Office with commercial, 1-6 stories
703 MIDWOOD STREET
BROOKLYN · Prospect Lefferts Gardens-Wingate · BIN 3106882
💬 Discuss this project
2024Year Built
4Stories
O5Building Class
R6Zoning
19,274 sfGross Floor Area
4Units
0 Open ViolationsFDNY Report ↗
Office with commercial, 1-6 stories · Owner of record: 703 MIDWOOD LLC · 4,517 sf lot · 4.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof23p · 1 filing · 20 docs
Floor 418p · 1 filing · 20 docs
Floor 319p · 1 filing · 20 docs
Floor 218p · 1 filing · 20 docs
Floor 117p · 1 filing · 20 docs
Cellar19p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LIANI DEVELOPMENT GROUP407/08/2026
703 MIDWOOD4104/09/2026
ROCK BUILDERS503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EYAL LEVITT ARCHITECT PC1308/21/2025
GARFINKEL ARCHITECT, PLLC504/22/2025
TITAN ENGINEERS PC708/29/2024
ASHRAF CORP206/26/2024
MJE PROFESSIONAL SERVICES105/04/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CITY EXPEDITING3603/21/2026
BK CONSTRUCTIONDBA SRT CONSTRUCTION203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK BUILDERS INCGeneral Contractor1807/08/2026
BK CONSTRUCTION SVCS INCGeneral Contractor603/21/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
HEXAGON INDUSTRIES INCGeneral Contractor107/08/2026
QUALITY PIPING, INCFire Protection107/08/2026
NESS MECHANICAL P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161905/09/2025
Building Lifecycle
All (185)Filed (28)Permit Issued (18)Signed Off (10)Violation (5)Inspection (14)Objection (80)Special Inspection (30)
12/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/08/2025
Signed off — New Building
PLUMBING PLANS FILED HEREWITH
B08001298-S6
12/08/2025
Signed off — New Building
PLUMBING PLANS FILED HEREWITH
B08001298-S5
12/08/2025
Signed off — New Building
PLUMBING PLANS FILED HEREWITH
B08001298-S9
12/03/2025
Signed off — New Building
PLUMBING PLANS FILED HEREWITH
B08001298-S4
11/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/29/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
09/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
09/18/2025
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
09/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
08/29/2025
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
08/29/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
08/29/2025
Special inspection requirement — Metering
FAHAD FATEH
08/29/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
GEORGE CAMBOURAKIS
08/29/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
FAHAD FATEH
08/29/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/29/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
08/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/29/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
08/29/2025
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
08/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/29/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/25/2025
Violation issued (ECB, closed)
Construction
08/21/2025
Filed — New Building
PLUMBING PLANS FILED HEREWITH
B08001298-B4
08/19/2025
Permit issued — General Construction
B08001298-I1-GC
08/07/2025
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
08/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
08/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
08/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
07/21/2025
Permit issued — Mechanical Systems
B08001298-S6-MS
07/21/2025
Violation issued (ECB, closed)
Cranes and Derricks
07/21/2025
Violation issued (ECB, closed)
Construction
07/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/14/2025
Permit issued — Plumbing
B08001298-S9-PL
06/20/2025
Permit issued — Standpipe
B08001298-S4-EW-SP
06/20/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
06/20/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
06/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
06/20/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
06/20/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
06/06/2025
Objection resolved — Addressed
05/29/2025
Objection resolved — Addressed
05/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/23/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/23/2025
Special inspection requirement — Heating Systems
FAHAD FATEH
05/23/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/23/2025
Special inspection requirement — Standpipe Systems
FAHAD FATEH
05/21/2025
Objection raised — Energy
05/09/2025
Filed — New Building
PLUMBING PLANS FILED HEREWITH
B08001298-S9
05/09/2025
Filed — New Building
PLUMBING PLANS FILED HEREWITH
B08001298-B2
05/09/2025
Filed — New Building
PLUMBING PLANS FILED HEREWITH
B08001298-B3
05/05/2025
Objection raised — Other
04/22/2025
Filed — New Building
PLUMBING PLANS FILED HEREWITH
B08001298-B1
04/03/2025
Signed off — New Building
PLUMBING PLANS FILED HEREWITH
B08001298-S3
04/01/2025
Signed off — New Building
PLUMBING PLANS FILED HEREWITH
B08001298-S1
02/20/2025
Violation issued (ECB, closed)
Unknown
01/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 185 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedROCK BUILDERS INC08/19/2025
DOB NOWMechanical SystemsSigned-offROCK BUILDERS INC07/21/2025
DOB NOWPlumbingSigned-offNESS MECHANICAL P & H INC07/14/2025
DOB NOWStandpipeSigned-offQUALITY PIPING, INC06/20/2025
DOB NOWStructuralSigned-offROCK BUILDERS INC01/27/2025
DOB NOWMechanical SystemsSigned-offROCK BUILDERS INC11/27/2024
DOB NOWSupported ScaffoldSigned-offBK CONSTRUCTION SVCS INC06/27/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC06/25/2024
DOB NOWGeneral ConstructionPermit IssuedROCK BUILDERS INC06/21/2024
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC06/13/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN04/18/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC04/16/2024
DOB NOWConstruction FenceSigned-offROCK BUILDERS INC03/04/2024
DOB NOWStructuralSigned-offROCK BUILDERS INC03/01/2024
DOB NOWFoundationSigned-offROCK BUILDERS INC03/01/2024
DOB NOWSupport of ExcavationSigned-offROCK BUILDERS INC03/01/2024
DOB NOWGeneral ConstructionPermit IssuedROCK BUILDERS INC03/01/2024
DOB NOWConstruction FenceSigned-offHEXAGON INDUSTRIES INC05/18/2023
BIS—ISSUEDHEXAGON INDUSTRIES INC01/04/2024
BISPLISSUEDSTARLITE PLBG & HTG CORP10/23/2012
BIS—ISSUEDLIANI DEVELOPMENT GROUP05/08/2012
BISEQISSUEDLIANI DEVELOPMENT GROUP04/25/2012
BIS—ISSUEDLIANI DEVELOPMENT GROUP04/25/2012
1 project · most recent 08/21/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/21/2025Permit IssuedROCK BUILDERS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PEFY-P96NMHSU-E 96,000 BTU · Vrf Indoor ×36
PUHY-EP240TSNU-A 240,000 BTU · Vrf Outdoor ×12
PEFY-P72NMHSU-E 72,000 BTU · Vrf Indoor ×6
PKA-A24KA7.TH 24,000 BTU · Fan Coil Indoor ×6
PKA-A24KA8 24,000 BTU · Condensing Unit ×3
PLA-A24EA7R1.TH 24,000 BTU · Vrf Indoor ×3
PLA-A24EA8 24,000 BTU · Vrf Indoor ×3
PUHY-EP144TNU-A 144,000 BTU · Vrf Outdoor ×3
PUZ-A24NHA7 24,000 BTU · Condensing Unit ×3
Ventilation
Mitsubishi Electric LGH-F600RVX2-E 600 CFM · Erv ×12
LGH-F380RVX2-E 380 CFM · Erv ×3
1 project · most recent 08/21/2025
Sprinkler System
FiledStatusContractorScope
08/21/2025Signed-offQUALITY PIPING, INCSprinkler System
1 project · most recent 08/21/2025
Storm Water/Sanitary
FiledStatusContractorScope
08/21/2025Signed-offQUALITY PIPING, INCStorm, Water/Sanitary
6 projects · most recent 06/21/2025
General Wiring
FiledStatusContractorScope
06/21/2025CompleteDENALI ELECTRIC CORP—
03/05/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
08/07/2024CompletePOWER DIRECT ELECTRIC INC—
07/16/2024CompleteDENALI ELECTRIC CORP—
06/14/2024CompleteHIGH QUALITY ELECTRIC OF—
04/16/2024CancelledAPS ELECTRIC INC—
1 project · most recent 08/21/2025
Concrete Masonry
FiledStatusContractorScope
08/21/2025Permit IssuedROCK BUILDERS INCConcrete, Masonry
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
12/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/02/2024Pass-Final PL - UndergroundPassView ↗
12/02/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/07/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/25/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/18/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 141
DateRequirementInspectorRole
09/18/2025Maintenance informationSHAHRIAR QUAYYUMenergy_progress
09/18/2025HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
09/18/2025HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
09/18/2025HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
08/29/2025MeteringFAHAD FATEHenergy_progress
08/29/2025Protection of exposed foundation insulationFAHAD FATEHenergy_progress
08/29/2025Lighting controlsFAHAD FATEHenergy_progress
08/29/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/29/2025Subsurface Investigations (Borings/Test Pits)GEORGE CAMBOURAKISspecial
08/29/2025Electrical motors and elevatorsFAHAD FATEHenergy_progress
08/29/2025Maintenance informationFAHAD FATEHenergy_progress
08/29/2025Exterior lighting powerFAHAD FATEHenergy_progress
08/29/2025Interior lighting powerFAHAD FATEHenergy_progress
08/29/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/29/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
08/29/2025Wall Panels, Curtain Walls, and VeneersFAHAD FATEHspecial
08/07/2025Maintenance informationSHAHRIAR QUAYYUMenergy_progress
08/07/2025HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
08/07/2025HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
08/07/2025HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
06/20/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
06/20/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
06/20/2025Fenestration areasFAHAD FATEHenergy_progress
06/20/2025Fenestration air leakageFAHAD FATEHenergy_progress
06/20/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
Latest 25 of 141.
▾Documents — 249 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch28
08/27/2026B00863326-I1Request digital key ↗
08/24/2026B01064422-I1Request digital key ↗
08/24/2026B01064422-S1Request digital key ↗
Showing 3 of 28 on file for this type
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION7
09/07/2023340898540Open ↗
01/05/2023322111530Open ↗
08/22/2013320368026Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation6
03/04/2024340898540Open ↗
02/28/2024340898540Open ↗
02/15/2024340898540Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION3
01/04/2024322111530Open ↗
11/07/2012320368026Open ↗
05/09/2012320368026Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/27/2013320368026Open ↗
▸Zoning, Tax Lot & Property Records40
▸DOB NOWRestrictive Declaration/Easement 125
08/24/2026B08001298-A9Open ↗
08/24/2026B08001298-A8Open ↗
08/24/2026B08001298-A7Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/24/2026B08001298-B1Open ↗
08/24/2026B08001298-A9Open ↗
08/24/2026B08001298-A3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/24/2026B08001298-B1Open ↗
08/24/2026B08001298-A9Open ↗
08/24/2026B08001298-A3Open ↗
Showing 3 of 5 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
10/24/2013320368026Open ↗
▸BISZONING DIAGRAM1
03/19/2012320368026Open ↗
▸BISZONING EXHIBIT I- CERTIFICATION1
03/23/2012320368026Open ↗
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
03/23/2012320368026Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/24/2026B08001298-I1Open ↗
▸Seals & Professional Certifications72
▸DOB NOWDPL-1: Design Professional Seal & Signature28
08/24/2026B08001298-A9Open ↗
08/24/2026B08001298-A8Open ↗
08/24/2026B08001298-A7Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026B08001298-P9Open ↗
09/01/2026B08001298-A8Open ↗
09/01/2026B08001298-A8Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/01/2026B08001298-P9Open ↗
09/01/2026B08001298-A8Open ↗
09/01/2026B08001298-S5Open ↗
Showing 3 of 20 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/07/2023340898540Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/07/2023340898540Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
05/03/2012320368026Open ↗
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/24/2026B08001298-A9Open ↗
08/24/2026B08001298-A3Open ↗
08/24/2026B08001298-P3Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
12/14/2012320368026Open ↗
12/11/2012320368026Open ↗
09/30/2011320368026Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
03/29/2013320368026Open ↗
01/10/2013320368026Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
01/04/2024322111530Open ↗
▸Safety & Tenant Protection16
▸DOB NOWStreet Tree Checklist5
08/24/2026B08001298-B1Open ↗
08/24/2026B08001298-A9Open ↗
08/24/2026B08001298-A3Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST3
11/13/2023340898540Open ↗
10/16/2023340898540Open ↗
09/30/2011320368026Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
01/04/2024322111530Open ↗
05/03/2012320368026Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
05/03/2012320368026Open ↗
▸BISBPP: STREET TREES SITE PLAN1
10/16/2023340898540Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
01/04/2024322111530Open ↗
▸DOB NOWStreet Trees Site Plan1
08/24/2026B08001298-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/24/2026B08001298-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/24/2026B08001298-I1Open ↗
▸Environmental & Asbestos3
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/30/2011320368026Open ↗
▸BISRODENT CONTROL1
01/04/2024322111530Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/04/2024322111530Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/24/2026B08001298-S6Open ↗
08/24/2026B08001298-S5Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/03/2012320368026Open ↗
▸Inspections & Test Reports12
▸DOB NOWSOIL REPORT9
08/24/2026B08001298-B1Open ↗
08/24/2026B08001298-A9Open ↗
08/24/2026B08001298-A3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/24/2026B08001298-S2Open ↗
08/24/2026B08001298-S1Open ↗
08/24/2026B08001298-I1Open ↗
▸Approvals, Objections & Sign-offs12
▸BISLETTERS - SUPPORTING DOCUMENTATION5
01/04/2024322111530Open ↗
01/04/2024322111530Open ↗
01/04/2024322111530Open ↗
Showing 3 of 5 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM2
10/24/2013320368026Open ↗
10/24/2013320368026Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
09/30/2011320368026Open ↗
03/14/2012320368026Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/30/2011320368026Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/13/2025340898540Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
10/24/2013320368026Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
09/30/2011320368026Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
01/04/2024322111530Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
01/04/2024322111530Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION5
10/24/2013320368026Open ↗
08/01/2013320368026Open ↗
07/17/2013320368026Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET2
01/05/2023322111530Open ↗
09/30/2011320368026Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/07/2023340898540Open ↗
▸BISBOROUGH INTAKE FORM1
01/05/2023322111530Open ↗
▸Other Documents23
▸DOB NOWSite Survey: Initial5
08/24/2026B08001298-B1Open ↗
08/24/2026B08001298-A9Open ↗
08/24/2026B08001298-A3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/24/2026B08001298-A9Open ↗
08/24/2026B08001298-A3Open ↗
08/24/2026B08001298-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/24/2026B08001298-A9Open ↗
08/24/2026B08001298-A3Open ↗
08/24/2026B08001298-P3Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
09/07/2023340898540Open ↗
09/07/2023340898540Open ↗
▸BISPlot Diagram2
10/24/2013320368026Open ↗
09/30/2011320368026Open ↗
▸DOB NOWAdjoining Owners Notification2
08/24/2026B08001298-S2Open ↗
08/24/2026B08001298-S1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/04/2024322111530Open ↗
▸DOB NOWFinal Survey1
08/24/2026B08001298-I1Open ↗