← Back
BuildNYC
Single or multiple dwelling with stores or offices
7024 13TH AVENUE
BROOKLYN · Dyker Heights · BIN 3157033
💬 Discuss this project
1927Year Built
3Stories
S9Building Class
R6BZoning
5,670 sfGross Floor Area
7Units
Rent Stabilized32 Active Violations 30 unresolved · 2 paperwork only 7 old, status unconfirmed ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · 1,890 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCommercial kitchen hood and ductwork installation for deli1p · 1 filing · 5 docs
Floor 1Commercial kitchen hood and ductwork installation for deli2p · 1 filing · 5 docs
CellarNew boilers installation in cellar boiler room4p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAA203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NSC Architecture501/27/2023
Ashraf104/29/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NSC Architecture1003/21/2026
Superior Fire Control103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.D.S. Plumbing and Heatingspecialty_contractor203/21/2026
A.D.S. Plumbing and HeatingPlumbing207/08/2026
Inara ElectricElectrical103/22/2026
Superior Fire ControlGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NSC Architecture2016111/10/2022
Ashraf1973104/29/2022
Building Lifecycle
All (92)Filed (6)Permit Issued (4)Signed Off (3)Violation (60)Inspection (2)Special Inspection (17)
05/01/2026
Violation issued (HPD, closed)
A
06/05/2025
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/03/2024
Violation issued (HPD, closed)
A
11/06/2023
Signed off — Alteration
INSTALLATION OF NEW BOILERS AT CELLAR BOILER ROOM.
B00625330-I1
11/03/2023
Signed off — Alteration
B00482319-I1
11/03/2023
Signed off — Alteration
INSTALLATION OF NEW BOILERS AT CELLAR BOILER ROOM.
B00625330-S1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/20/2023
Violation issued (HPD, closed)
A
03/02/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/28/2023
Permit issued — Boiler Equipment
B00625330-S1-BE
01/27/2023
Filed — Alteration
INSTALLATION OF NEW BOILERS AT CELLAR BOILER ROOM.
B00625330-P2
01/27/2023
Special inspection requirement — Tenant Protection Plan Compliance
01/27/2023
Special inspection requirement — Heating Systems
01/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas SCIRE-CHIANETTA
01/27/2023
Special inspection requirement — Maintenance information
Nicholas SCIRE-CHIANETTA
01/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas SCIRE-CHIANETTA
01/27/2023
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas SCIRE-CHIANETTA
01/25/2023
Filed — Alteration
INSTALLATION OF NEW BOILERS AT CELLAR BOILER ROOM.
B00625330-P1
01/24/2023
Special inspection requirement — Heating Systems
01/24/2023
Special inspection requirement — Tenant Protection Plan Compliance
01/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas SCIRE-CHIANETTA
01/24/2023
Special inspection requirement — Maintenance information
Nicholas SCIRE-CHIANETTA
01/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas SCIRE-CHIANETTA
01/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas SCIRE-CHIANETTA
01/12/2023
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
11/10/2022
Filed — Alteration
INSTALLATION OF NEW BOILERS AT CELLAR BOILER ROOM.
B00625330-S1
09/23/2022
Permit issued — Boiler Equipment
B00625330-I1-BE
06/10/2022
Permit issued — Mechanical Systems
B00704983-I1-MS
04/29/2022
Filed — Alteration
INSTALL NEW KITCHEN COMMERCIAL HOOD AND DUCTWORK AS PER PLANS FOR EXISTING DELI. NO CHANGE IN USE,EGRESS OR OCCUPANCY
B00704983-I1
03/23/2022
Special inspection requirement — Mechanical Systems
AKM HOQUE
03/23/2022
Special inspection requirement — Final
BRIAN MCCAFFREY
02/18/2022
Violation issued (HPD, closed)
A
12/08/2021
Filed — Alteration
INSTALLATION OF NEW BOILERS AT CELLAR BOILER ROOM.
B00625330-I1
11/04/2021
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas SCIRE-CHIANETTA
11/04/2021
Special inspection requirement — Maintenance information
Nicholas SCIRE-CHIANETTA
11/04/2021
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas SCIRE-CHIANETTA
04/26/2021
Permit issued — General Construction
B00482319-I1-GC
04/06/2021
Violation issued (HPD, closed)
A
03/29/2021
Filed — Alteration
B00482319-I1
06/20/2020
Violation issued (HPD, open)
B
06/20/2020
Violation issued (HPD, open)
C
03/23/2020
Violation issued (HPD, closed)
B
03/23/2020
Violation issued (HPD, closed)
B
03/23/2020
Violation issued (HPD, closed)
B
03/23/2020
Violation issued (HPD, closed)
B
03/23/2020
Violation issued (HPD, closed)
C
03/23/2020
Violation issued (HPD, closed)
C
03/23/2020
Violation issued (HPD, open)
C
03/23/2020
Violation issued (HPD, open)
C
03/23/2020
Violation issued (HPD, open)
C
01/14/2020
Violation issued (HPD, open)
B
01/14/2020
Violation issued (HPD, closed)
C
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/18/2019
Violation issued (ECB, open)
Construction
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offA.D.S. Plumbing and Heating02/28/2023
DOB NOWBoiler EquipmentSigned-offA.D.S. Plumbing and Heating09/23/2022
DOB NOWMechanical SystemsPermit IssuedSuperior Fire Control06/10/2022
DOB NOWGeneral ConstructionSigned-offA.D.S. Plumbing and Heating04/26/2021
BISPLISSUEDA.D.S. Plumbing and Heating09/01/2023
BISPLISSUEDA.D.S. Plumbing and Heating05/05/2021
BISBLISSUEDD&D Plumbing and Heating01/19/1996
BISPLISSUEDD&D Plumbing and Heating01/19/1996
1 project · most recent 04/29/2022
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/29/2022Permit IssuedSuperior Fire ControlVentilation Systems
Ventilation
Pen Vent USBI18DD 2,300 CFM · Kitchen Exhaust ×1
2 projects · most recent 11/19/2018
General Wiring
FiledStatusContractorScope
11/19/2018CompleteInara ElectricGeneral Wiring
09/18/2018CompleteApex ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/02/2023Pass-Final Boiler Equipment InspectionPassView ↗
01/12/2023Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
01/27/2023Tenant Protection Plan Compliance—special
01/27/2023Heating Systems—special
01/27/2023HVAC-R and service water piping design and insulationNicholas SCIRE-CHIANETTAenergy_progress
01/27/2023Maintenance informationNicholas SCIRE-CHIANETTAenergy_progress
01/27/2023HVAC-R and service water heating system controlsNicholas SCIRE-CHIANETTAenergy_progress
01/27/2023HVAC-R and service water heating equipmentNicholas SCIRE-CHIANETTAenergy_progress
01/24/2023Heating Systems—special
01/24/2023Tenant Protection Plan Compliance—special
01/24/2023HVAC-R and service water heating system controlsNicholas SCIRE-CHIANETTAenergy_progress
01/24/2023Maintenance informationNicholas SCIRE-CHIANETTAenergy_progress
01/24/2023HVAC-R and service water piping design and insulationNicholas SCIRE-CHIANETTAenergy_progress
01/24/2023HVAC-R and service water heating equipmentNicholas SCIRE-CHIANETTAenergy_progress
03/23/2022Mechanical SystemsAKM HOQUEspecial
03/23/2022FinalBRIAN MCCAFFREYprogress
11/04/2021HVAC-R and service water heating system controlsNicholas SCIRE-CHIANETTAenergy_progress
11/04/2021Maintenance informationNicholas SCIRE-CHIANETTAenergy_progress
11/04/2021HVAC-R and service water heating equipmentNicholas SCIRE-CHIANETTAenergy_progress
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00482319-I1Request digital key ↗
08/29/2026B00704983-I1Request digital key ↗
08/28/2026B00625330-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION10
10/10/2023321771212Open ↗
10/04/2023321771212Open ↗
09/22/2023321771212Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION5
09/08/2023321771212Open ↗
08/25/2023321771212Open ↗
05/06/2021321771212Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00482319-I1Open ↗
08/29/2026B00704983-I1Open ↗
08/28/2026B00625330-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026B00704983-I1Open ↗
08/26/2026B00625330-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/08/2018321771212Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/08/2018321771212Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026B00704983-I1Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING5
10/04/2023321771212Open ↗
09/21/2023321771212Open ↗
08/02/2023321771212Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/08/2018321771212Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
06/08/2018321771212Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00482319-I1Open ↗
08/29/2026B00704983-I1Open ↗
08/28/2026B00625330-S1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/08/2018321771212Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/06/2023321771212Open ↗
11/06/2023321771212Open ↗
11/03/2023321771212Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/03/2023321771212Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/07/2023321771212Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/08/2018321771212Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/06/2023321771212Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00625330-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
11/03/2023321771212Open ↗
11/03/2023321771212Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSUPERSEDING LETTER2
05/06/2021321771212Open ↗
03/03/2021321771212Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/08/2023321771212Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/03/2023321771212Open ↗
06/08/2018321771212Open ↗
▸Filing & Intake Forms4
▸BISBOROUGH INTAKE FORM2
05/06/2021321771212Open ↗
03/03/2021321771212Open ↗
▸BISADDITIONAL INFORMATION1
10/22/2021321771212Open ↗
▸BISEFILING COVER SHEET1
06/08/2018321771212Open ↗
▸Other Documents1
▸BISMAINTENANCE INFORMATION1
11/07/2023321771212Open ↗