← Back
Office with commercial, 7-19 stories
708 BROADWAY
MANHATTAN · BIN 1080090
💬 Discuss this project
1896Year Built
10Stories
O6Building Class
M1-5/R9AZoning
127,143 sfGross Floor Area
18Units
LL97 Covered8 Open Violations 3 unresolved · 5 paperwork only ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: NEW YORK UNIVERSITY · 16,740 sf lot · 7.6 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 2 filings · 7 docs
Floor 101 filing · 2 docs
Floor 91 filing · 2 docs
Floor 8
Floor 7
Floor 6
Floor 51p · 1 filing · 9 docs
Floor 4
Floor 3
Floor 25p · 4 filings · 20 docs
Floor 1Under Construction6p · 3 filings · 20 docs
Cellar2p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK UNIVERSITY6009/13/2026
708 BROADWAY DEC LLC203/22/2026
708 BROADWAY DEL2403/22/2026
OWNER OF 402 LAFAYETTE ST203/22/2026
OWNER OF 404 LAFAYETTE ST103/22/2026
WILSON BROADWAY REALTY703/22/2026
OWNER OF PREMISES103/22/2026
WILSON RELATY CO.103/22/2026
408 LAFAYETTE ST.RLTY103/22/2026
708 BROADDELL LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/21/2014$157.5M—— → —$1,239/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
YAO W GUO ARCHITECT, PC1003/21/2026
PATUXENT ENGINEERING403/21/2026
SUPERSTRUCTURES ENG + ARCH103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNITED HOISTING & SCAFF CGeneral Contractor707/08/2026
PJP INSTALLERS INCGeneral Contractor607/08/2026
RICHARD MILLWATERElectrical603/21/2026
PRP MECHANICAL CONTRACTOR INC.General Contractor507/08/2026
ADVANCED SCAFFOLD SER.LLCGeneral Contractor303/21/2026
SPK/LEWIS CONSTRUCTION LLGeneral Contractor307/08/2026
DNA CONTRACTING LLCGeneral Contractor204/09/2026
PENGUIN MAINTENANCE & SERGeneral Contractor107/30/2026
FULL CAPACITY FIRE CORPFire Protection107/08/2026
JUMPER ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MG ENGINEERING D.P.C.8546107/23/2026
RICHMOND TESTING LAB263104/22/2024
SUPERSTRUCTURES ENGINEERI374104/22/2024
LEO Y LEE ASSOCIATES2481102/09/2024
KLINE ENGINEERING, PC1007503/08/2021
Building Lifecycle
All (146)Filed (14)Permit Issued (20)Signed Off (10)Facade (FISP) (18)Violation (60)Inspection (2)Special Inspection (22)
08/14/2026
Cycle 10 facade report submitted
08/12/2026
Cycle 10 facade report signed — SWARMP
08/06/2026
Cycle 10 facade inspection completed
07/29/2026
Permit issued — Mechanical Systems
M01425211-I1-MS
07/23/2026
Filed — Alteration
INSTALLATION OF (1) 3 TON AC UNIT WITH CONDENSER ON EXTERIOR WALL
M01425211-I1
07/01/2026
Special inspection requirement — Maintenance information
Peter Gerazounis
07/01/2026
Special inspection requirement — Mechanical Systems
Peter Gerazounis
07/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
Peter Gerazounis
07/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
Peter Gerazounis
07/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Peter Gerazounis
07/01/2026
Special inspection requirement — Final
Peter Gerazounis
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Peter Gerazounis
03/11/2026
Signed off — Alteration
NYU Exterior Facade repairs as per the plans filed including: Removal and replacement of cracked brick masonry units. Brick masonry re-pointing. Stone spall and crack repairs, patching and coating. Cornice repairs & install new GFRC cornice.
M01026487-I1
06/17/2025
Signed off — Alteration
M01148773-I1
06/17/2025
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK
M01025184-S1
06/17/2025
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK
M01025184-I1
04/03/2025
Permit issued — Sidewalk Shed
M01025184-I1-SH
04/02/2025
Permit issued — Protection and Mechanical Methods
M01025184-S1-PMM
02/27/2025
Permit issued — General Construction
M01026487-I1-GC
12/10/2024
Filed — Alteration
INSTALLATION OF SIDEWALK SHED FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK
M01025184-P2
12/02/2024
Filed — Alteration
M01148773-I1
12/02/2024
Permit issued — Supported Scaffold
M01148773-I1-SF
05/16/2024
Permit issued — General Construction
M01026487-I1-GC
04/22/2024
Filed — Alteration
NYU Exterior Facade repairs as per the plans filed including: Removal and replacement of cracked brick masonry units. Brick masonry re-pointing. Stone spall and crack repairs, patching and coating. Cornice repairs & install new GFRC cornice.
M01026487-I1
04/16/2024
Permit issued — Sidewalk Shed
M01025184-I1-SH
04/15/2024
Permit issued — Protection and Mechanical Methods
M01025184-S1-PMM
04/12/2024
Filed — Alteration
INSTALLATION OF SIDEWALK SHED FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK
M01025184-S1
04/12/2024
Filed — Alteration
INSTALLATION OF SIDEWALK SHED FOR PUBLIC PROTECTION DURING CONSTRUCTION WORK
M01025184-I1
02/22/2024
Permit issued — Suspended Scaffold
M01001065-I1-SC
02/09/2024
Filed — Alteration
M01001065-I1
02/05/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
02/05/2024
Special inspection requirement — Post-installed Anchors
Leo Lee
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/28/2023
Violation issued (ECB, open)
Construction
02/17/2023
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AND CONSTRUCTION FENCE IN ACCORDANCE WITH NYCC 2014 CHAPTER 33. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M00224337-I1
03/18/2022
Violation issued (ECB, open)
Construction
02/12/2022
Cycle 9 facade report signed — SWARMP
02/09/2022
Cycle 9 facade inspection completed
02/01/2022
Signed off — Alteration
M00451088-I1
01/20/2022
Signed off — Alteration
FILING FOR INTERIOR PARTITION MODIFICATION, DOORS, AND CEILING ON CELLAR, FIRST AND SECOND LEVEL AS PER PLAN BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00451086-I1
10/09/2021
Violation issued (ECB, open)
Construction
09/28/2021
Signed off — Alteration
M00469246-I1
09/14/2021
Cycle 9 facade report submitted
09/10/2021
Permit issued — Mechanical Systems
M00469246-I1-MS
09/09/2021
Signed off — Alteration
FILING FOR INTERIOR PARTITION MODIFICATION, DOORS, AND CEILING ON SECOND LEVEL AS PER PLAN BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
M00469179-I1
09/09/2021
Signed off — Alteration
MODIFICATIN OF EXISTIGN SPRINKKLER SYSTEM ON 2ND FLOOR AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00469263-I1
08/13/2021
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/03/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/30/2021
Permit issued — Sprinklers
M00469263-I1-EW-SP
07/02/2021
Permit issued — General Construction
M00469179-I1-GC
06/10/2021
Permit issued — Mechanical Systems
M00451088-I1-MS
06/10/2021
Permit issued — General Construction
M00451086-I1-GC
05/11/2021
Permit issued — Mechanical Systems
M00451088-I1-MS
05/08/2021
Permit issued — General Construction
M00451086-I1-GC
03/08/2021
Filed — Alteration
M00469246-I1
03/03/2021
Filed — Alteration
FILING FOR INTERIOR PARTITION MODIFICATION, DOORS, AND CEILING ON SECOND LEVEL AS PER PLAN BEING FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
M00469179-I1
02/22/2021
Filed — Alteration
MODIFICATIN OF EXISTIGN SPRINKKLER SYSTEM ON 2ND FLOOR AS SHOWN ON PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00469263-I1
02/11/2021
Special inspection requirement — Interior lighting power
ARNOLD KLINE
Latest 60 of 146 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPENGUIN MAINTENANCE & SER07/29/2026
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC04/03/2025
DOB NOWProtection and Mechanical MethodsSigned-offPJP INSTALLERS INC04/02/2025
DOB NOWGeneral ConstructionSigned-offPAUL CHARLTON02/27/2025
DOB NOWSupported ScaffoldSigned-offPJP INSTALLERS INC12/02/2024
DOB NOWGeneral ConstructionSigned-offPAUL CHARLTON05/16/2024
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC04/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offPJP INSTALLERS INC04/15/2024
DOB NOWSuspended ScaffoldPermit IssuedDNA CONTRACTING LLC02/22/2024
DOB NOWMechanical SystemsSigned-offSPK/LEWIS CONSTRUCTION LL09/10/2021
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP07/30/2021
DOB NOWGeneral ConstructionSigned-offSPK/LEWIS CONSTRUCTION LL07/02/2021
DOB NOWMechanical SystemsSigned-offPRP MECHANICAL CONTRACTOR06/10/2021
DOB NOWGeneral ConstructionSigned-offPRP MECHANICAL CONTRACTOR06/10/2021
DOB NOWMechanical SystemsSigned-offPRP MECHANICAL CONTRACTOR05/11/2021
DOB NOWGeneral ConstructionSigned-offPRP MECHANICAL CONTRACTOR05/08/2021
DOB NOWSupported ScaffoldPermit IssuedADVANCED SCAFFOLD SER.LLC11/18/2020
DOB NOWConstruction FenceSigned-offUNITED HOISTING & SCAFF C12/23/2019
DOB NOWConstruction FenceSigned-offUNITED HOISTING & SCAFF C09/13/2019
DOB NOWConstruction FenceSigned-offUNITED HOISTING & SCAFF C09/13/2019
BISEQISSUEDUNITED HOISTING & SCAFF C06/10/2020
BISEQISSUEDUNITED HOISTING & SCAFF C05/23/2019
BISEQISSUEDUNITED HOISTING & SCAFF C06/05/2018
BISEQISSUEDPALACE HOISTING & SCAFFOLDING09/28/2017
BISSPISSUEDABSOLUTE SPECIAL INSPTN06/21/2017
BISOTISSUEDSKYLINE RESTORATION INC02/07/2017
BISOTISSUEDSKYLINE RESTORATION INC02/07/2017
BISEQISSUEDPALACE HOISTING & SCAFFOLDING09/21/2016
BISOTISSUEDJVN RESTORATION ENVIRONMENTAL08/29/2016
BISOTISSUEDSKYLINE RESTORATION INC02/01/2016
BISOTISSUEDSKYLINE RESTORATION INC02/01/2016
BISOTISSUEDSKYLINE RESTORATION INC12/29/2015
BISPLISSUEDPAR PLUMBING CO., INC12/23/2015
BISOTISSUEDSKYLINE RESTORATION INC12/21/2015
BISSPISSUEDSKH MECHANICAL CORP12/15/2015
BISPLISSUEDEAST COAST MECHANICAL LLC12/10/2015
BISEQISSUEDPALACE HOISTING & SCAFFOLDING10/14/2015
BISOTISSUEDBERN COMPANIES INC09/28/2015
BISMHISSUEDBERN COMPANIES INC09/28/2015
BISPLISSUEDM&T PLBG AND HTG CO., INC09/10/2015
+ 30 more permits on file
1 project · most recent 07/23/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/23/2026Permit IssuedPENGUIN MAINTENANCE & SERAir Conditioning Systems
Cooling
Mitsubishi Electric PUY-AK36NL 33,400 BTU · Split System ×1
17 projects · most recent 06/24/2024
General Wiring
FiledStatusContractorScope
06/24/2024CompleteRIGID ELECTRIC, INC.General Wiring
04/25/2024CompleteRIGID ELECTRIC, INC.General Wiring
04/25/2024CompleteRIGID ELECTRIC, INC.General Wiring
04/25/2024CompleteRIGID ELECTRIC, INC.General Wiring
04/25/2024CompleteRIGID ELECTRIC, INC.General Wiring
04/25/2024CompleteRIGID ELECTRIC, INC.General Wiring
04/16/2024CompleteRIGID ELECTRIC, INC.—
04/16/2024CompleteRIGID ELECTRIC, INC.General Wiring
04/16/2024CompleteRIGID ELECTRIC, INC.—
04/15/2024CompleteTOP SHELF ELECTRIC CORP—
06/05/2023CompleteZWICKER ELEC. CO., INC.—
06/05/2023CompleteZWICKER ELEC. CO., INC.2 meters, 2 new_meters
06/05/2023CompleteZWICKER ELEC. CO., INC.General Wiring
04/06/2021CompleteJUMPER ELECTRIC CORPGeneral Wiring
06/13/2018CompleteLOWY & DONNATH INC.—
1 project · most recent 11/18/2020
Scaffold
FiledStatusContractorScope
11/18/2020Permit IssuedADVANCED SCAFFOLD SER.LLCScaffold
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/13/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/03/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
07/01/2026Maintenance informationPeter Gerazounisenergy_progress
07/01/2026Mechanical SystemsPeter Gerazounisspecial
07/01/2026HVAC-R and service water heating system controlsPeter Gerazounisenergy_progress
07/01/2026HVAC-R and service water heating equipmentPeter Gerazounisenergy_progress
07/01/2026HVAC-R and service water piping design and insulationPeter Gerazounisenergy_progress
07/01/2026FinalPeter Gerazounisprogress
07/01/2026Energy Code Compliance InspectionsPeter Gerazounisprogress
02/05/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
02/05/2024Post-installed AnchorsLeo Leespecial
02/11/2021Interior lighting powerARNOLD KLINEenergy_progress
02/11/2021Sprinkler SystemsARNOLD KLINEspecial
02/11/2021Fire-Resistant Penetrations and JointsARNOLD KLINEspecial
02/11/2021FinalARNOLD KLINEprogress
02/11/2021Energy Code Compliance InspectionsARNOLD KLINEprogress
02/11/2021Lighting controlsARNOLD KLINEenergy_progress
01/10/2021FinalARNOLD KLINEprogress
01/10/2021Fire-Resistant Penetrations and JointsARNOLD KLINEspecial
01/10/2021Concrete - Cast-In-PlaceARNOLD KLINEspecial
01/10/2021Lighting controlsARNOLD KLINEenergy_progress
01/10/2021Interior lighting powerARNOLD KLINEenergy_progress
01/10/2021Fire-Resistance Rated ConstructionARNOLD KLINEprogress
01/10/2021Energy Code Compliance InspectionsARNOLD KLINEprogress
▾Documents — 418 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch7
09/04/2026M00469179-I1Request digital key ↗
08/28/2026M01001065-I1Request digital key ↗
08/27/2026M01025184-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00451086-I1Request digital key ↗
09/04/2026M00469179-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/04/2026M00451088-I1Request digital key ↗
09/04/2026M00469246-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00469263-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00224337-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00423193-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00224337-I1Request digital key ↗
▸Applications & Permits80
▸BISPLAN / WORK APPROVAL APPLICATION40
10/02/2023104556277Open ↗
07/21/2023102584071Open ↗
06/21/2023102240629Open ↗
Showing 3 of 40 on file for this type
▸BISWORK PERMIT APPLICATION30
06/10/2020140771528Open ↗
05/22/2020140771528Open ↗
07/15/2019140860012Open ↗
Showing 3 of 30 on file for this type
▸BISPLACE OF ASSEMBLY5
02/24/2016122611227Open ↗
02/24/2016122611227Open ↗
02/24/2016122611227Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLPC Approval/Permit5
09/04/2026M00451086-I1Open ↗
08/13/2026M01026487-I1Open ↗
08/13/2026M00469246-I1Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications89
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION31
11/08/2019140383608Open ↗
11/08/2019140383626Open ↗
02/11/2019122554850Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
07/15/2019140860012Open ↗
06/01/2018140771528Open ↗
05/15/2017123094043Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/05/2026M00224337-I1Open ↗
09/04/2026M00451086-I1Open ↗
09/04/2026M00451088-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/28/2026M00469179-I1Open ↗
08/28/2026M00469179-I1Open ↗
08/25/2026M01425211-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
05/15/2017123094043Open ↗
01/09/2016122611218Open ↗
01/08/2016122611227Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/18/2026M01001065-I1Open ↗
09/18/2026M01001065-I1Open ↗
08/28/2026M00469179-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
07/15/2019140860012Open ↗
06/01/2018140771528Open ↗
07/26/2016140520719Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
07/15/2019140860012Open ↗
06/01/2018140771528Open ↗
07/26/2016140520719Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
05/15/2017123094043Open ↗
02/03/2016122614723Open ↗
02/02/2016122614723Open ↗
Showing 3 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
09/11/2017122356137Open ↗
05/30/2017122537549Open ↗
04/28/2017122537549Open ↗
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER SYSTEMS1
02/24/2023123075867Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/04/2026M00451086-I1Open ↗
09/04/2026M00451088-I1Open ↗
09/04/2026M00469246-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)5
11/08/2019140383608Open ↗
11/08/2019140383626Open ↗
07/26/2016140520719Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
05/25/2017123094043Open ↗
Showing 1 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)1
01/06/2016122614723Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
07/26/2016140520719Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
11/08/2019140383608Open ↗
11/08/2019140383626Open ↗
05/15/2017123094043Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
11/08/2019140383608Open ↗
11/08/2019140383626Open ↗
03/04/2016122614723Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
09/04/2026M00451086-I1Open ↗
08/13/2026M00469246-I1Open ↗
08/13/2026M00469179-I1Open ↗
Showing 3 of 4 on file for this type
▸BISNYCECC ANALYSIS3
07/26/2016140520719Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/26/2016140520719Open ↗
Showing 1 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/13/2023140520719Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY11
03/01/2021140771528Open ↗
07/15/2019140860012Open ↗
06/01/2018140771528Open ↗
Showing 3 of 11 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
07/26/2016140520719Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
11/13/2023140520719Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs63
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
07/18/2023123075867Open ↗
04/14/2023140860012Open ↗
03/01/2021140771528Open ↗
Showing 3 of 23 on file for this type
▸BISLANDMARKS APPROVAL12
11/08/2019140383608Open ↗
11/08/2019140383626Open ↗
07/15/2019140860012Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
09/05/2026M00224337-I1Open ↗
09/04/2026M00451086-I1Open ↗
09/04/2026M00451088-I1Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
11/08/2019140383608Open ↗
11/08/2019140383626Open ↗
10/11/2016122554850Open ↗
Showing 3 of 8 on file for this type
▸BISLANDMARKS SIGNOFF3
11/17/2023140520719Open ↗
02/17/2023140860012Open ↗
03/01/2021140771528Open ↗
▸BISFINAL3
11/13/2023140520719Open ↗
02/24/2023123075867Open ↗
02/17/2023140860012Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership27
▸BISCOST AFFIDAVIT20
11/08/2019140383608Open ↗
11/08/2019140383626Open ↗
10/11/2017122356137Open ↗
Showing 3 of 20 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST4
05/26/2020140771528Open ↗
07/17/2019140860012Open ↗
06/05/2018140771528Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
12/12/2023140520719Open ↗
02/24/2023123075867Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms46
▸BISBOROUGH INTAKE FORM20
06/10/2020140771528Open ↗
05/22/2020140771528Open ↗
04/20/2020102584071Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING COVER SHEET12
05/15/2017123094043Open ↗
05/15/2017123094043Open ↗
04/01/2016122703636Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION9
01/13/2020140860012Open ↗
08/10/2018140771528Open ↗
06/06/2016140383626Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
07/15/2019140860012Open ↗
06/01/2018140771528Open ↗
07/26/2016140520719Open ↗
Showing 3 of 5 on file for this type
▸Other Documents19
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION14
10/02/2023104556277Open ↗
05/08/2017123094043Open ↗
04/13/2017123075867Open ↗
Showing 3 of 14 on file for this type
▸BISSupporting Document: Fee Deferment2
04/01/2016122703636Open ↗
01/08/2016122614723Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
06/01/2018140771528Open ↗
▸DOB NOWCalculations1
08/13/2026M01001065-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01001065-I1Open ↗