Three families
708 PUTNAM AVENUE
BROOKLYN · BIN 3045413
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
3,568 sfGross Floor Area
3Units
Rent Stabilized25 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 708 PUTNAM AVE LLC · 2,000 sf lot · 1.78 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire ProtectionGeneral
Roof3p · 1 filing · 9 docs
Floor 317p · 3 filings · 20 docs
Floor 216p · 3 filings · 20 docs
Floor 113p · 1 filing · 18 docs
Cellar21p · 3 filings · 20 docs
Basement15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
490 CHAUNCEY ST2607/08/2026
708 PUTNAM AVE LLC103/22/2026
NYC BUILDING SOLUTIONS CO503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/07/2022$1.4M—— → —$406/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TECHNEMOTION DESIGN707/28/2025
EBDS INC202/07/2025
KNF SERVICES CROP107/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TECHNEMOTION DESIGN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYC BUILDING SOLUTIONS COGeneral Contractor407/08/2026
JP & SON ELECTRIC CORPElectrical103/22/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616407/28/2025
DOYUN KIM; RA7415201/24/2023
Building Lifecycle
All (109)Filed (10)Permit Issued (3)Signed Off (2)Violation (36)Inspection (6)Objection (22)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
07/28/2025
Filed — Alteration CO
RENOVATION OF EXISTING 3 FAM. BUILDING, COMBINE CELLAR WITH BASEMENT, NEW CONVENIENCE STAIR TO ROOF FROM 3RD FLOOR APARTMENT AS PER PLANS, PLUMB. & MECH. FILED SEPERATLY NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00983747-P1
07/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
07/28/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
07/28/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
07/28/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
07/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
07/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
07/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/28/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/28/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
07/28/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
07/28/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
07/28/2025
Special inspection requirement — Metering
FAHAD FATEH
07/28/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
07/28/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
07/28/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
06/10/2025
Violation issued (HPD, closed)
A
05/20/2025
Signed off — Alteration
REMOVE ALL EXISTING PLUMBING FIXTURES, INSTALL ALL NEW FIXTURES IN NEW LOCATIONS, AS PER PLANS, HERE WITH GC WORK TYPE FILED SEPARATELY DOB NOW JOB#B00745436-I1. NO CHANGE IN USE EGRESS OR ANY OCCUPANCY.
B00756027-I1
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
04/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
04/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/07/2025
Filed — Alteration
REMOVE ALL EXISTING PLUMBING FIXTURES, INSTALL ALL NEW FIXTURES IN NEW LOCATIONS, AS PER PLANS, HERE WITH GC WORK TYPE FILED SEPARATELY DOB NOW JOB#B00745436-I1. NO CHANGE IN USE EGRESS OR ANY OCCUPANCY.
B00756027-P4
02/07/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
02/03/2025
Signed off — Alteration CO
RENOVATION OF EXISTING 3 FAM. BUILDING, COMBINE CELLAR WITH BASEMENT, NEW CONVENIENCE STAIR TO ROOF FROM 3RD FLOOR APARTMENT AS PER PLANS, PLUMB. & MECH. FILED SEPERATLY NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00983747-S1
01/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/13/2025
Permit issued — Structural
B00983747-S1-ST
11/12/2024
Permit issued — General Construction
B00983747-I1-GC
11/11/2024
Special inspection requirement — Sprinkler Systems
07/29/2024
Filed — Alteration CO
RENOVATION OF EXISTING 3 FAM. BUILDING, COMBINE CELLAR WITH BASEMENT, NEW CONVENIENCE STAIR TO ROOF FROM 3RD FLOOR APARTMENT AS PER PLANS, PLUMB. & MECH. FILED SEPERATLY NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00983747-S1
07/05/2024
Objection resolved — Addressed
07/05/2024
Objection resolved — Addressed
07/05/2024
Objection resolved — Addressed
06/27/2024
Objection resolved — Addressed
06/27/2024
Objection resolved — Addressed
04/11/2024
Violation issued (HPD, closed)
A
04/10/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
03/27/2024
Objection raised — Fire_Protection
03/27/2024
Objection raised — Zoning
03/27/2024
Objection raised — Scope
03/27/2024
Objection raised — Inspections
03/27/2024
Objection raised — Fire_Protection
03/22/2024
Objection resolved — Addressed
03/12/2024
Objection resolved — Addressed
02/21/2024
Objection raised — Fire_Protection
02/21/2024
Objection raised — Fire_Protection
02/12/2024
Objection raised — Energy
02/09/2024
Objection raised — Cost
02/09/2024
Objection resolved — Addressed
02/09/2024
Objection raised — Zoning
02/09/2024
Objection resolved — Addressed
01/12/2024
Filed — Alteration
REMOVE ALL EXISTING PLUMBING FIXTURES, INSTALL ALL NEW FIXTURES IN NEW LOCATIONS, AS PER PLANS, HERE WITH GC WORK TYPE FILED SEPARATELY DOB NOW JOB#B00745436-I1. NO CHANGE IN USE EGRESS OR ANY OCCUPANCY.
B00756027-P3
01/10/2024
Special inspection requirement — Sprinkler Systems
01/09/2024
Objection raised — Scope
01/01/2024
Filed — Alteration CO
RENOVATION OF EXISTING 3 FAM. BUILDING, COMBINE CELLAR WITH BASEMENT, NEW CONVENIENCE STAIR TO ROOF FROM 3RD FLOOR APARTMENT AS PER PLANS, PLUMB. & MECH. FILED SEPERATLY NO CHANGE IN USE EGRESS OR OCCUPANCY.
B00983747-I1
12/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2023
Filed — Alteration
REMOVE ALL EXISTING PLUMBING FIXTURES, INSTALL ALL NEW FIXTURES IN NEW LOCATIONS, AS PER PLANS, HERE WITH GC WORK TYPE FILED SEPARATELY DOB NOW JOB#B00745436-I1. NO CHANGE IN USE EGRESS OR ANY OCCUPANCY.
B00756027-P2
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offNYC BUILDING SOLUTIONS CO01/13/2025
DOB NOWGeneral ConstructionPermit IssuedNYC BUILDING SOLUTIONS CO11/12/2024
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC10/13/2022
1 project · most recent 01/27/2025
General Wiring
FiledStatusContractorScope
01/27/2025CompleteJP & SON ELECTRIC CORPGeneral Wiring
1 project · most recent 07/28/2025
Steel Wood
FiledStatusContractorScope
07/28/2025Signed-offNYC BUILDING SOLUTIONS COSteel, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
07/28/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
07/28/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
07/28/2025Fenestration areasFAHAD FATEHenergy_progress
07/28/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
07/28/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
07/28/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
07/28/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/28/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
07/28/2025Lighting controlsFAHAD FATEHenergy_progress
07/28/2025Maintenance informationFAHAD FATEHenergy_progress
07/28/2025Interior lighting powerFAHAD FATEHenergy_progress
07/28/2025MeteringFAHAD FATEHenergy_progress
07/28/2025Permanent certificateFAHAD FATEHenergy_progress
07/28/2025Fenestration air leakageFAHAD FATEHenergy_progress
07/28/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
04/07/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
04/07/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/07/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/07/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/07/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/07/2025Sprinkler SystemsFAHAD FATEHspecial
11/11/2024Sprinkler Systems—special
01/10/2024Sprinkler Systems—special
12/14/2022Insulation placement and R valuesDOYUN KIMenergy_progress
12/14/2022Lighting in dwelling unitsDOYUN KIMenergy_progress
Latest 25 of 35.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/29/2026B00745436-I1Request digital key ↗
08/29/2026B00745436-P1Request digital key ↗
08/29/2026B00756027-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00983747-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/29/2026B00745436-I1Open ↗
08/29/2026B00756027-P2Open ↗
08/29/2026B00756027-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026B00745436-P1Open ↗
08/31/2026B00745436-P1Open ↗
08/24/2026B00756027-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026B00745436-P1Open ↗
08/24/2026B00756027-I1Open ↗
08/24/2026B00756027-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00983747-I1Open ↗
08/13/2026B00983747-P1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/29/2026B00745436-I1Open ↗
08/29/2026B00756027-P1Open ↗
08/29/2026B00756027-P4Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/29/2026B00756027-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/13/2026B00983747-P1Open ↗
08/13/2026B00983747-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00983747-I1Open ↗