← Back
Condo, residential unit in walk-up building
Glenridge Mews Condominium
71-05 FRESH POND ROAD · Ridgewood · BIN 4436539
💬 Discuss this project
1991Year Built
—Stories
R2Building Class
R6BZoning
55,760 sfGross Floor Area
104Units
LL97 CoveredRent Stabilized21 Open Violations 20 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential unit in walk-up building · Owner of record: GLENRIDGE MEWS CONDO · 47,500 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalCivilGeneral
Roof6p · 3 filings · 20 docs
Floor 35p · 1 filing · 13 docs
Floor 25p · 1 filing · 13 docs
Floor 15p · 1 filing · 13 docs
Site & exterior9p · 3 filings · 9 docs
Filed — no permit issued2p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GLENRIDGE MEWS CONDO CO DEKAT M303/21/2026
T-MOBILE103/21/2026
CELL TOWER LEASING103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MJM+A ARCHITECTS, PLLC208/17/2023
APT ENGINEERING307/27/2022
JOEL PHAGOO P.E. PLLC405/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE803/21/2026
CONSTRUCTION PERMIT SERVICES303/21/2026
OCULUS CONSULTING GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UPTOWN CONSTRUCTION GROUPGeneral Contractor1203/21/2026
HIMALAYA TOWERSGeneral Contractor607/08/2026
KNS BUILDING REST. INCGeneral Contractor403/21/2026
ODYSSIA GLOBAL COMM. CORPGeneral Contractor203/21/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
LKR TECHNICAL SERVICELLCGeneral Contractor103/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OCULUS CONSULTING GROUP C3609208/17/2023
AMARACON TESTING & INSPEC5842107/27/2022
JOEL PHAGOO ,PE, PLLC2416105/26/2022
Building Lifecycle
All (84)Filed (9)Permit Issued (12)Signed Off (1)Violation (47)Objection (8)Special Inspection (7)
03/31/2026
Permit issued — Antenna
Q00577214-I1-AN
12/01/2025
Permit issued — Antenna
Q00577214-I1-AN
06/12/2025
Violation issued (HPD, closed)
A
06/24/2024
Signed off — Alteration
Select repair South, East & West facades of Bldg "D" incl the removal of deteriorated facade stucco, repair & replacement of cracked brick masonry & assoc components.Installation of a new ext panel system at ex facade location.No change occup, use, egress
Q00528644-I1
08/18/2023
Special inspection requirement — Final
John Scheschareg
08/18/2023
Special inspection requirement — Masonry
John Scheschareg
08/17/2023
Filed — Alteration
Select repair South, East & West facades of Bldg "D" incl the removal of deteriorated facade stucco, repair & replacement of cracked brick masonry & assoc components.Installation of a new ext panel system at ex facade location.No change occup, use, egress
Q00528644-P1
08/17/2023
Special inspection requirement — Final
John Scheschareg
08/17/2023
Special inspection requirement — Masonry
John Scheschareg
06/20/2023
Permit issued — Antenna
Q00577214-I1-AN
06/20/2023
Permit issued — Mechanical Systems
Q00577233-I1-MS
03/31/2023
Permit issued — General Construction
Q00528644-I1-GC
03/30/2023
Violation issued (HPD, closed)
A
11/16/2022
Violation issued (HPD, closed)
I
10/04/2022
Violation issued (HPD, closed)
C
10/04/2022
Violation issued (HPD, open)
A
10/04/2022
Violation issued (HPD, closed)
C
09/12/2022
Permit issued — Mechanical Systems
Q00577233-I1-MS
07/31/2022
Objection raised — Other
07/31/2022
Objection resolved — Addressed
07/27/2022
Filed — Alteration
REPLACEMENT OF EXISTING 30KW NATURAL GAS GENERATOR WITH NEW 50KW NATURAL GAS GENERATOR ON ROOF WITH RELATED GAS PIPING MODIFICATIONS FILED UNDER DOB APPLICATION NO. Q00577238. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00577233-I1
07/27/2022
Filed — Alteration
PROPOSED CONNECTION TO EXISTING NATURAL GAS SERVICE FROM METER AT GRADE LEVEL FOR NEW GENERATOR REPLACEMENT ON ROOF FILED UNDER DOB APPLICATION: Q00577233. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00577238-I1
06/09/2022
Permit issued — Antenna
Q00577214-I1-AN
05/27/2022
Permit issued — Supported Scaffold
Q00718230-I1-SF
05/26/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00718230-I1
05/26/2022
Permit issued — Protection and Mechanical Methods
Q00720057-I1-PM
05/26/2022
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
05/24/2022
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00720057-P1
04/21/2022
Permit issued — Sidewalk Shed
Q00718229-I1-SH
04/21/2022
Permit issued — Protection and Mechanical Methods
Q00720057-I1-PM
04/20/2022
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00718229-I1
04/20/2022
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00720057-I1
04/06/2022
Permit issued — General Construction
Q00528644-I1-GC
03/08/2022
Violation issued (HPD, closed)
A
01/04/2022
Objection raised — 2014-AN AC 28-103.14.1-Adminis
01/04/2022
Objection resolved — Addressed
01/04/2022
Objection raised — 2014-AN BC 1704-Building Code-
01/04/2022
Objection resolved — Addressed
01/04/2022
Objection raised — 2014-AN AC 28-104.7.1-Administ
01/04/2022
Objection resolved — Addressed
12/30/2021
Filed — Alteration
Modification of existing Verizon site. Replace 9 antennas and 3 RRH units on the roof. Remove 4 RRHs and install 4 RRHs and install 1 equipment rack in existing shelter on roof.
Q00577214-I1
08/16/2021
Special inspection requirement — Mechanical Systems
CONNIE PISANI
08/16/2021
Special inspection requirement — Final
Scott Chasse
06/09/2021
Filed — Alteration
Select repair South, East & West facades of Bldg "D" incl the removal of deteriorated facade stucco, repair & replacement of cracked brick masonry & assoc components.Installation of a new ext panel system at ex facade location.No change occup, use, egress
Q00528644-I1
04/25/2021
Violation issued (HPD, open)
A
04/16/2021
Violation issued (HPD, closed)
A
11/04/2019
Violation issued (HPD, closed)
I
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/02/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/01/2010
Violation issued (HPD, open)
B
04/01/2010
Violation issued (HPD, open)
A
04/01/2010
Violation issued (HPD, open)
B
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaPermit IssuedHIMALAYA TOWERS03/31/2026
DOB NOWAntennaPermit IssuedHIMALAYA TOWERS12/01/2025
DOB NOWAntennaPermit IssuedHIMALAYA TOWERS06/20/2023
DOB NOWMechanical SystemsPermit IssuedHIMALAYA TOWERS06/20/2023
DOB NOWGeneral ConstructionSigned-offKNS BUILDING REST03/31/2023
DOB NOWMechanical SystemsPermit IssuedODYSSIA GLOBAL COMM. CORP09/12/2022
DOB NOWAntennaPermit IssuedLKR TECHNICAL SERVICELLC06/09/2022
DOB NOWSupported ScaffoldPermit IssuedUPTOWN CONSTRUCTION GROUP05/27/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedUPTOWN CONSTRUCTION GROUP05/26/2022
DOB NOWSidewalk ShedPermit IssuedUPTOWN CONSTRUCTION GROUP04/21/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedUPTOWN CONSTRUCTION GROUP04/21/2022
DOB NOWGeneral ConstructionSigned-offKNS BUILDING REST04/06/2022
BISOTISSUEDTELCOM ENGINEERING GP INC10/27/2020
BISOTISSUEDTELCOM ENGINEERING GP INC07/03/2019
BISOTISSUEDTELCOM ENGINEERING GP INC07/06/2018
BISOTISSUEDTELCOM ENGINEERING GP INC07/05/2017
BISOTISSUEDTELCOM ENGINEERING GP INC07/21/2016
BISOTISSUEDTELCOM ENGINEERING GP INC07/08/2015
BISOTISSUEDFIVE BOROUGH GEN CONT LLC10/24/2014
BISOTISSUEDTELCOM ENGINEERING GP INC07/03/2014
BISOTISSUEDTELCOM ENGINEERING GP INC01/14/2014
BISOTISSUEDRAMAPO COMMUNICATION CORP07/13/2010
BISOTISSUEDCOSTROTTA CONSTRUCTION MG04/19/2010
BISOTISSUEDBEAM CONSTRUCTION INC10/19/2009
BISOTISSUEDBIG ORANGE CONSULTING05/09/2008
BISPLRE-ISSUEDACCURATE MECHANICAL INC07/09/2007
BISBLRE-ISSUEDACCURATE MECHANICAL INC07/09/2007
BISPLISSUEDACCURATE MECHANICAL INC10/06/2006
BISPLISSUEDACCURATE MECHANICAL INC10/06/2006
BISPLISSUEDJOHN'S PLBG & HTG, INC04/25/2006
BISOTISSUEDTRI STATE TELECOMMUNICATIONS04/13/2006
BISMHISSUEDTRI STATE TELECOMMUNICATIONS INC04/10/2006
BISPLISSUEDACCURATE MECHANICAL INC04/06/2006
BISBLISSUEDACCURATE MECHANICAL INC04/06/2006
BISPLISSUEDACCURATE MECHANICAL INC03/29/2004
BISOTISSUEDL & Z RESTORATION CORP11/06/2003
BISOTISSUEDSTONEWALL CONTRACTING CORP.01/08/2001
1 project · most recent 07/27/2022
Gas
FiledStatusContractorScope
07/27/2022——Gas
2 projects · most recent 07/08/2024
General Wiring
FiledStatusContractorScope
07/08/2024CompleteAMKRO ELECTRIC INCGeneral Wiring
04/13/2022Permit IssuedHIGH QUALITY ELECTRIC OF—
2 projects · most recent 05/26/2022
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/26/2022Permit IssuedUPTOWN CONSTRUCTION GROUPScaffold
04/20/2022Permit IssuedUPTOWN CONSTRUCTION GROUPSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
08/18/2023FinalJohn Schescharegprogress
08/18/2023MasonryJohn Schescharegspecial
08/17/2023FinalJohn Schescharegprogress
08/17/2023MasonryJohn Schescharegspecial
05/26/2022Post-installed AnchorsJOEL PHAGOOspecial
08/16/2021Mechanical SystemsCONNIE PISANIspecial
08/16/2021FinalScott Chasseprogress
▾Documents — 122 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026Q00577214-I1Request digital key ↗
08/26/2026Q00718229-I1Request digital key ↗
08/26/2026Q00720057-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION13
10/27/2020440635966Open ↗
07/24/2019420894410Open ↗
08/03/2018420894410Open ↗
Showing 3 of 13 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
10/16/2020440635966Open ↗
02/19/2020420894410Open ↗
05/13/2019420894410Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications32
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
11/05/2014421046031Open ↗
09/16/2013420894410Open ↗
09/16/2013420894410Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026Q00720057-I1Open ↗
08/26/2026Q00718230-I1Open ↗
08/26/2026Q00577238-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026Q00577233-I1Open ↗
08/24/2026Q00718230-I1Open ↗
08/23/2026Q00528644-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
11/05/2014421046031Open ↗
10/14/2009420094702Open ↗
04/30/2008410105318Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026Q00577233-I1Open ↗
08/23/2026Q00528644-I1Open ↗
08/22/2026Q00528644-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
10/14/2009420094702Open ↗
04/30/2008410105318Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/16/2020440635966Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/05/2014421046031Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
10/16/2020440635966Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026Q00577233-I1Open ↗
08/24/2026Q00528644-I1Open ↗
08/14/2026Q00577238-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice to Proceed5
08/24/2026Q00528644-I1Open ↗
08/13/2026Q00577214-I1Open ↗
08/13/2026Q00577238-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026Q00528644-I1Open ↗
08/13/2026Q00577238-I1Open ↗
08/13/2026Q00577233-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
10/14/2009420094702Open ↗
04/30/2008410105318Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/16/2020440635966Open ↗
09/16/2013420894410Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
06/14/2010420199243Open ↗
04/05/2010420169070Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
01/05/2021440635966Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
10/16/2020440635966Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/05/2021440635966Open ↗
10/27/2020440635966Open ↗
10/16/2020440635966Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/05/2014421046031Open ↗
09/16/2013420894410Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/05/2021440635966Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/13/2020420894410Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
01/05/2021440635966Open ↗
11/20/2020420894410Open ↗
10/27/2020440635966Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs8
▸BISADMINISTRATIVE OBJECTIONS5
11/05/2014421046031Open ↗
06/14/2010420199243Open ↗
04/05/2010420169070Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
01/05/2021440635966Open ↗
12/04/2020420894410Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/02/2020420894410Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
01/05/2021440635966Open ↗
10/16/2020440635966Open ↗
11/05/2014421046031Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET4
11/05/2014421046031Open ↗
09/16/2013420894410Open ↗
10/14/2009420094702Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/16/2020440635966Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q00720057-P1Open ↗