← Back
Two family frame
707 HARRIS AVENUE
💬 Discuss this project
1970Year Built
2Stories
B2Building Class
R3-1Zoning
2,208 sfGross Floor Area
2Units
Two family frame · 4,089 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof7p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC111/23/2025
PARKER AND WEST ENGINEERING, PLLC209/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CATIZONE ELECTRICAL INCElectrical103/22/2026
LONG ISLAND POWER SOLUTIOGeneral Contractor104/09/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854111/23/2025
PARKER AND WEST ENGINEERI5272209/20/2024
Building Lifecycle
All (21)Filed (3)Permit Issued (2)Signed Off (1)Special Inspection (15)
05/06/2026
Signed off — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
S01323548-I1
12/01/2025
Permit issued — Solar
S01323548-I1-SL
11/23/2025
Filed — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
S01323548-I1
11/23/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
11/23/2025
Special inspection requirement — Final
TOM PETERSEN
11/23/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
11/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
11/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
09/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
09/23/2024
Special inspection requirement — Final
Walid Abdulla
09/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
09/23/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
09/20/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01089297-P1
09/19/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
09/19/2024
Special inspection requirement — Final
Walid Abdulla
09/19/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
09/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
09/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/16/2024
Permit issued — Solar
S01089297-I1-SL
08/02/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01089297-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offLONG ISLAND POWER SOLUTIO12/01/2025
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC08/16/2024
2 projects · most recent 11/19/2025
FiledStatusContractorScope
11/19/2025CompleteCATIZONE ELECTRICAL INC—
08/02/2024Permit IssuedSUNRUN SOLAR ELECTL CORP—
2 projects · most recent 11/23/2025
FiledStatusContractorScope
11/23/2025Signed-offLONG ISLAND POWER SOLUTIO50 panels, 22 kw, 1,562 roof_area_sqft
09/20/2024Permit IssuedSUNRUN INSTALLATION SVC32 panels, 12.8 kw, 338 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
11/23/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
11/23/2025FinalTOM PETERSENprogress
11/23/2025Energy Code Compliance InspectionsTOM PETERSENprogress
11/23/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
11/23/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
09/23/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/23/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
09/23/2024FinalWalid Abdullaprogress
09/23/2024Energy Code Compliance InspectionsWalid Abdullaprogress
09/23/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
09/19/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
09/19/2024FinalWalid Abdullaprogress
09/19/2024Energy Code Compliance InspectionsWalid Abdullaprogress
09/19/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
09/19/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026S01089297-P1Request digital key ↗
08/20/2026S01089297-I1Request digital key ↗
08/17/2026S01323548-I1Request digital key ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature9
08/27/2026S01323548-I1Open ↗
08/27/2026S01323548-I1Open ↗
08/27/2026S01323548-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026S01323548-I1Open ↗
08/27/2026S01323548-I1Open ↗
08/26/2026S01089297-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026S01089297-I1Open ↗
08/13/2026S01323548-I1Open ↗
08/13/2026S01089297-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026S01089297-I1Open ↗
08/13/2026S01089297-P1Open ↗
08/13/2026S01323548-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026S01323548-I1Open ↗