISSUEDROMA SCAFFOLDING INC02/10/2015
BISOTISSUEDROMA SCAFFOLDING INC08/28/2014
BISEQISSUEDROMA SCAFFOLDING INC08/28/2014
BISEQISSUEDROMA SCAFFOLDING INC08/22/2014
BISEQISSUEDSTEALTH INC08/13/2003
BISPLISSUEDALASIA CO/GBE CONTRACTING CORP01/28/2003
BISOTISSUEDALASIA CO/GBE CONTRACTING CORP03/15/2002
BISPLISSUEDALASIA CO/GBE CONTRACTING CORP09/27/2001
BISOTISSUEDALASIA CO/GBE CONTRACTING CORP09/27/2001
BISPLISSUEDTRATAROS PLUMBING07/13/1998
BISOTISSUEDD & S PLG. & HTG/ZAFFUTO CONSTR.09/14/1994
BISPLISSUEDD & S PLG.& HTG/ZAFFUTO CONSTR.07/06/1994
BISOTISSUEDD & S PLG. & HTG/ZAFFUTO CONSTR.07/06/1994
BISPLISSUEDHI-TECH MECHANICAL, INC04/30/1990
BISSDISSUEDHI-TECH MECHANICAL, INC.03/21/1990
2 projects · most recent 10/23/2024
FiledStatusContractorScope
10/23/2024CompleteAUJLA ELECTRIC CORP—
10/23/2024CompleteAUJLA ELECTRIC CORP—
1 project · most recent 11/19/2018
Fence
FiledStatusContractorScope
11/19/2018Permit IssuedM. BHUIYAN CONSTRUCTION CFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/05/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
05/02/2025Concrete - Cast-In-PlaceCHRISTOPHER BEHLEspecial
05/02/2025Air barrier - visual inspectionCHRISTOPHER BEHLEenergy_progress
05/02/2025Insulation placement and R valuesCHRISTOPHER BEHLEenergy_progress
05/02/2025Fenestration and door U-factor and product ratingsCHRISTOPHER BEHLEenergy_progress
05/02/2025FinalCHRISTOPHER BEHLEprogress
05/02/2025MasonryCHRISTOPHER BEHLEspecial
05/02/2025Post-installed AnchorsCHRISTOPHER BEHLEspecial
05/02/2025Tenant Protection Plan ComplianceCHRISTOPHER BEHLEspecial
05/02/2025Structural Stability – Alterations of existing buildingsCHRISTOPHER BEHLEspecial
04/22/2025Fenestration and door U-factor and product ratingsMarisa Harteenergy_progress
04/22/2025Concrete - Cast-In-PlaceMarisa Hartespecial
04/22/2025MasonryMarisa Hartespecial
04/22/2025Post-installed AnchorsMarisa Hartespecial
04/22/2025Structural Stability – Alterations of existing buildingsMarisa Hartespecial
04/22/2025Tenant Protection Plan ComplianceMarisa Hartespecial
04/22/2025FinalMICHAEL KALINOWSKIprogress
04/22/2025Insulation placement and R valuesMarisa Harteenergy_progress
04/22/2025Air barrier - visual inspectionMarisa Harteenergy_progress
05/07/2024Post-installed AnchorsJOEL PHAGOOspecial
05/01/2024Post-installed AnchorsJOEL PHAGOOspecial
04/04/2024Insulation placement and R valuesMarisa Harteenergy_progress
04/04/2024Air barrier - visual inspectionMarisa Harteenergy_progress
04/04/2024Fenestration and door U-factor and product ratingsMarisa Harteenergy_progress
04/04/2024FinalMICHAEL KALINOWSKIprogress
04/04/2024Structural Stability – Alterations of existing buildingsMarisa Hartespecial
Latest 25 of 29.
▾Documents — 101 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/26/2026X00101182-I1Request digital key ↗
08/23/2026X08012214-P3Request digital key ↗
08/23/2026X08012214-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION5
02/24/2015240063925Open ↗
08/27/2014240063925Open ↗
08/27/2014240063943Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
08/27/2014240063925Open ↗
08/27/2014240063943Open ↗
08/21/2014240063934Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications32
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026X00101182-I1Open ↗
08/21/2026X01033079-P1Open ↗
08/21/2026X01033079-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
12/29/2015240063925Open ↗
08/27/2015240063934Open ↗
01/21/2015240063943Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/26/2026X08012214-I1Open ↗
08/26/2026X08012214-I1Open ↗
08/23/2026X08012214-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026X08012214-I1Open ↗
08/25/2026X01047209-I1Open ↗
08/23/2026X08012214-P3Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
08/27/2014240063925Open ↗
08/27/2014240063943Open ↗
08/21/2014240063934Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/27/2014240063925Open ↗
08/27/2014240063943Open ↗
08/21/2014240063934Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/27/2014240063925Open ↗
08/27/2014240063943Open ↗
08/21/2014240063934Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/19/2010220052582Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/19/2010220052582Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
03/19/2010220052582Open ↗
▸Environmental & Asbestos3
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
12/29/2015240063925Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/19/2010220052582Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X08012214-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/27/2014240063925Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
12/29/2015240063925Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/29/2015240063925Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/21/2014240063934Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/27/2014240063925Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/27/2014240063925Open ↗
08/27/2014240063943Open ↗
08/21/2014240063934Open ↗
▸Approvals, Objections & Sign-offs24
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/21/2026X01012441-I1Open ↗
08/21/2026X01033079-P1Open ↗
08/21/2026X01033079-I1Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
01/11/2016240063925Open ↗
12/29/2015240063925Open ↗
08/27/2015240063934Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)3
08/13/2026X08012214-I1Open ↗
08/13/2026X08012214-P1Open ↗
08/13/2026X08012214-P3Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/11/2016240063925Open ↗
05/27/2011220052582Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/19/2010220052582Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026X08012214-I1Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026X08012214-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
12/29/2015240063925Open ↗
08/27/2014240063925Open ↗
05/27/2011220052582Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET3
08/27/2014240063925Open ↗
08/27/2014240063943Open ↗
08/21/2014240063934Open ↗
▸BISEFILING COVER SHEET1
03/19/2010220052582Open ↗
▸Other Documents5
▸DOB NOWCalculations2
08/21/2026X01012441-I1Open ↗
08/13/2026X01012441-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/21/2026X01012441-I1Open ↗
08/13/2026X01012441-P1Open ↗
▸DOB NOWIRA Certification1
08/13/2026X01129660-I1Open ↗