← Back
Five to six families
704 PRESIDENT STREET
BROOKLYN · Park Slope · BIN 3020300
💬 Discuss this project
1920Year Built
3Stories
C2Building Class
R6BZoning
4,344 sfGross Floor Area
5Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Five to six families · 1,750 sf lot · 2.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipment
Roof11p · 2 filings · 20 docs
Floor 45p · 1 filing · 4 docs
Floor 35p · 1 filing · 4 docs
Floor 237p · 2 filings · 20 docs
Floor 143p · 3 filings · 20 docs
Cellar48p · 5 filings · 20 docs
Basement1p · 1 filing · 4 docs
Sub-Basement43p · 3 filings · 20 docs
Site & exterior3p · 2 filings · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IVAN DESIGN ENG. ANALYSIS, PLLC205/04/2023
PAUL PERDEK, PROF. ENG. PLLC208/03/2022
LL ENGINEERING PC804/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
N N CONSULTANT2003/21/2026
DANICO SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J S REMODELING NY INCGeneral Contractor1007/08/2026
LAKHI GENERAL CONTRACTORGeneral Contractor207/08/2026
PLBG P & H INCPlumbing207/08/2026
CLEMENT CHAMBERSElectrical103/21/2026
PETER MILLERElectrical103/21/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IVAN DESIGN ENGINEERING &6983205/04/2023
LL ENGINEERING PC1618804/14/2022
Building Lifecycle
All (102)Filed (12)Permit Issued (8)Signed Off (7)Violation (60)Inspection (2)Special Inspection (13)
05/05/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, closed)
I
04/11/2024
Violation issued (HPD, closed)
A
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/13/2023
Signed off — Alteration
B00869544-I1
06/09/2023
Permit issued — Foundation
B00869544-I1-FO
05/04/2023
Filed — Alteration
B00869544-I1
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/24/2023
Violation issued (HPD, closed)
A
11/22/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00783172-I1
11/22/2022
Signed off — Alteration
B00273498-I1
11/22/2022
Signed off — Alteration
B00783162-I1
11/09/2022
Violation issued (HPD, closed)
I
08/04/2022
Permit issued — Supported Scaffold
B00783172-I1-SF
08/04/2022
Permit issued — Sidewalk Shed
B00783162-I1-SH
08/03/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00783172-I1
08/03/2022
Filed — Alteration
B00783162-I1
05/23/2022
Signed off — Alteration
B00274430-I1
04/14/2022
Filed — Alteration
B00274430-P4
04/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS LEE
03/11/2022
Signed off — Alteration
B00367952-I1
03/09/2022
Signed off — Alteration
FILING HEREWITH APPPLICAITON FOR MECHANICAL WORKTYPE IN CONJUCTION WITH ALT1 321592040.
B00367959-I1
03/07/2022
Special inspection requirement — HVAC and service water heating equipment
LOUIS LEE
03/07/2022
Special inspection requirement — HVAC insulation and sealing
LOUIS LEE
03/07/2022
Special inspection requirement — Maintenance information
LOUIS LEE
03/07/2022
Special inspection requirement — Heating Systems
LOUIS LEE
03/07/2022
Special inspection requirement — Mechanical Systems
LOUIS LEE
03/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS LEE
03/07/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS LEE
03/07/2022
Special inspection requirement — Final
LOUIS LEE
03/07/2022
Special inspection requirement — HVAC and service water heating system controls
LOUIS LEE
03/07/2022
Special inspection requirement — Shutoff dampers
LOUIS LEE
03/04/2022
Filed — Alteration
FILING HEREWITH APPPLICAITON FOR MECHANICAL WORKTYPE IN CONJUCTION WITH ALT1 321592040.
B00367959-P1
03/01/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
11/01/2021
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/27/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/20/2021
Permit issued — Sprinklers
B00367952-I1-EW-SP
10/18/2021
Permit issued — Plumbing
B00274430-I1-PL
09/24/2021
Filed — Alteration
B00274430-P3
09/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS LEE
05/25/2021
Filed — Alteration
B00274430-P2
05/24/2021
Permit issued — Structural
B00273498-I1-ST
05/21/2021
Permit issued — Mechanical Systems
B00367959-I1-MS
05/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS LEE
04/12/2021
Violation issued (HPD, closed)
A
03/25/2021
Filed — Alteration
B00274430-P1
10/13/2020
Filed — Alteration
B00367952-I1
10/13/2020
Filed — Alteration
FILING HEREWITH APPPLICAITON FOR MECHANICAL WORKTYPE IN CONJUCTION WITH ALT1 321592040.
B00367959-I1
10/07/2020
Permit issued — Plumbing
B00274430-I1-PL
07/01/2020
Filed — Alteration
B00273498-I1
03/11/2020
Filed — Alteration
B00274430-I1
11/14/2016
Violation issued (HPD, closed)
I
10/29/2008
Violation issued (HPD, closed)
A
09/20/2008
Violation issued (HPD, closed)
B
09/20/2008
Violation issued (HPD, closed)
B
09/20/2008
Violation issued (HPD, closed)
B
09/20/2008
Violation issued (HPD, closed)
B
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offJ S REMODELING NY INC06/09/2023
DOB NOWSupported ScaffoldSigned-offLAKHI GENERAL CONTRACTOR08/04/2022
DOB NOWSidewalk ShedSigned-offLAKHI GENERAL CONTRACTOR08/04/2022
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC10/20/2021
DOB NOWPlumbingSigned-offPLBG P & H INC10/18/2021
DOB NOWStructuralSigned-offJ S REMODELING NY INC05/24/2021
DOB NOWMechanical SystemsSigned-offJ S REMODELING NY INC05/21/2021
DOB NOWPlumbingSigned-offPLBG P & H INC10/07/2020
BIS—ISSUEDJ S REMODELING NY INC09/21/2020
BISOTISSUEDJ S REMODELING NY INC09/09/2020
BISOTISSUEDATRIUM INTERIORS INC11/07/2012
2 projects · most recent 09/12/2022
General Wiring
FiledStatusContractorScope
09/12/2022CompleteK.N.C ELECTRIC INC—
09/10/2020CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/01/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/27/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
04/12/2022Fire-Resistant Penetrations and JointsLOUIS LEEspecial
03/07/2022HVAC and service water heating equipment LOUIS LEEenergy_progress
03/07/2022HVAC insulation and sealing LOUIS LEEenergy_progress
03/07/2022Maintenance informationLOUIS LEEenergy_progress
03/07/2022Heating SystemsLOUIS LEEspecial
03/07/2022Mechanical SystemsLOUIS LEEspecial
03/07/2022Fire-Resistant Penetrations and JointsLOUIS LEEspecial
03/07/2022Energy Code Compliance InspectionsLOUIS LEEprogress
03/07/2022FinalLOUIS LEEprogress
03/07/2022HVAC and service water heating system controls LOUIS LEEenergy_progress
03/07/2022Shutoff dampersLOUIS LEEenergy_progress
09/15/2021Fire-Resistant Penetrations and JointsLOUIS LEEspecial
05/20/2021Fire-Resistant Penetrations and JointsLOUIS LEEspecial
▾Documents — 162 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch - Plumbing5
09/02/2026B00274430-P2Request digital key ↗
09/02/2026B00274430-I1Request digital key ↗
08/15/2026B00274430-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch3
08/28/2026B00783162-I1Request digital key ↗
08/28/2026B00783172-I1Request digital key ↗
08/27/2026B00869544-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00367959-I1Request digital key ↗
08/15/2026B00367959-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00367952-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00273498-I1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION12
11/17/2023321592040Open ↗
11/16/2023321592040Open ↗
09/19/2023321592040Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION5
09/21/2020321592040Open ↗
09/09/2020321976778Open ↗
09/09/2020321976778Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
05/11/2021321592040Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/13/2023321592040Open ↗
▸BISZONING DIAGRAM1
08/21/2020321592040Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
07/23/2020321592040Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
07/23/2020321592040Open ↗
▸BISVERIFY TAX LOT1
11/14/2023321592040Open ↗
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/28/2026B00783162-I1Open ↗
08/27/2026B00869544-I1Open ↗
08/13/2026B00783172-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/25/2026B00367959-I1Open ↗
08/25/2026B00367959-I1Open ↗
08/25/2026B00367959-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B00274430-P2Open ↗
08/29/2026B00274430-P4Open ↗
08/25/2026B00367959-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION4
12/29/2012320376295Open ↗
10/19/2012320376295Open ↗
10/19/2012320376295Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/19/2020340743271Open ↗
12/19/2019340708461Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/21/2020321976778Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/21/2020321976778Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/27/2020340743271Open ↗
▸Trade Schedules & Equipment2
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
10/19/2012320376295Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
10/19/2012320376295Open ↗
▸Safety & Tenant Protection14
▸DOB NOWTenant Protection Plan7
08/13/2026B00273498-I1Open ↗
08/13/2026B00274430-P1Open ↗
08/13/2026B00274430-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTenant Protection Plan and Notes4
07/23/2020321592040Open ↗
02/21/2020321976778Open ↗
07/19/2020340743271Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
06/22/2020321592040Open ↗
12/19/2019340708461Open ↗
▸BISSTREET TREE SIGNOFF1
11/17/2022321592040Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/27/2026B00869544-I1Open ↗
08/13/2026B00274430-I1Open ↗
08/13/2026B00273498-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
11/28/2022340743271Open ↗
07/23/2020321592040Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
07/19/2020340743271Open ↗
06/22/2020321592040Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
09/26/2012320376295Open ↗
▸DOB NOWACP5/20/21 or V51
08/13/2026B00367959-I1Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
11/17/2022321592040Open ↗
05/12/2021321976778Open ↗
09/15/2020321592040Open ↗
Showing 3 of 5 on file for this type
▸BISSOLAR TAX ABATEMENT APPLICATION (PTA4)4
01/22/2013320376295Open ↗
01/22/2013320376295Open ↗
12/29/2012320376295Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
01/22/2013320376295Open ↗
10/19/2012320376295Open ↗
10/19/2012320376295Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/21/2020321976778Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/17/2022321592040Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/12/2021321976778Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY7
11/17/2022321592040Open ↗
05/17/2021321976778Open ↗
09/15/2020321592040Open ↗
Showing 3 of 7 on file for this type
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/28/2022340743271Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/14/2020321592040Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
11/28/2022340743271Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/28/2022340743271Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/28/2022340743271Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
11/28/2022340743271Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00869544-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00869544-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸BISSCHEDULE A - OCCUPANCY / USE3
11/17/2023321592040Open ↗
11/16/2023321592040Open ↗
01/05/2023321592040Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST3
01/19/2013320376295Open ↗
12/29/2012320376295Open ↗
05/17/2021321976778Open ↗
▸BISFINAL1
11/28/2022340743271Open ↗
▸BISThird Party Electrical Signoff Compliance Report1
01/19/2013320376295Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
01/19/2013320376295Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT8
05/12/2021321976778Open ↗
08/14/2020321592040Open ↗
07/19/2020340743271Open ↗
Showing 3 of 8 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
05/13/2021321592040Open ↗
09/15/2020321592040Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
05/13/2021321592040Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/17/2022321592040Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION4
07/30/2020321592040Open ↗
07/23/2020321592040Open ↗
10/19/2012320376295Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/27/2020340743271Open ↗
12/19/2019340708461Open ↗
▸BISEFILING COVER SHEET2
06/15/2020321592040Open ↗
02/21/2020321976778Open ↗
▸BISBOROUGH INTAKE FORM1
05/13/2021321592040Open ↗
▸Other Documents6
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION4
07/30/2020321592040Open ↗
07/23/2020321592040Open ↗
04/08/2020340708461Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM1
06/22/2020321592040Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B00869544-I1Open ↗