← Back
Two family converted from one family
7023 RIDGE CREST TERRACE
BROOKLYN · Bay Ridge · BIN 3146260
💬 Discuss this project
1925Year Built
2Stories
B3Building Class
R3-2Zoning
1,938 sfGross Floor Area
2Units
Two family converted from one family · 1,942 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 22p · 1 filing · 20 docs
Floor 1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/09/2023$1.0M—Private party → Private party$534/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE704/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THINK DESIGN ARCHITECTURE703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNITED INDUSTRIES & CONSTGeneral Contractor307/08/2026
PAPPAS & FODERA ELECT'LElectrical203/22/2026
MARINO PLBG AND HTG, INCPlumbing207/08/2026
RITE-FLO P.H.& COOLING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738704/11/2025
Building Lifecycle
All (45)Filed (7)Permit Issued (5)Signed Off (3)Inspection (5)Special Inspection (25)
04/21/2025
Signed off — Alteration
Application is filed for plumbing work only in conjunction with filing #B00950977-I1.
B00950977-S2
04/18/2025
Signed off — Alteration
Application is filed for plumbing work only in conjunction with filing #B00950977-I1.
B00950977-S1
04/18/2025
Signed off — Alteration
Application is filed for plumbing work only in conjunction with filing #B00950977-I1.
B00950977-I1
04/11/2025
Filed — Alteration
Application is filed for plumbing work only in conjunction with filing #B00950977-I1.
B00950977-P4
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
04/08/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
04/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
03/13/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/25/2025
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
anthony santoro
02/25/2025
Special inspection requirement — Heating Systems
anthony santoro
02/25/2025
Special inspection requirement — Mechanical Systems
anthony santoro
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
02/25/2025
Special inspection requirement — Final
anthony santoro
02/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
02/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
02/25/2025
Special inspection requirement — Maintenance information
anthony santoro
02/25/2025
Special inspection requirement — Shutoff dampers
anthony santoro
02/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
02/25/2025
Special inspection requirement — Permanent certificate
anthony santoro
02/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
02/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
02/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
02/21/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
02/20/2025
Filed — Alteration
Application is filed for plumbing work only in conjunction with filing #B00950977-I1.
B00950977-P3
02/20/2025
Filed — Alteration
Application is filed for plumbing work only in conjunction with filing #B00950977-I1.
B00950977-P2
02/20/2025
Filed — Alteration
Application is filed for plumbing work only in conjunction with filing #B00950977-I1.
B00950977-P1
02/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
02/10/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
02/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
02/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
02/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
anthony santoro
02/10/2025
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
02/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
01/28/2025
Permit issued — Plumbing
B00950977-S2-PL
07/16/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/30/2024
Permit issued — Plumbing
B00950977-S2-PL
05/24/2024
Permit issued — General Construction
B00950977-I1-GC
05/21/2024
Permit issued — Mechanical Systems
B00950977-S1-MS
12/28/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/04/2023
Permit issued — Plumbing
B00950977-S2-PL
11/16/2023
Filed — Alteration
Application is filed for plumbing work only in conjunction with filing #B00950977-I1.
B00950977-S2
11/16/2023
Filed — Alteration
Application is filed for plumbing work only in conjunction with filing #B00950977-I1.
B00950977-S1
11/15/2023
Filed — Alteration
Application is filed for plumbing work only in conjunction with filing #B00950977-I1.
B00950977-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMARINO PLBG AND HTG, INC01/28/2025
DOB NOWPlumbingSigned-offMARINO PLBG AND HTG, INC05/30/2024
DOB NOWGeneral ConstructionSigned-offUNITED INDUSTRIES & CONST05/24/2024
DOB NOWMechanical SystemsSigned-offUNITED INDUSTRIES & CONST05/21/2024
DOB NOWPlumbingSigned-offDJ PLUMBING & HEATING COR12/04/2023
1 project · most recent 02/28/2025
General Wiring
FiledStatusContractorScope
02/28/2025CompletePAPPAS & FODERA ELECT'LGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/13/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/16/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/28/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/28/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
04/08/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
04/08/2025Energy Code Compliance Inspectionsanthony santoroprogress
04/08/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
02/25/2025Exhaust and Vent Systems in Plenums and Ductsanthony santorospecial
02/25/2025Heating Systemsanthony santorospecial
02/25/2025Mechanical Systemsanthony santorospecial
02/25/2025Energy Code Compliance Inspectionsanthony santoroprogress
02/25/2025Finalanthony santoroprogress
02/25/2025HVAC-R and service water heating equipmentanthony santoroenergy_progress
02/25/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
02/25/2025Maintenance informationanthony santoroenergy_progress
02/25/2025Shutoff dampersanthony santoroenergy_progress
02/25/2025HVAC-R and service water heating system controlsanthony santoroenergy_progress
02/25/2025Permanent certificateanthony santoroenergy_progress
02/21/2025Structural Stability – Alterations of existing buildingsanthony santorospecial
02/21/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
02/21/2025Fire-Resistance Rated Constructionanthony santoroprogress
02/21/2025Energy Code Compliance Inspectionsanthony santoroprogress
02/10/2025Fire-Resistance Rated Constructionanthony santoroprogress
02/10/2025Energy Code Compliance Inspectionsanthony santoroprogress
02/10/2025HVAC-R and service water piping design and insulationanthony santoroenergy_progress
02/10/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
02/10/2025Structural Stability – Alterations of existing buildingsanthony santorospecial
02/10/2025Energy Code Compliance Inspectionsanthony santoroprogress
02/10/2025Fire-Resistant Penetrations and Jointsanthony santorospecial
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026B00950977-P4Request digital key ↗
08/26/2026B00950977-P2Request digital key ↗
08/26/2026B00950977-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWRestrictive Declaration/Easement 17
08/26/2026B00950977-P1Open ↗
08/13/2026B00950977-P2Open ↗
08/13/2026B00950977-P4Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026B00950977-P4Open ↗
08/31/2026B00950977-P4Open ↗
08/26/2026B00950977-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026B00950977-P4Open ↗
08/26/2026B00950977-P2Open ↗
08/26/2026B00950977-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026B00950977-P4Open ↗
08/26/2026B00950977-S1Open ↗
08/26/2026B00950977-P3Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026B00950977-P2Open ↗
08/26/2026B00950977-P4Open ↗
08/26/2026B00950977-P1Open ↗
Showing 3 of 6 on file for this type