Over six families without stores
709 EAST 216 STREET
BRONX · Williamsbridge-Olinville · BIN 2057949
💬 Discuss this project
2023Year Built
4Stories
C1Building Class
R7AZoning
8,402 sfGross Floor Area
18Units
Rent Stabilized0 Open Violations
Over six families without stores · Owner of record: 709 EAST 216 LLC · 3,181 sf lot · 2.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof53p · 3 filings · 20 docs
Penthouse42p · 1 filing · 20 docs
Floor 455p · 2 filings · 20 docs
Floor 355p · 2 filings · 20 docs
Floor 255p · 2 filings · 20 docs
Floor 159p · 3 filings · 20 docs
Cellar42p · 1 filing · 20 docs
Site & exterior36p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
709 EAST 216803/21/2026
ABSAR REALTY COMPANY103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/21/2022$810K—Private party → 709 EAST 216 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NODE ARCHITECTURE,ENGINEERING, CONS1310/31/2024
PAUL G. JONES, P.E.108/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NODE ENGINEERING CONSULTING2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WALL TO WALL CONSTRUCTIO*General Contractor3507/08/2026
BOND CONSTRUCTION INCGeneral Contractor507/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor303/21/2026
DENNISON ELECTRIC CORPElectrical103/22/2026
LLOYD G DRUMMOND PLBG&GENFire Protection107/08/2026
DOUG'S PLBG & HTG SERV COPlumbing107/08/2026
LLOYD G DRUMMOND PLBG&GENPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
INTERNATIONAL GEOTEHCNICA1795710/31/2024
NODE ARCHITECTURE,ENGINEE6799910/31/2024
Building Lifecycle
All (121)Filed (14)Permit Issued (20)Signed Off (9)Violation (7)Inspection (10)Objection (28)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
01/09/2025
Signed off — New Building
Sprinkler installation in conjunction with NB application #X00672299-I1.
X00672299-S1
11/20/2024
Permit issued — Plumbing
X00672299-S1-PL
10/31/2024
Filed — New Building
Sprinkler installation in conjunction with NB application #X00672299-I1.
X00672299-P3
10/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
10/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
10/29/2024
Special inspection requirement — Maintenance information
MICHAEL KARANTINIDIS, P.E.
10/29/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MICHAEL KARANTINIDIS, P.E.
10/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
10/29/2024
Special inspection requirement — Energy Code Compliance Inspections
10/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
09/18/2024
Signed off — New Building
Sprinkler installation in conjunction with NB application #X00672299-I1.
X00672299-S2
09/16/2024
Signed off — New Building
Sprinkler installation in conjunction with NB application #X00672299-I1.
X00672299-S3
09/12/2024
421-a(16) registration filed
09/03/2024
Filed — New Building
Sprinkler installation in conjunction with NB application #X00672299-I1.
X00672299-P2
08/29/2024
Special inspection requirement — Final
MICHAEL KARANTINIDIS, P.E.
08/29/2024
Special inspection requirement — Energy Code Compliance Inspections
08/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
08/29/2024
Special inspection requirement — Shutoff dampers
08/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL KARANTINIDIS, P.E.
08/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MICHAEL KARANTINIDIS, P.E.
08/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL KARANTINIDIS, P.E.
08/29/2024
Special inspection requirement — Duct leakage testing, insulation and design
08/29/2024
Special inspection requirement — Mechanical Systems
MICHAEL KARANTINIDIS, P.E.
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/02/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/31/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/31/2024
Special inspection requirement — Maintenance information
Radomir Delic
07/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Radomir Delic
07/31/2024
Special inspection requirement — Fire-Resistance Rated Construction
Radomir Delic
07/31/2024
Special inspection requirement — Energy Code Compliance Inspections
Radomir Delic
07/31/2024
Special inspection requirement — Insulation placement and R values
Radomir Delic
07/31/2024
Special inspection requirement — Protection of exposed foundation insulation
Radomir Delic
07/31/2024
Special inspection requirement — Fenestration air leakage
Radomir Delic
07/31/2024
Special inspection requirement — Fenestration areas
Radomir Delic
07/31/2024
Special inspection requirement — Interior lighting power
Radomir Delic
07/31/2024
Special inspection requirement — Lighting in dwelling units
Radomir Delic
07/31/2024
Special inspection requirement — Metering
Radomir Delic
07/31/2024
Special inspection requirement — Air barrier - visual inspection
Radomir Delic
07/31/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Radomir Delic
07/30/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
07/25/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/19/2024
Filed — New Building
Sprinkler installation in conjunction with NB application #X00672299-I1.
X00672299-P1
07/18/2024
Signed off — Alteration
Structural work in conjunction with GC application #X00672299-I1
X00711882-I1
07/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/10/2024
Signed off — Alteration
TEMPORARY INSTALLATION OF HEAVY DUTY SIDEWALK SHED/OVERHEAD PROTECTION AS PER DRAWINGS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS, AND OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022
X00913066-I1
07/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/17/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
04/25/2024
Permit issued — General Construction
X00672299-I1-GC
04/22/2024
Signed off — Alteration
Construction Fence filed in conjunction with nb # X00672299-I1 and Demo#220741856
X00672288-I1
03/12/2024
Signed off — Alteration
HEREWITH FILING ROOF PROTECTION PLANS
X00749524-I1
02/26/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/05/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/11/2024
Signed off — Alteration
Support of excavation in conjunction with NB application #X00672299-I1
X00711878-I1
12/04/2023
Permit issued — Mechanical Systems
X00672299-S2-MS
11/15/2023
Filed — New Building
Sprinkler installation in conjunction with NB application #X00672299-I1.
X00672299-S2
10/26/2023
Permit issued — Plumbing
X00672299-S1-PL
10/26/2023
Permit issued — Sprinklers
X00672299-S3-EW-SP
09/28/2023
Filed — New Building
Sprinkler installation in conjunction with NB application #X00672299-I1.
X00672299-S1
09/28/2023
Filed — New Building
Sprinkler installation in conjunction with NB application #X00672299-I1.
X00672299-S3
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDOUG'S PLBG & HTG SERV CO11/20/2024
DOB NOWGeneral ConstructionPermit IssuedWALL TO WALL CONSTRUCTIO*04/25/2024
DOB NOWMechanical SystemsSigned-offWALL TO WALL CONSTRUCTIO*12/04/2023
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN10/26/2023
DOB NOWSprinklersSigned-offLLOYD G. DRUMMOND10/26/2023
DOB NOWProtection and Mechanical MethodsSigned-offWALL TO WALL CONSTRUCTIO*09/05/2023
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING08/09/2023
DOB NOWStructuralSigned-offWALL TO WALL CONSTRUCTIO*08/08/2023
DOB NOWGeneral ConstructionPermit IssuedWALL TO WALL CONSTRUCTIO*07/28/2023
DOB NOWConstruction FenceSigned-offWALL TO WALL CONSTRUCTIO*06/26/2023
DOB NOWSupport of ExcavationSigned-offWALL TO WALL CONSTRUCTIO*04/27/2023
DOB NOWFoundationSigned-offWALL TO WALL CONSTRUCTIO*04/27/2023
DOB NOWEarth WorkSigned-offWALL TO WALL CONSTRUCTIO*03/31/2023
DOB NOWSupport of ExcavationSigned-offWALL TO WALL CONSTRUCTIO*03/31/2023
DOB NOWFoundationSigned-offWALL TO WALL CONSTRUCTIO*06/29/2022
DOB NOWSupport of ExcavationSigned-offWALL TO WALL CONSTRUCTIO*06/29/2022
DOB NOWConstruction FenceSigned-offWALL TO WALL CONSTRUCTIO*06/29/2022
DOB NOWFoundationSigned-offBOND CONSTRUCTION INC05/12/2022
DOB NOWSupport of ExcavationSigned-offBOND CONSTRUCTION INC05/05/2022
DOB NOWConstruction FenceSigned-offBOND CONSTRUCTION INC02/06/2022
BIS—ISSUEDFRSS GROUP CORP07/14/2022
BIS—ISSUEDN/A03/30/1990
1 project · most recent 10/31/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/31/2024Permit IssuedWALL TO WALL CONSTRUCTIO*Heating and Air Conditioning Systems
Heat / Cool
Gree 4LIV12HP230V1AO 12,000 BTU · Condensing Unit ×40
1 project · most recent 10/31/2024
Storm Water/Sanitary
FiledStatusContractorScope
10/31/2024Signed-offDOUG'S PLBG & HTG SERV COStorm, Water/Sanitary
2 projects · most recent 04/01/2024
General Wiring
FiledStatusContractorScope
04/01/2024CompleteDENNISON ELECTRIC CORPGeneral Wiring
08/02/2023CompleteSOLAS ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/31/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/30/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
07/25/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/17/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
02/26/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/05/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
10/29/2024HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
10/29/2024HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
10/29/2024Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
10/29/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMICHAEL KARANTINIDIS, P.E.special
10/29/2024Fire-Resistant Penetrations and JointsRadomir Delicspecial
10/29/2024Energy Code Compliance Inspections—progress
10/29/2024HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
08/29/2024FinalMICHAEL KARANTINIDIS, P.E.progress
08/29/2024Energy Code Compliance Inspections—progress
08/29/2024Fire-Resistance Rated Construction—progress
08/29/2024Shutoff dampers—energy_progress
08/29/2024HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
08/29/2024HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
08/29/2024HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
08/29/2024Duct leakage testing, insulation and design—energy_progress
08/29/2024Mechanical SystemsMICHAEL KARANTINIDIS, P.E.special
08/29/2024Fire-Resistant Penetrations and Joints—special
07/31/2024Maintenance informationRadomir Delicenergy_progress
07/31/2024Fire-Resistant Penetrations and JointsRadomir Delicspecial
07/31/2024Fire-Resistance Rated ConstructionRadomir Delicprogress
07/31/2024Energy Code Compliance InspectionsRadomir Delicprogress
07/31/2024Insulation placement and R valuesRadomir Delicenergy_progress
07/31/2024Protection of exposed foundation insulationRadomir Delicenergy_progress
07/31/2024Fenestration air leakageRadomir Delicenergy_progress
07/31/2024Fenestration areasRadomir Delicenergy_progress
Latest 25 of 47.
▾Documents — 117 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/24/2026X00672288-I1Request digital key ↗
08/24/2026X00672288-P1Request digital key ↗
08/24/2026X00711878-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
11/04/2024200023456Open ↗
09/09/2022240335179Open ↗
02/23/2022220741856Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
03/27/2024240335179Open ↗
02/16/2024240335179Open ↗
09/09/2022240335179Open ↗
▸BISWORK PERMIT APPLICATION1
07/18/2022220741856Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026X00672299-I1Open ↗
08/13/2026X00672299-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/14/2026X00672299-I1Open ↗
08/13/2026X00672299-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00672299-I1Open ↗
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature14
10/03/2026X00711882-I1Open ↗
08/27/2026X00672299-P3Open ↗
08/27/2026X00672299-P3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/24/2026X00672288-I1Open ↗
08/24/2026X00749524-I1Open ↗
08/24/2026X00672299-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/03/2026X00711882-I1Open ↗
10/03/2026X00711882-I1Open ↗
08/27/2026X00672299-P3Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/09/2022240335179Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/09/2022240335179Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/14/2026X00672299-I1Open ↗
08/13/2026X00672299-P1Open ↗
▸BISELECTRIC CUT-OFF1
06/22/2022220741856Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
06/22/2022220741856Open ↗
▸Safety & Tenant Protection11
▸BISSTREET TREE CHECKLIST2
02/16/2024240335179Open ↗
09/09/2022240335179Open ↗
▸DOB NOWStreet Tree Checklist2
08/14/2026X00672299-I1Open ↗
08/13/2026X00672299-P1Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/22/2022220741856Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/22/2022220741856Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/22/2022220741856Open ↗
▸BISSTREET TREES SITE PLAN1
02/16/2024240335179Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00672299-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00672299-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00672299-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/22/2022220741856Open ↗
▸BISRODENT CONTROL1
06/22/2022220741856Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00672299-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00672299-S1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION6
07/18/2022220741856Open ↗
07/18/2022220741856Open ↗
06/22/2022220741856Open ↗
Showing 3 of 6 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
06/22/2022220741856Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT-SPECIFIC GL INSURANCE1
07/18/2022220741856Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM2
02/23/2022220741856Open ↗
01/21/2022220741856Open ↗
▸BISADDITIONAL INFORMATION1
08/19/2024240335179Open ↗
▸BISEFILING COVER SHEET1
01/21/2022220741856Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/09/2022240335179Open ↗
▸Other Documents16
▸BISBPP - SUPPORTING DOCUMENTATION3
02/16/2024240335179Open ↗
02/16/2024240335179Open ↗
09/09/2022240335179Open ↗
▸DOB NOWSite Survey: Initial2
08/14/2026X00672299-I1Open ↗
08/13/2026X00672299-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/14/2026X00672299-I1Open ↗
08/13/2026X00672299-P1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00711878-I1Open ↗
08/13/2026X00711874-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/14/2026X00672299-I1Open ↗
08/13/2026X00672299-P1Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
02/16/2024240335179Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/27/2024240335179Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/22/2022220741856Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00672299-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00672299-I1Open ↗