← Back
Primarily 3 family with 1 store or office
706 MANHATTAN AVENUE
BROOKLYN · BIN 3065650
💬 Discuss this project
1930Year Built
4Stories
S3Building Class
C4-3AZoning
4,700 sfGross Floor Area
4Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: 706 MANHATTAN AVENUE LLC · 1,567 sf lot · 3 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Floor 412p · 1 filing · 20 docs
Floor 313p · 1 filing · 20 docs
Floor 216p · 2 filings · 20 docs
Floor 1
1 job · most recent 04/23/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/23/2026Permit IssuedDEVMED CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3C30NAHZ3 30,000 BTU · Condensing Unit ×3
Ventilation
N/A n/a 100 CFM · Kitchen Exhaust ×6
1 job · most recent 04/23/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/23/2026Permit IssuedA.M.N. CORPORATIONGas, Water/Sanitary
3 jobs · most recent 04/16/2026
General Wiring
FiledStatusContractorScope
04/16/2026CompleteRICHARD NEU—
12/01/2025CompleteDENMAR ELECTRIC CORPGeneral Wiring
03/22/2021CompleteENNELL GRP ELECTRIC CORPGeneral Wiring
1 job · most recent 04/16/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
04/16/2026Signed-offPHOENIX SUTTON STR INCScaffold, Sidewalk Shed
Building Lifecycle
All (73)Filed (9)Permit Issued (7)Signed Off (3)Violation (25)Inspection (6)Objection (6)Special Inspection (17)
06/19/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B01382787-I1
05/15/2026
Permit issued — General Construction
B01214397-S3-GC
04/23/2026
Filed — Alteration
MECHANICAL WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01214397-S3
04/23/2026
Filed — Alteration
MECHANICAL WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01214397-P3
04/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
CARL HAMANN
04/20/2026
Special inspection requirement — Lighting in dwelling units
CARL HAMANN
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
04/20/2026
Special inspection requirement — Insulation placement and R values
CARL HAMANN
04/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B01382787-I1
04/16/2026
Permit issued — Supported Scaffold
B01382787-I1-SF
04/16/2026
Permit issued — Supported Scaffold
B01382787-I1-SH
03/31/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/18/2026
Signed off — Alteration
MECHANICAL WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01214397-S1
03/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/08/2025
Permit issued — Mechanical Systems
B01214397-S1-MS
12/01/2025
Filed — Alteration
MECHANICAL WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01214397-S1
12/01/2025
Signed off — Alteration
WORK FILED TO SHOW INTERIOR DEMOLITION OF NON BEARING PARTITIONS AND FRAMING OF NEW PARTITIONS ON 2ND, 3RD AND 4TH FLOORS AS PER PLANS FILED HEREWITH, NO STRUCTURAL WORK PROPOSED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01206642-I1
11/28/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/20/2025
Violation issued (HPD, closed)
I
11/14/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
11/01/2025
Filed — Alteration
MECHANICAL WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01214397-P1
10/24/2025
Special inspection requirement — Maintenance information
CARL HAMANN
10/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
CARL HAMANN
10/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
CARL HAMANN
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CARL HAMANN
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
CARL HAMANN
10/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CARL HAMANN
06/26/2025
Permit issued — Plumbing
B01214397-S2-PL
06/24/2025
Permit issued — General Construction
B01214397-I1-GC
06/16/2025
Permit issued — General Construction
B01206642-I1-GC
06/13/2025
Special inspection requirement — Final
CARL HAMANN
06/13/2025
Special inspection requirement — Fire-Resistance Rated Construction
CARL HAMANN
06/12/2025
Filed — Alteration
WORK FILED TO SHOW INTERIOR DEMOLITION OF NON BEARING PARTITIONS AND FRAMING OF NEW PARTITIONS ON 2ND, 3RD AND 4TH FLOORS AS PER PLANS FILED HEREWITH, NO STRUCTURAL WORK PROPOSED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01206642-P1
06/12/2025
Objection resolved — Addressed
06/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
06/12/2025
Special inspection requirement — Final
CARL HAMANN
06/10/2025
Violation issued (HPD, closed)
A
06/09/2025
Objection raised — Energy
05/27/2025
Objection resolved — Addressed
05/07/2025
Objection resolved — Addressed
05/06/2025
Objection raised — Structural
05/06/2025
Objection raised — Admin
04/28/2025
Filed — Alteration
MECHANICAL WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01214397-I1
04/28/2025
Filed — Alteration
MECHANICAL WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01214397-S2
04/23/2025
Special inspection requirement — Final
CARL HAMANN
04/23/2025
Special inspection requirement — Mechanical Systems
CARL HAMANN
04/10/2025
Filed — Alteration
WORK FILED TO SHOW INTERIOR DEMOLITION OF NON BEARING PARTITIONS AND FRAMING OF NEW PARTITIONS ON 2ND, 3RD AND 4TH FLOORS AS PER PLANS FILED HEREWITH, NO STRUCTURAL WORK PROPOSED. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01206642-I1
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/10/2022
Violation issued (HPD, closed)
I
02/25/2022
Violation issued (HPD, closed)
I
02/25/2022
Violation issued (HPD, closed)
A
04/12/2021
Violation issued (HPD, closed)
I
04/12/2021
Violation issued (HPD, closed)
A
01/17/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2019
Violation issued (HPD, closed)
I
Latest 60 of 73 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
706 MANHATTAN AVE, LLC2009/13/2026
607 MANHTTAN AVE304/09/2026
KS MANHATTAN AVENUE REALTY503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/26/2025$3.2M—— → —$691/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAMANN ENGINEERING, PLLC804/23/2026
ALWAYS FAST SERVICES CORP104/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.K. REMODELING INCGeneral Contractor206/28/2026
PHOENIX SUTTON STR INCGeneral Contractor207/08/2026
DEVMED CORPGeneral Contractor106/28/2026
DENMAR ELECTRIC CORPElectrical103/22/2026
A.M.N. CORPORATIONPlumbing106/28/2026
TOMCHRIS CONTRACTING CORPGeneral Contractor104/09/2026
ENNELL GRP ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HAMANN ENGINEERING, PLLC4949404/23/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDEVMED CORP05/15/2026
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC04/16/2026
DOB NOWSupported ScaffoldSigned-offPHOENIX SUTTON STR INC04/16/2026
DOB NOWMechanical SystemsSigned-offTOMCHRIS CONTRACTING CORP12/08/2025
DOB NOWPlumbingPermit IssuedA.M.N. CORPORATION06/26/2025
DOB NOWGeneral ConstructionSigned-offJ.K. REMODELING INC06/24/2025
DOB NOWGeneral ConstructionSigned-offJ.K. REMODELING INC06/16/2025
BIS—ISSUEDJS HOMES REALTY SERVICES03/01/2021
BISBLISSUEDCOCHRANE PLBG & HTG07/29/2015
BISPLISSUEDCOCHRANE PLBG & HTG07/29/2015
BISBLISSUEDCOCHRANE PLBG & HTG07/25/2014
BISPLISSUEDCOCHRANE PLBG & HTG07/24/2014
BISPLISSUEDCOCHRANE PLBG & HTG06/21/2013
BISMHISSUEDS & A BUILDING DEVELOP06/14/2013
BISOTISSUEDS & A BUILDING DEVELOP06/11/2013
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/31/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/28/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
04/20/2026Fire-Resistance Rated ConstructionCARL HAMANNprogress
04/20/2026Lighting in dwelling unitsCARL HAMANNenergy_progress
04/20/2026Fire-Resistant Penetrations and JointsCARL HAMANNspecial
04/20/2026Insulation placement and R valuesCARL HAMANNenergy_progress
11/06/2025HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
10/24/2025Maintenance informationCARL HAMANNenergy_progress
10/24/2025HVAC-R and service water heating equipmentCARL HAMANNenergy_progress
10/24/2025HVAC-R and service water heating system controlsCARL HAMANNenergy_progress
10/24/2025Fire-Resistant Penetrations and JointsCARL HAMANNspecial
10/24/2025Energy Code Compliance InspectionsCARL HAMANNprogress
10/24/2025HVAC-R and service water piping design and insulationCARL HAMANNenergy_progress
06/13/2025FinalCARL HAMANNprogress
06/13/2025Fire-Resistance Rated ConstructionCARL HAMANNprogress
06/12/2025Fire-Resistance Rated Construction—progress
06/12/2025FinalCARL HAMANNprogress
04/23/2025FinalCARL HAMANNprogress
04/23/2025Mechanical SystemsCARL HAMANNspecial
▾Documents — 121 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/21/2026B01206642-I1Request digital key ↗
08/21/2026B01206642-P1Request digital key ↗
08/17/2026B01382787-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION8
03/01/2021321598160Open ↗
09/04/2015321213995Open ↗
07/31/2015321213995Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
07/25/2014321213995Open ↗
02/05/2013320691612Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
03/12/2021321598160Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/21/2026B01206642-P1Open ↗
08/21/2026B01206642-I1Open ↗
08/17/2026B01382787-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B01206642-P1Open ↗
09/13/2026B01214397-S1Open ↗
09/13/2026B01214397-S1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION7
01/15/2014320691612Open ↗
01/15/2014320691612Open ↗
01/04/2014320691612Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/13/2026B01214397-S1Open ↗
08/28/2026B01214397-P3Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/22/2014321213995Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/22/2014321213995Open ↗
▸Trade Schedules & Equipment9
▸BISSELF-CERT PLUMBING NOTICE3
09/11/2014321213995Open ↗
10/02/2013320691612Open ↗
07/05/2013320691612Open ↗
▸BISBOILER APPROVAL : FORM1
01/19/2022321213995Open ↗
▸BISSCHEDULE B - PLUMBING1
12/12/2012320691612Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/25/2014321213995Open ↗
▸BIS* BOILER (BL) SIGNOFF1
01/19/2022321213995Open ↗
▸BISPLUMBING (PL) SIGNOFF1
01/19/2022321213995Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/25/2014321213995Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
02/08/2022321598160Open ↗
07/25/2014321213995Open ↗
▸BISTenant Protection Plan and Notes1
12/07/2020321598160Open ↗
▸BISDS1-Demolition Submittal Certification Form1
03/01/2013320691612Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/21/2026B01206642-P1Open ↗
08/21/2026B01206642-I1Open ↗
08/17/2026B01214397-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/25/2014321213995Open ↗
12/12/2012320691612Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/12/2022321213995Open ↗
07/19/2021321598160Open ↗
03/01/2021321598160Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
07/22/2014321213995Open ↗
09/10/2013320691612Open ↗
06/14/2013320691612Open ↗
Showing 3 of 4 on file for this type
▸BISEN2 - As Built Energy Analysis3
01/15/2014320691612Open ↗
01/04/2014320691612Open ↗
01/12/2022321213995Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
01/19/2022321213995Open ↗
07/19/2021321598160Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/19/2022321213995Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/12/2022321213995Open ↗
07/19/2021321598160Open ↗
03/01/2021321598160Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
01/04/2014320691612Open ↗
▸BISDOB FINAL INSPECTION REQUIRED1
01/19/2022321213995Open ↗
▸Approvals, Objections & Sign-offs13
▸BISLETTERS - SUPPORTING DOCUMENTATION9
01/15/2014320691612Open ↗
01/15/2014320691612Open ↗
01/04/2014320691612Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
07/25/2014321213995Open ↗
12/12/2012320691612Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST2
01/04/2014320691612Open ↗
01/20/2022321213995Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT5
12/07/2020321598160Open ↗
07/22/2014321213995Open ↗
01/15/2014320691612Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/19/2022321213995Open ↗
07/19/2021321598160Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/14/2013320691612Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
12/06/2021321598160Open ↗
12/07/2020321598160Open ↗
08/23/2018320691612Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
07/25/2014321213995Open ↗
12/12/2012320691612Open ↗
▸Other Documents3
▸BISPLOT DIAGRAM1
12/07/2020321598160Open ↗
▸BISPERMANENT CERTIFICATE1
01/19/2022321213995Open ↗
▸BISMICROFILM/SCAN: INITIAL1
01/19/2022321213995Open ↗