← Back
One story retail building
7011 13 AVENUE
BROOKLYN · BIN 3157053
💬 Discuss this project
2003Year Built
1Stories
K1Building Class
R6BZoning
10,550 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
One story retail building · 10,550 sf lot · 1 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BASIC GROUPS CORP703/22/2026
MC APLINE CONSTRUCTION CO103/22/2026
MO APLINE CONSTRUCTION CO203/22/2026
UNICORO NATIONAL DEVELOPMENTS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP209/18/2024
EDWARD C. HICKS RA106/10/2022
JOSE L. PENA,P.E.205/11/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR403/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
BASIC GROUPS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIGNSTAR NYCScaffold207/08/2026
ROBERT S. COVELLOElectrical103/22/2026
M. FRIED STORE FIXTURES,General Contractor107/08/2026
L&J PLG & HTG CO OF NY INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371209/18/2024
IP CONCRETE TESTING AND I6252106/10/2022
Building Lifecycle
All (45)Filed (5)Permit Issued (4)Signed Off (3)Violation (11)Inspection (2)Objection (10)Special Inspection (10)
11/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/18/2024
Filed — Alteration
Replace existing gas pipes in the existing 1 story building. Plumbing works as per plan. No change in egress, use, or occupancy.
B01026097-P1
09/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
09/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/25/2024
Permit issued — Plumbing
B01026097-I1-PL
03/28/2024
Filed — Alteration
Replace existing gas pipes in the existing 1 story building. Plumbing works as per plan. No change in egress, use, or occupancy.
B01026097-I1
09/26/2022
Signed off — Alteration
Mechanical application hereby filed for the replacement of existing HVAC units on the roof top of an existing commercial building. Mechanical specifications and work types.
B00749891-I1
08/12/2022
Permit issued — Mechanical Systems
B00749891-I1-MS
07/19/2022
Objection raised — Scope
07/19/2022
Objection resolved — Addressed
07/19/2022
Objection resolved — Addressed
07/19/2022
Special inspection requirement — Energy Code Compliance Inspections
EDWARD HICKS
07/12/2022
Objection raised — Admin
07/12/2022
Objection resolved — Addressed
07/12/2022
Objection raised — Scope
07/12/2022
Objection resolved — Addressed
07/12/2022
Objection raised — Inspections
07/12/2022
Special inspection requirement — Shutoff dampers
EDWARD HICKS
07/05/2022
Objection resolved — Addressed
06/20/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
EDWARD HICKS
06/20/2022
Special inspection requirement — Duct leakage testing, insulation and design
EDWARD HICKS
06/17/2022
Objection raised — Scope
06/10/2022
Filed — Alteration
Mechanical application hereby filed for the replacement of existing HVAC units on the roof top of an existing commercial building. Mechanical specifications and work types.
B00749891-I1
06/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
EDWARD HICKS
06/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
EDWARD HICKS
06/02/2022
Special inspection requirement — Maintenance information
EDWARD HICKS
06/02/2022
Special inspection requirement — Mechanical Systems
INDARDEO PARBHUNATH
06/02/2022
Special inspection requirement — Final
EDWARD HICKS
07/30/2019
Signed off — Alteration
B00158827-I1
07/30/2019
Signed off — Alteration
B00158855-I1
05/29/2019
Permit issued — Sign
B00158827-I1-SG
05/29/2019
Permit issued — Sign
B00158855-I1-SG
05/11/2019
Filed — Alteration
B00158827-I1
05/11/2019
Filed — Alteration
B00158855-I1
01/09/2015
Violation issued (FDNY_NOV, closed)
08/21/2014
Violation issued (FDNY_NOV, closed)
08/21/2014
Violation issued (FDNY_NOV, closed)
06/02/2014
Violation issued (FDNY_NOV, closed)
01/10/2014
Violation issued (FDNY_NOV, closed)
11/26/2008
Violation issued (FDNY_NOV, closed)
08/27/2008
Violation issued (FDNY_NOV, closed)
10/23/2002
Violation issued (ECB, closed)
Construction
10/23/2002
Violation issued (ECB, closed)
Site Safety
10/23/2002
Violation issued (ECB, open)
Construction
10/10/1997
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offL&J PLG & HTG CO OF NY IN07/25/2024
DOB NOWMechanical SystemsSigned-offM. FRIED STORE FIXTURES,08/12/2022
DOB NOWSignSigned-offSIGNSTAR NYC05/29/2019
DOB NOWSignSigned-offSIGNSTAR NYC05/29/2019
BISEQRE-ISSUEDMC APLINE CONST CO INC10/02/2002
BIS—ISSUEDDIVERSIFIED CONST CORP10/02/2002
1 project · most recent 09/18/2024
Gas
FiledStatusContractorScope
09/18/2024Signed-offL&J PLG & HTG CO OF NY INGas
4 projects · most recent 12/20/2022
FiledStatusContractorScope
12/20/2022CompleteRAINBOW ELECTRIC CO., INC—
12/20/2022CompleteRAINBOW ELECTRIC CO., INC—
05/31/2019CompleteROBERT S. COVELLO—
05/31/2019CompleteABCO ELECTRICAL CONT CORP—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
09/18/2024Fire-Resistant Penetrations and JointsEric Sunspecial
07/19/2022Energy Code Compliance InspectionsEDWARD HICKSprogress
07/12/2022Shutoff dampersEDWARD HICKSenergy_progress
06/20/2022HVAC-R and service water piping design and insulationEDWARD HICKSenergy_progress
06/20/2022Duct leakage testing, insulation and designEDWARD HICKSenergy_progress
06/02/2022HVAC-R and service water heating system controlsEDWARD HICKSenergy_progress
06/02/2022HVAC-R and service water heating equipmentEDWARD HICKSenergy_progress
06/02/2022Maintenance informationEDWARD HICKSenergy_progress
06/02/2022Mechanical SystemsINDARDEO PARBHUNATHspecial
06/02/2022FinalEDWARD HICKSprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Sign2
09/02/2026B00158855-I1Request digital key ↗
09/02/2026B00158827-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/25/2026B01026097-P1Request digital key ↗
08/15/2026B00749891-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/02/2026B00158855-I1Open ↗
09/02/2026B00158827-I1Open ↗
08/25/2026B01026097-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B00749891-I1Open ↗
08/28/2026B00749891-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B00749891-I1Open ↗
08/25/2026B01026097-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00749891-I1Open ↗