← Back
BuildNYC
Five to six families
708 MAC DONOUGH STREET
BROOKLYN · BIN 3040341
💬 Discuss this project
1905Year Built
3Stories
C2Building Class
R6BZoning
5,250 sfGross Floor Area
6Units
Rent Stabilized4 Active Violations ▸FDNY Report ↗
Five to six families · Owner of record: MBH Capital · 2,500 sf lot · 2.1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 3Unit PH6O6p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
Cellar8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MBH Capital203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/30/2023$1.7M—FEDERAL BRICK MANAGEMENT GROUP LLC → MBH CAPITAL LLC$319/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Shahrish Shuvo Engineering407/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Allstate Expediters803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MK General Construction IGeneral Contractor603/21/2026
Roney ElectricElectrical103/22/2026
Plumbing-It MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Shuvo Engineering8524307/19/2023
Building Lifecycle
All (109)Filed (4)Permit Issued (3)Signed Off (3)Violation (60)Inspection (5)Objection (4)Special Inspection (30)
04/11/2024
Violation issued (HPD, closed)
A
10/30/2023
Signed off — Alteration
Mechanical plans hereby filed in conjunction with B00818562-I1
B00818562-S1
10/12/2023
Signed off — Alteration
Mechanical plans hereby filed in conjunction with B00818562-I1
B00818562-S2
10/11/2023
Signed off — Alteration
Mechanical plans hereby filed in conjunction with B00818562-I1
B00818562-I1
09/18/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
08/02/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
08/02/2023
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
08/02/2023
Special inspection requirement — Final
Shahrish Shuvo
08/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
08/02/2023
Special inspection requirement — Fenestration areas
Shahrish Shuvo
08/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
08/02/2023
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
08/02/2023
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
08/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
08/02/2023
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
08/02/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
08/02/2023
Special inspection requirement — Lighting controls
Shahrish Shuvo
07/19/2023
Filed — Alteration
Mechanical plans hereby filed in conjunction with B00818562-I1
B00818562-P1
07/17/2023
Special inspection requirement — Fenestration areas
Shahrish Shuvo
07/17/2023
Special inspection requirement — Final
Shahrish Shuvo
07/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
07/17/2023
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
07/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
Shahrish Shuvo
07/17/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
07/17/2023
Special inspection requirement — Lighting controls
Shahrish Shuvo
07/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
Shahrish Shuvo
07/17/2023
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
07/17/2023
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
07/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
07/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/12/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
06/12/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/23/2023
Violation issued (HPD, closed)
A
03/21/2023
Permit issued — Plumbing
B00818562-S1-PL
03/16/2023
Permit issued — General Construction
B00818562-I1-GC
03/16/2023
Permit issued — Mechanical Systems
B00818562-S2-MS
02/16/2023
Filed — Alteration
Mechanical plans hereby filed in conjunction with B00818562-I1
B00818562-S2
02/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
02/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
02/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
02/15/2023
Objection raised — Other
02/15/2023
Objection resolved — Addressed
02/15/2023
Special inspection requirement — Ventilation and air distribution system
Shahrish Shuvo
02/10/2023
Objection raised — Inspections
02/10/2023
Objection resolved — Addressed
02/02/2023
Filed — Alteration
Mechanical plans hereby filed in conjunction with B00818562-I1
B00818562-S1
01/25/2023
Filed — Alteration
Mechanical plans hereby filed in conjunction with B00818562-I1
B00818562-I1
03/01/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
08/09/2021
Violation issued (HPD, closed)
B
08/09/2021
Violation issued (HPD, closed)
B
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJVR Plumbing and Heating03/21/2023
DOB NOWGeneral ConstructionSigned-offMK General Construction I03/16/2023
DOB NOWMechanical SystemsSigned-offMK General Construction I03/16/2023
1 project · most recent 10/18/2023
General Wiring
FiledStatusContractorScope
10/18/2023CompleteRoney ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/18/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/12/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/12/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/12/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
08/02/2023Fire-Resistant Penetrations and JointsShahrish Shuvospecial
08/02/2023Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
08/02/2023Fire-Resistance Rated ConstructionShahrish Shuvoprogress
08/02/2023FinalShahrish Shuvoprogress
08/02/2023Energy Code Compliance InspectionsShahrish Shuvoprogress
08/02/2023Fenestration areasShahrish Shuvoenergy_progress
08/02/2023HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
08/02/2023Fenestration air leakageShahrish Shuvoenergy_progress
08/02/2023Insulation placement and R valuesShahrish Shuvoenergy_progress
08/02/2023HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
08/02/2023Lighting in dwelling unitsShahrish Shuvoenergy_progress
08/02/2023Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
08/02/2023Lighting controlsShahrish Shuvoenergy_progress
07/17/2023Fenestration areasShahrish Shuvoenergy_progress
07/17/2023FinalShahrish Shuvoprogress
07/17/2023Fire-Resistance Rated ConstructionShahrish Shuvoprogress
07/17/2023Fenestration air leakageShahrish Shuvoenergy_progress
07/17/2023HVAC-R and service water heating system controlsShahrish Shuvoenergy_progress
07/17/2023Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
07/17/2023Lighting controlsShahrish Shuvoenergy_progress
07/17/2023HVAC-R and service water heating equipmentShahrish Shuvoenergy_progress
07/17/2023Insulation placement and R valuesShahrish Shuvoenergy_progress
07/17/2023Lighting in dwelling unitsShahrish Shuvoenergy_progress
07/17/2023Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/17/2023Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
Latest 25 of 35.
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026B00818562-S1Request digital key ↗
08/27/2026B00818562-P1Request digital key ↗
08/27/2026B00818562-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature6
08/27/2026B00818562-S2Open ↗
08/27/2026B00818562-S2Open ↗
08/26/2026B00818562-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026B00818562-S1Open ↗
08/27/2026B00818562-I1Open ↗
08/27/2026B00818562-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/27/2026B00818562-S2Open ↗
08/26/2026B00818562-I1Open ↗
08/23/2026B00818562-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026B00818562-S2Open ↗
08/27/2026B00818562-S1Open ↗
08/27/2026B00818562-P1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents4
▸DOB NOWDHCR Document4
08/13/2026B00818562-P1Open ↗
08/13/2026B00818562-I1Open ↗
08/13/2026B00818562-S1Open ↗
Showing 3 of 4 on file for this type