← Back
Zoned commercial or Manhattan residential
703 MYRTLE AVENUE
BROOKLYN · BIN 3399083
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R7DZoning
0 sfGross Floor Area
0Units
Zoned commercial or Manhattan residential · Owner of record: MYRTLE SPENCER LLC · 8,620 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 2 docs
Floor 10Under Construction1 filing · 2 docs
Floor 9Under Construction1p · 2 filings · 20 docs
Floor 8Under Construction1 filing · 2 docs
Floor 7Under Construction1 filing · 2 docs
Floor 6Under Construction1 filing · 2 docs
Floor 5Under Construction1p · 2 filings · 4 docs
Floor 4Under Construction1 filing · 2 docs
Floor 3Under Construction1 filing · 2 docs
Floor 2Under Construction1p · 2 filings · 20 docs
Floor 1Under Construction1p · 2 filings · 20 docs
CellarUnder Construction2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP809/13/2026
BLUE SHINE BUILDERS INC DBA BLUE SK2308/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/18/2025$10.8M—703 MYRTLE LLC → MYRTLE SPENCER LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2003/21/2026
AVALON DESIGNS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE CONSTR NYC LLCGeneral Contractor708/21/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor508/14/2026
SWIFT SERVICES CORPGeneral Contractor104/09/2026
MPI PLUMBING CORPPlumbing107/23/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEXUS INSPECTIONS AND TES9686706/29/2026
Building Lifecycle
All (103)Filed (18)Permit Issued (14)Signed Off (1)Inspection (7)Objection (33)Special Inspection (30)
08/20/2026
Permit issued — Structural
B01269810-S2-ST
08/13/2026
Permit issued — Protection and Mechanical Methods
B01438103-I1-PMM
08/11/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01444220-I1
08/11/2026
Permit issued — Protection and Mechanical Methods
B01444220-I1-PMM
08/06/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/29/2026
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01438103-I1
07/28/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE & SYSTEM SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01437031-I1
07/28/2026
Permit issued — Supported Scaffold
B01437031-I1-SF
07/28/2026
Special inspection requirement — Structural Steel - Welding
07/28/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Bin Li
07/28/2026
Special inspection requirement — Post-installed Anchors
07/28/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Junda Qiu
07/28/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Junda Qiu
07/28/2026
Special inspection requirement — Structural Steel - Details
07/28/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Junda Qiu
07/28/2026
Special inspection requirement — Subgrade Inspections
Junda Qiu
07/27/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01436675-I1
07/27/2026
Filed — Alteration
B01436674-I1
07/27/2026
Permit issued — Protection and Mechanical Methods
B01436675-I1-PMM
07/27/2026
Permit issued — Sidewalk Shed
B01436674-I1-SH
07/22/2026
Permit issued — Plumbing
B01269810-S7-PL
07/21/2026
Objection resolved — Addressed
07/15/2026
Objection raised — Other
06/29/2026
Filed — New Building
FOUNDATION AND EARTHWORK SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #B01269810-I1.
B01269810-P3
06/29/2026
Special inspection requirement — Structural Steel - Details
06/29/2026
Special inspection requirement — Structural Steel - Welding
06/29/2026
Special inspection requirement — Post-installed Anchors
06/26/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Junda Qiu
06/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Bin Li
06/26/2026
Special inspection requirement — Subgrade Inspections
Junda Qiu
06/26/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Junda Qiu
06/26/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Junda Qiu
06/17/2026
Permit issued — Structural
B01269810-S2-ST
06/10/2026
Permit issued — Structural
B01269810-S2-ST
06/10/2026
Permit issued — Support of Excavation
B01269810-S4-SE
06/10/2026
Permit issued — Earth Work
B01269810-S3-FO-EA
06/10/2026
Permit issued — Construction Fence
B01269810-S1-FN
04/22/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/02/2026
Objection raised — Other
04/02/2026
Objection raised — Other
03/29/2026
Objection raised — Other
03/20/2026
Signed off — Full Demolition
Full Demolition of One Story Building.
B01186584-I1
03/18/2026
Objection resolved — Addressed
03/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Junda Qiu
03/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Junda Qiu
03/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
Junda Qiu
03/16/2026
Special inspection requirement — Maintenance information
Junda Qiu
03/11/2026
Permit issued — Full Demolition
B01186584-I1-FD
03/11/2026
Objection resolved — Addressed
03/10/2026
Filed — New Building
FOUNDATION AND EARTHWORK SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #B01269810-I1.
B01269810-S7
03/10/2026
Filed — New Building
FOUNDATION AND EARTHWORK SPECIFICATIONS FILED IN CONJUNCTION WITH NB APPLICATION #B01269810-I1.
B01269810-S6
03/10/2026
Special inspection requirement — Maintenance information
03/10/2026
Special inspection requirement — Energy Code Compliance Inspections
03/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
03/10/2026
Special inspection requirement — Shutoff dampers
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedINNOVATIVE CONSTR NYC LLC08/20/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.08/13/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.08/11/2026
DOB NOWSupported ScaffoldPermit IssuedCORE SCAFFOLD SYSTEMS INC.07/28/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCORE SCAFFOLD SYSTEMS INC.07/27/2026
DOB NOWSidewalk ShedPermit IssuedCORE SCAFFOLD SYSTEMS INC.07/27/2026
DOB NOWPlumbingPermit IssuedMPI PLUMBING CORP07/22/2026
DOB NOWStructuralPermit IssuedINNOVATIVE CONSTR NYC LLC06/17/2026
DOB NOWStructuralPermit IssuedINNOVATIVE CONSTR NYC LLC06/10/2026
DOB NOWSupport of ExcavationPermit IssuedINNOVATIVE CONSTR NYC LLC06/10/2026
DOB NOWEarth WorkPermit IssuedINNOVATIVE CONSTR NYC LLC06/10/2026
DOB NOWConstruction FencePermit IssuedINNOVATIVE CONSTR NYC LLC06/10/2026
DOB NOWFull DemolitionSigned-offSWIFT SERVICES CORP03/11/2026
DOB NOWConstruction FencePermit IssuedINNOVATIVE CONSTR NYC LLC01/12/2026
1 project · most recent 06/29/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/29/2026Permit IssuedINNOVATIVE CONSTR NYC LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin RXTA48AAVJU 52,000 BTU · Vrf Outdoor ×23
RXTA60AAVJU 60,000 BTU · Vrf Outdoor ×16
RXTA36AAVJU 40,000 BTU · Vrf Outdoor ×2
RZA18AAVJU 20,000 BTU · Condensing Unit ×1
1 project · most recent 06/29/2026
Sprinkler System
FiledStatusContractorScope
06/29/2026——Sprinkler System
1 project · most recent 06/29/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/29/2026Permit IssuedMPI PLUMBING CORPGas, Storm, Water/Sanitary
4 projects · most recent 09/08/2026
FiledStatusContractorScope
09/08/2026Permit IssuedKWONG MING ELECTRIC INC—
08/07/2026Permit IssuedSOLAS ELECTRICAL CORP—
07/28/2026Permit IssuedSOLAS ELECTRICAL CORP—
06/21/2026Permit IssuedHIVOLTS ELECTRICAL INC1 meters, 1 new_meters
1 project · most recent 06/29/2026
Concrete
FiledStatusContractorScope
06/29/2026Permit IssuedINNOVATIVE CONSTR NYC LLCConcrete
3 projects · most recent 07/28/2026
Fence Scaffold
FiledStatusContractorScope
07/28/2026Permit IssuedCORE SCAFFOLD SYSTEMS INCScaffold
06/29/2026Permit IssuedINNOVATIVE CONSTR NYC LLCFence
05/30/2025Permit IssuedINNOVATIVE CONSTR NYC LLCFence
1 project · most recent 06/29/2026
Earthwork
FiledStatusContractorScope
06/29/2026Permit IssuedINNOVATIVE CONSTR NYC LLCEarthwork
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/06/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/02/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
07/28/2026Excavations - Sheeting, Shoring, and BracingJunda Qiuspecial
07/28/2026Construction Operations Influencing Adjacent StructuresJunda Qiuspecial
07/28/2026Structural Steel - Details—special
07/28/2026Subsurface Conditions – Fill Placement & In-Place DensityJunda Qiuspecial
07/28/2026Subsurface Investigations (Borings/Test Pits)Bin Lispecial
07/28/2026Post-installed Anchors—special
07/28/2026Structural Steel - Welding—special
07/28/2026Subgrade InspectionsJunda Qiuspecial
06/29/2026Structural Steel - Details—special
06/29/2026Structural Steel - Welding—special
06/29/2026Post-installed Anchors—special
06/26/2026Subgrade InspectionsJunda Qiuspecial
06/26/2026Subsurface Conditions – Fill Placement & In-Place DensityJunda Qiuspecial
06/26/2026Construction Operations Influencing Adjacent StructuresJunda Qiuspecial
06/26/2026Excavations - Sheeting, Shoring, and BracingJunda Qiuspecial
06/26/2026Subsurface Investigations (Borings/Test Pits)Bin Lispecial
03/16/2026HVAC-R and service water heating equipmentJunda Qiuenergy_progress
03/16/2026HVAC-R and service water piping design and insulationJunda Qiuenergy_progress
03/16/2026HVAC-R and service water heating system controlsJunda Qiuenergy_progress
03/16/2026Maintenance informationJunda Qiuenergy_progress
03/10/2026Energy Code Compliance Inspections—progress
03/10/2026Post-installed Anchors—special
03/10/2026Fire-Resistant Penetrations and Joints—special
03/10/2026HVAC-R and service water heating system controls—energy_progress
03/10/2026Maintenance information—energy_progress
Latest 25 of 62.
▾Documents — 115 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/22/2026B01186584-I1Request digital key ↗
08/21/2026B01233405-I1Request digital key ↗
08/20/2026B01269810-S9Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
03/04/2026340922032Open ↗
▸Zoning, Tax Lot & Property Records14
▸DOB NOWRestrictive Declaration/Easement 111
08/20/2026B01269810-S9Open ↗
08/20/2026B01269810-P1Open ↗
08/20/2026B01269810-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/20/2026B01269810-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/20/2026B01269810-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/20/2026B01269810-I1Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/21/2026B01233405-I1Open ↗
08/20/2026B01269810-S6Open ↗
08/20/2026B01269810-S7Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026B01269810-P2Open ↗
09/01/2026B01269810-P2Open ↗
08/31/2026B01269810-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/22/2026B01269810-S7Open ↗
09/01/2026B01269810-P2Open ↗
08/26/2026B01269810-I1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/04/2026340922032Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/04/2026340922032Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026B01186584-I1Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWElectric Cut-Off1
08/13/2026B01186584-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01186584-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01186584-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01186584-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/20/2026B01269810-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/20/2026B01269810-I1—
▸Safety & Tenant Protection4
▸BISBPP: STREET TREES SITE PLAN1
03/04/2026340922032Open ↗
▸BISSTREET TREE CHECKLIST1
03/04/2026340922032Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/20/2026B01269810-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/20/2026B01269810-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWOER: Notice to Proceed7
08/20/2026B01269810-I1Open ↗
08/15/2026B01269810-S7Open ↗
08/15/2026B01269810-S6Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
03/04/2026340922032Open ↗
▸DOB NOWRodent Control1
08/13/2026B01186584-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01186584-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/20/2026B01269810-P2Open ↗
08/15/2026B01269810-P3Open ↗
08/13/2026B01269810-S4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B01269810-S3Open ↗
08/13/2026B01269810-S4Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
03/04/2026340922032Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/04/2026340922032Open ↗
▸Other Documents10
▸DOB NOWProperty Ownership Certification2
08/20/2026B01269810-I1Open ↗
08/13/2026B01186584-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/15/2026B01269810-S4Open ↗
08/14/2026B01269810-S3Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/04/2026340922032Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01186584-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01186584-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/20/2026B01269810-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/20/2026B01269810-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01186584-I1Open ↗