← Back
Three families
709 SOUTHERN BOULEVARD
BRONX · BIN 2113013
💬 Discuss this project
2004Year Built
3Stories
C0Building Class
R7-1Zoning
2,502 sfGross Floor Area
3Units
Rent Stabilized22 Open Violations 21 unresolved · 1 paperwork only ▸
Three families · Owner of record: 709-711 SOUTHERN BLVD LLC · 2,842 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
709-711 SOUTHERN BLVD LLC103/22/2026
CLAY DEVELOPMENT203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/24/2020$575K—Private party → 709-711 SOUTHERN BLVD LLC$230/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KDV DESIGNS ARCHITECTS LLC204/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TBC & ASSOC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
IPS PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SY ENGINEERING PLLC5149204/28/2022
Building Lifecycle
All (51)Filed (2)Permit Issued (1)Violation (40)Inspection (3)Special Inspection (5)
05/08/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
06/13/2025
Violation issued (HPD, open)
A
11/22/2024
Violation issued (HPD, open)
I
04/16/2024
Violation issued (HPD, open)
A
11/16/2023
Violation issued (HPD, open)
I
03/30/2023
Violation issued (HPD, open)
A
11/03/2022
Violation issued (HPD, open)
I
05/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/06/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/28/2022
Filed — Alteration
INSTALLING THREE (3) NEW HOT WATER HEATERS WITH THREE (3) NEW HOT WATER COILS IN BASEMENT OF EXISTING DWELLING. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00499418-P1
04/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
04/25/2022
Special inspection requirement — Energy Code Compliance Inspections
DAVIDSON CHRISTMAS
04/25/2022
Special inspection requirement — HVAC-R and service water heating system controls
SUNGBOM YI
04/25/2022
Special inspection requirement — HVAC-R and service water heating equipment
SUNGBOM YI
04/25/2022
Special inspection requirement — Maintenance information
SUNGBOM YI
03/09/2022
Violation issued (HPD, open)
A
03/09/2022
Violation issued (HPD, open)
I
06/14/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/19/2021
Permit issued — Plumbing
X00499418-I1-PL
04/19/2021
Violation issued (HPD, open)
A
04/19/2021
Violation issued (HPD, open)
I
04/17/2021
Filed — Alteration
INSTALLING THREE (3) NEW HOT WATER HEATERS WITH THREE (3) NEW HOT WATER COILS IN BASEMENT OF EXISTING DWELLING. NO OTHER WORK TO BE DONE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00499418-I1
11/04/2019
Violation issued (HPD, open)
I
10/25/2018
Violation issued (HPD, open)
I
12/07/2017
Violation issued (HPD, open)
I
12/29/2016
Violation issued (HPD, closed)
C
12/29/2016
Violation issued (HPD, closed)
C
12/29/2016
Violation issued (HPD, open)
C
11/25/2016
Violation issued (HPD, open)
I
11/16/2015
Violation issued (HPD, open)
B
10/19/2015
Violation issued (HPD, open)
I
05/04/2015
Violation issued (HPD, open)
B
03/03/2015
Violation issued (HPD, open)
I
09/11/2013
Violation issued (HPD, closed)
B
01/07/2009
Violation issued (HPD, closed)
A
12/31/2008
Violation issued (HPD, closed)
A
12/31/2008
Violation issued (HPD, closed)
A
12/31/2008
Violation issued (HPD, closed)
A
12/31/2008
Violation issued (HPD, closed)
C
12/30/2008
Violation issued (HPD, closed)
A
12/30/2008
Violation issued (HPD, closed)
B
12/22/2008
Violation issued (HPD, closed)
B
12/22/2008
Violation issued (HPD, closed)
A
12/22/2008
Violation issued (HPD, closed)
B
12/22/2008
Violation issued (HPD, closed)
B
12/22/2008
Violation issued (HPD, closed)
B
12/22/2008
Violation issued (HPD, closed)
B
03/19/1993
Violation issued (ECB, closed)
Construction
03/19/1993
Violation issued (ECB, closed)
Zoning
11/29/1988
Violation issued (ECB, open)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offIPS PLUMBING CORP05/19/2021
BIS—ISSUEDBELLEROSE BUILDERS. INC.07/14/2004
BIS—ISSUEDBELLEROSE BUILDERS. INC.05/04/2004
1 project · most recent 04/28/2022
Gas
FiledStatusContractorScope
04/28/2022Signed-offIPS PLUMBING CORPGas
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/14/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/25/2022Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
04/25/2022Energy Code Compliance InspectionsDAVIDSON CHRISTMASprogress
04/25/2022HVAC-R and service water heating system controlsSUNGBOM YIenergy_progress
04/25/2022HVAC-R and service water heating equipmentSUNGBOM YIenergy_progress
04/25/2022Maintenance informationSUNGBOM YIenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026X00499418-I1Request digital key ↗
08/25/2026X00499418-P1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026X00499418-P1Open ↗
09/01/2026X00499418-P1Open ↗
09/01/2026X00499418-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026X00499418-P1Open ↗
08/25/2026X00499418-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026X00499418-P1Open ↗