← Back
One story retail building
Union Hall
702 UNION STREET · Name © OpenStreetMap contributors · BIN 3020176
💬 Discuss this project
1920Year Built
1Stories
K1Building Class
R6AZoning
—Gross Floor Area
1Units
3 Open Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
One story retail building · 0.8 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 12 docs
Floor 11p · 1 filing · 12 docs
Cellar2p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 702 UNION ST203/22/2026
OWNER OF 70204 UNION ST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES P. STROKE, PE310/10/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ORGANISATION ARCHITECTURE303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PETRI PLUMBING & HEATINGGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355210/10/2024
Building Lifecycle
All (21)Filed (3)Permit Issued (1)Signed Off (1)Violation (9)Special Inspection (7)
10/23/2024
Signed off — Alteration
REMOVE 2 EXSTNG 10 TON GAS FIRED PACKAGE AC ROOFTOP UNITS; REPLACE IN KIND W 2 NEW GAS-FIRED 10 TON PACKAGE AC ROOFTOP UNITS. PER SCTN AC 228-104.7. INCLDNG 2022 BLDG & MECH CODES. ASHRAE, & 2020 NYC ENERGY CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00977098-I1
10/15/2024
Special inspection requirement — Mechanical Systems
ABDALLAH ELCHERBINI
10/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
10/15/2024
Special inspection requirement — Final
ABDALLAH ELCHERBINI
10/15/2024
Special inspection requirement — Duct leakage testing, insulation and design
ABDALLAH ELCHERBINI
10/15/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ABDALLAH ELCHERBINI
10/15/2024
Special inspection requirement — HVAC-R and service water heating equipment
ABDALLAH ELCHERBINI
10/15/2024
Special inspection requirement — HVAC-R and service water heating system controls
ABDALLAH ELCHERBINI
10/10/2024
Filed — Alteration
REMOVE 2 EXSTNG 10 TON GAS FIRED PACKAGE AC ROOFTOP UNITS; REPLACE IN KIND W 2 NEW GAS-FIRED 10 TON PACKAGE AC ROOFTOP UNITS. PER SCTN AC 228-104.7. INCLDNG 2022 BLDG & MECH CODES. ASHRAE, & 2020 NYC ENERGY CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00977098-P2
10/01/2024
Permit issued — Mechanical Systems
B00977098-I1-MS
08/29/2024
Filed — Alteration
REMOVE 2 EXSTNG 10 TON GAS FIRED PACKAGE AC ROOFTOP UNITS; REPLACE IN KIND W 2 NEW GAS-FIRED 10 TON PACKAGE AC ROOFTOP UNITS. PER SCTN AC 228-104.7. INCLDNG 2022 BLDG & MECH CODES. ASHRAE, & 2020 NYC ENERGY CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00977098-P1
08/10/2024
Violation issued (FDNY_NOV, closed)
01/16/2024
Filed — Alteration
REMOVE 2 EXSTNG 10 TON GAS FIRED PACKAGE AC ROOFTOP UNITS; REPLACE IN KIND W 2 NEW GAS-FIRED 10 TON PACKAGE AC ROOFTOP UNITS. PER SCTN AC 228-104.7. INCLDNG 2022 BLDG & MECH CODES. ASHRAE, & 2020 NYC ENERGY CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B00977098-I1
12/05/2011
Violation issued (FDNY_NOV, closed)
04/29/2009
Violation issued (ECB, closed)
Unknown
04/21/2008
Violation issued (ECB, open)
Public Assembly
04/21/2008
Violation issued (ECB, open)
Public Assembly
10/17/2007
Violation issued (ECB, closed)
Construction
05/12/2007
Violation issued (ECB, open)
Public Assembly
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offPETRI PLUMBING & HEATING10/01/2024
BISOTISSUEDQUIRK LTD06/02/2017
BISMHISSUEDMASTER FIRE PREVENTION INC01/23/2008
BISFPISSUEDMASTER FIRE SYSTEMS, INC10/18/2007
BISSPISSUEDFLYTIGER PLB & HTG LTD01/17/2006
BIS—ISSUEDPILLAR PLANNING & CONST09/21/2005
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/15/2024Mechanical SystemsABDALLAH ELCHERBINIspecial
10/15/2024Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
10/15/2024FinalABDALLAH ELCHERBINIprogress
10/15/2024Duct leakage testing, insulation and designABDALLAH ELCHERBINIenergy_progress
10/15/2024HVAC-R and service water piping design and insulationABDALLAH ELCHERBINIenergy_progress
10/15/2024HVAC-R and service water heating equipmentABDALLAH ELCHERBINIenergy_progress
10/15/2024HVAC-R and service water heating system controlsABDALLAH ELCHERBINIenergy_progress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026B00977098-P1Request digital key ↗
08/26/2026B00977098-P2Request digital key ↗
08/26/2026B00977098-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
06/06/2017321572712Open ↗
01/23/2008310082932Open ↗
10/18/2007310035663Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
05/18/2017321572712Open ↗
10/10/2007310035663Open ↗
▸Seals & Professional Certifications14
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
06/06/2017321572712Open ↗
06/06/2017321572712Open ↗
01/23/2008310082932Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/13/2026B00977098-I1Open ↗
08/13/2026B00977098-P2Open ↗
08/13/2026B00977098-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/24/2026B00977098-I1Open ↗
08/24/2026B00977098-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/18/2017321572712Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/18/2017321572712Open ↗
▸BISPC FULL REPORT1
01/15/2008310082932Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026B00977098-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
10/10/2007310035663Open ↗
▸Safety & Tenant Protection2
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/06/2017321572712Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/06/2017321572712Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026B00977098-I1Open ↗
08/13/2026B00977098-P1Open ↗
08/13/2026B00977098-P2Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/15/2008310082932Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/10/2007310035663Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/18/2017321572712Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
06/06/2017321572712Open ↗
06/06/2017321572712Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
01/15/2008310082932Open ↗
10/10/2007310035663Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
05/18/2017321572712Open ↗
01/23/2008310082932Open ↗
10/18/2007310035663Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
06/06/2017321572712Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/22/2017321572712Open ↗