← Back
Two family frame
706 GRAVESEND NECK ROAD
BROOKLYN · BIN 3194062
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R4Zoning
2,000 sfGross Floor Area
2Units
2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family frame · 3,844 sf lot · 0.52 FAR built · Flood zone X500
Locations of Work
Structural
Roof1p · 1 filing · 11 docs
Cellar2p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAHMAN CONSULTING107/15/2025
MSM ENGINEERING SERVICES, PLLC203/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER303/21/2026
Building Lifecycle
All (53)Filed (3)Violation (2)Objection (35)Special Inspection (13)
08/06/2025
Objection resolved — Addressed
07/28/2025
Objection raised — Admin
07/17/2025
Objection resolved — Addressed
07/15/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION & HORIZONTAL ENLARGEMENT AT CELLAR, FIRST, AND SECONDFLOOR TO THE REFERENCED (2) TWO STORY WITH CELLAR, (2) TWO DWELLING UNITS.NO CHANGE IN USE OR OCCUPANCY.
B01178771-S1
07/11/2025
Objection resolved — Addressed
06/26/2025
Objection resolved — Resolved
06/05/2025
Violation issued (ECB, open)
Construction
05/28/2025
Objection resolved — Addressed
05/28/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
04/30/2025
Objection raised — Cost
04/30/2025
Objection resolved — Addressed
04/21/2025
Objection resolved — Addressed
04/21/2025
Objection resolved — Addressed
04/21/2025
Objection resolved — Addressed
04/21/2025
Objection resolved — Addressed
04/07/2025
Objection raised — Other
04/07/2025
Objection raised — Plumbing
04/07/2025
Objection raised — Structural
04/07/2025
Objection raised — Admin
04/07/2025
Objection raised — Fire_Protection
04/07/2025
Objection raised — Other
04/07/2025
Objection raised — Zoning
04/07/2025
Objection raised — Admin
04/07/2025
Objection raised — Zoning
04/07/2025
Objection raised — Scope
04/07/2025
Objection raised — Other
03/24/2025
Objection resolved — Addressed
03/24/2025
Objection resolved — Addressed
03/21/2025
Objection raised — Admin
03/21/2025
Objection raised — Zoning
03/10/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION & HORIZONTAL ENLARGEMENT AT CELLAR, FIRST, AND SECONDFLOOR TO THE REFERENCED (2) TWO STORY WITH CELLAR, (2) TWO DWELLING UNITS.NO CHANGE IN USE OR OCCUPANCY.
B01178771-I1
03/06/2025
Special inspection requirement — Metering
03/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/06/2025
Special inspection requirement — Energy Code Compliance Inspections
03/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
03/06/2025
Special inspection requirement — Concrete - Cast-In-Place
03/06/2025
Special inspection requirement — Air barrier - visual inspection
03/06/2025
Special inspection requirement — Fenestration areas
03/06/2025
Special inspection requirement — Fenestration air leakage
03/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
03/06/2025
Special inspection requirement — Insulation placement and R values
03/06/2025
Special inspection requirement — Interior lighting power
02/10/2025
Special inspection requirement — Final
01/24/2025
Violation issued (ECB, open)
Construction
04/11/2024
Objection raised — Zoning
04/11/2024
Objection raised — Zoning
04/11/2024
Objection raised — Inspections
04/11/2024
Objection raised — Inspections
04/11/2024
Objection raised — Zoning
04/03/2024
Filed — Alteration
B01029393-I1
Nothing on file for this building.
1 project · most recent 07/15/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/15/2025——Gas, Water/Sanitary
1 project · most recent 07/15/2025
Steel Wood
FiledStatusContractorScope
07/15/2025——Steel, Wood
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
03/06/2025Metering—energy_progress
03/06/2025Fire-Resistant Penetrations and Joints—special
03/06/2025Structural Stability – Alterations of existing buildings—special
03/06/2025Energy Code Compliance Inspections—progress
03/06/2025Fire-Resistance Rated Construction—progress
03/06/2025Concrete - Cast-In-Place—special
03/06/2025Air barrier - visual inspection—energy_progress
03/06/2025Fenestration areas—energy_progress
03/06/2025Fenestration air leakage—energy_progress
03/06/2025Fenestration and door U-factor and product ratings—energy_progress
03/06/2025Insulation placement and R values—energy_progress
03/06/2025Interior lighting power—energy_progress
02/10/2025Final—progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026B01029393-I1Request digital key ↗
08/22/2026B01178771-S1Request digital key ↗
08/14/2026B01178771-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01178771-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01178771-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/22/2026B01178771-S1Open ↗
08/22/2026B01178771-I1Open ↗
08/13/2026B01029393-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026B01178771-S1Open ↗
08/14/2026B01178771-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026B01178771-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01178771-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01178771-I1Open ↗