← Back
Three families
71-04 162 STREET
QUEENS · Pomonok-Electchester-Hillcrest · BIN 4534683
💬 Discuss this project
2007Year Built
4Stories
C0Building Class
R6Zoning
3,280 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 1,200 sf lot · 2.73 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 34p · 1 filing · 7 docs
Floor 24p · 2 filings · 9 docs
Floor 1
Cellar5p · 1 filing · 7 docs
Basement1p · 1 filing · 2 docs
Sub-Basement2p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
71 REALTY DEVELOPMENT403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LCW ENGINEERING, P.C.404/22/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor603/21/2026
SAFEPIPE PLUMBING INCPlumbing307/08/2026
ZENG LUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LCW ENGINEERING, PC1103204/22/2022
Building Lifecycle
All (31)Filed (4)Permit Issued (3)Signed Off (3)Violation (15)Inspection (5)Special Inspection (1)
12/02/2024
Violation issued (HPD, closed)
I
03/31/2023
Violation issued (HPD, closed)
A
05/23/2022
Signed off — Alteration
Q00723512-I1
05/17/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/02/2022
Permit issued — General Construction
Q00723512-I1-GC
04/22/2022
Filed — Alteration
Q00723512-I1
03/09/2022
Violation issued (HPD, closed)
A
03/08/2022
Signed off — Alteration
APPLICATION FILED HEREWITH TO RESTORE BACK TO THE LEGAL USE AS PER CO#402186157F, AND TO CORRECT ECB VIOLATION: 39052883K; 39052884M; 39052983H; 39052984J & 39052985L. NO CHANGE THE USE, EGRESS OR OCCUPANCY.
Q00653354-I1
03/08/2022
Signed off — Alteration
APPLICATION FILED HEREWITH TO RESTORE BACK TO THE LEGAL USE AS PER CO#402186157F, AND TO CORRECT ECB VIOLATION: 39052883K; 39052884M; 39052983H; 39052984J & 39052985L. NO CHANGE THE USE, EGRESS OR OCCUPANCY.
Q00653354-S1
03/03/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/16/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/14/2022
Filed — Alteration
APPLICATION FILED HEREWITH TO RESTORE BACK TO THE LEGAL USE AS PER CO#402186157F, AND TO CORRECT ECB VIOLATION: 39052883K; 39052884M; 39052983H; 39052984J & 39052985L. NO CHANGE THE USE, EGRESS OR OCCUPANCY.
Q00653354-P1
02/10/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/16/2022
Permit issued — Plumbing
Q00653354-S1-PL
01/14/2022
Permit issued — General Construction
Q00653354-I1-GC
12/28/2021
Filed — Alteration
APPLICATION FILED HEREWITH TO RESTORE BACK TO THE LEGAL USE AS PER CO#402186157F, AND TO CORRECT ECB VIOLATION: 39052883K; 39052884M; 39052983H; 39052984J & 39052985L. NO CHANGE THE USE, EGRESS OR OCCUPANCY.
Q00653354-I1
12/28/2021
Filed — Alteration
APPLICATION FILED HEREWITH TO RESTORE BACK TO THE LEGAL USE AS PER CO#402186157F, AND TO CORRECT ECB VIOLATION: 39052883K; 39052884M; 39052983H; 39052984J & 39052985L. NO CHANGE THE USE, EGRESS OR OCCUPANCY.
Q00653354-S1
12/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
luis wong
12/16/2021
Violation issued (ECB, closed)
Construction
12/16/2021
Violation issued (ECB, closed)
Construction
12/16/2021
Violation issued (ECB, closed)
Construction
12/15/2021
Violation issued (ECB, closed)
Construction
12/15/2021
Violation issued (ECB, closed)
Construction
04/19/2021
Violation issued (HPD, closed)
A
10/26/2018
Violation issued (HPD, closed)
I
12/08/2017
Violation issued (HPD, closed)
I
11/28/2016
Violation issued (HPD, closed)
I
10/20/2015
Violation issued (HPD, closed)
I
03/04/2015
Violation issued (HPD, closed)
I
12/28/2005
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC05/02/2022
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG01/16/2022
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC01/14/2022
BIS—ISSUEDGREAT SUCCESS CONSTRUCTION INC09/18/2006
BIS—ISSUEDGREAT SUCCESS CONSTRUCTION INC08/23/2006
BISPLISSUEDCATMAN PLUMBING INC12/20/2005
BIS—ISSUEDGREAT SUCCESS CONSTRUCTION INC09/20/2005
BIS—ISSUEDFIRST CLASS WRECKING06/15/2004
BISEQISSUEDFIRST CLASS WRECKING06/15/2004
1 project · most recent 01/26/2022
General Wiring
FiledStatusContractorScope
01/26/2022CompleteKYL ELECTRIC LLCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/17/2022Pass-Final General Construction Non-Directive 14PassView ↗
03/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/24/2022Pass-Final General Construction Non-Directive 14PassView ↗
02/16/2022Fail-Final General Construction Non-Directive 14FailView ↗
02/10/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
12/23/2021Fire-Resistant Penetrations and Jointsluis wongspecial
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00653354-P1Request digital key ↗
08/26/2026Q00653354-S1Request digital key ↗
08/26/2026Q00653354-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00653354-P1Open ↗
08/26/2026Q00653354-S1Open ↗
08/26/2026Q00653354-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q00653354-I1Open ↗