← Back
BuildNYC
Elevator apt, semi-fireproof with stores
706 COURTLANDT AVENUE
BRONX · BIN 2129068
💬 Discuss this project
2015Year Built
5Stories
D7Building Class
R6Zoning
17,860 sfGross Floor Area
11Units
Rent Stabilized0 Active Violations
Elevator apt, semi-fireproof with stores · Owner of record: 706 Courtlandt Avenue · 5,000 sf lot · 3.57 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 51 filing
Floor 41 filing
Floor 31 filing
Floor 21 filing
Floor 11 filing
Cellar1 filing
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
706 Courtlandt Ave1403/22/2026
366 East 155TH203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/14/2026$4.8M—706 COURTLANDT AVENUE LLC → HS 706 CORPORATE AVENUE, INC.$269/sf building
08/15/2014$425K—Tribros Estates → 706 COURTLANDT AVENUE LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gino O. Longo, Architect805/18/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ponce ConstructionGeneral Contractor803/22/2026
A P Plumbing & HeatingPlumbing307/08/2026
Benchmark Design BuildersGeneral Contractor312/23/2019
CWC ContractingGeneral Contractor412/09/2015
K&M Fire Protection ServiceFire Protection111/16/2015
Rock Group NYGeneral Contractor112/21/2015
True North MechanicalPlumbing108/10/2015
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Gino O. Longo Architetct331112/10/2021
Building Lifecycle
09/25/2025
Elevator Category 1 inspection report filed
06/13/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
01/23/2025
Responding, to a 311 elevator complaint upon inspection. The device is found to be out of service, as per 1 rcny 11.02. This device provides…
ECB violation · closed
12/26/2024
Investigate vale leak in tank. Correct leak. Return overflow oil bucket in pit needs to be removed. Clean oil from pit floor.
ECB violation · closed
11/22/2024
Failure to maintain building in code-compliant manner: use of prohibited door and/or hardware per bc 1008.1 (2014 code); 27-371; bc 1008.1.9 (2014…
ECB violation · closed
65 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Ponce Construction—
DOB NOW—A P Plumbing & Heating—
DOB NOW—Ponce Construction—
BIS—Benchmark Design Builders—
BIS—A P Plumbing & Heating—
BIS—Benchmark Design Builders—
BIS—A P Plumbing & Heating—
BIS—Benchmark Design Builders—
BIS—Rock Group NY—
BIS—CWC Contracting—
BIS—New Era Mechanical Service—
BIS—True North Mechanical—
BIS—CWC Contracting—
BIS—CWC Contracting—
BIS—CWC Contracting—
Nothing on file for this building.
Nothing on file for this building.
228 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account