← Back
Public elementary, junior or senior high
P.S. 196 Grand Central Parkway
71-25 113 STREET · BIN 4052713
💬 Discuss this project
1952Year Built
3Stories
W1Building Class
R1-2AZoning
130,347 sfGross Floor Area
0Units
LL97 Covered15 Open Violations 4 unresolved · 11 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 116,150 sf lot · 1.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingOther
Roof18p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 10 docs
Floor 214p · 3 filings · 20 docs
Floor 116p · 4 filings · 20 docs
Cellar14p · 3 filings · 20 docs
Sub-Cellar15p · 3 filings · 20 docs
Basement3p · 2 filings · 20 docs
Sub-Basement12p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTIONAUTHORITY10207/08/2026
GENERATE CAPITAL307/08/2026
NYC DEPARTMENT OF PARKS AND RECREATION103/22/2026
DEPARTMENT OF EDUCATION903/22/2026
CITNALTA CONSTRUCTION603/22/2026
CITHALTA CONSTRUCTION103/22/2026
DEPT OF EDUCATION P.S.196203/22/2026
DEPT. OF EDUCATION 0103/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
DOE PS 196 040103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JMV ASSOCIATES803/21/2026
JMG CONSULTANTS403/21/2026
PRECISION 3SIXTY NYC, INC403/21/2026
SOL BUILDING CONSULTING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITNALTA CONSTRUCTIONGeneral Contractor1807/08/2026
PJP INSTALLERS INCGeneral Contractor407/08/2026
LINCOLN BAKERElectrical103/21/2026
ANCO ELECTL CONTCTNG INCElectrical103/22/2026
ACCORD POWER INCGeneral Contractor107/08/2026
STANCO SYSTEM ELEC'L CONTElectrical103/22/2026
BAKER LINCOLNElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS400911/06/2025
HOMERUN SOLAR8772104/05/2024
RP ENGINEERING, PC7930104/05/2024
JPC LOGISTICS DBA JPCL EN351101/08/2024
Building Lifecycle
All (132)Filed (14)Permit Issued (14)Signed Off (7)Violation (60)Inspection (5)Objection (7)Special Inspection (25)
07/22/2026
Violation issued (ECB, open)
Construction
07/22/2026
Violation issued (ECB, open)
Construction
07/22/2026
Violation issued (ECB, open)
Construction
07/20/2026
Signed off — Alteration
Proposed seismic restraints for plumbing in conjunction with 4 story addition at PS 196Q. All as per plans filed herewith.
Q00641474-I1
07/01/2026
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
07/01/2026
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
11/19/2025
Signed off — Alteration
Seismic Restraints for Electrical Trade in conjunction with 4 story addition. All as per plans filed herewith.
Q00645591-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/12/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/07/2025
Objection raised — Other
11/06/2025
Filed — Alteration
Proposed seismic restraints for plumbing in conjunction with 4 story addition at PS 196Q. All as per plans filed herewith.
Q00641474-P2
10/28/2025
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
10/28/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
10/27/2025
Violation issued (ECB, open)
Construction
10/27/2025
Violation issued (ECB, open)
Construction
10/27/2025
Violation issued (ECB, open)
Construction
10/24/2025
Violation issued (ECB, open)
Construction
08/05/2025
Signed off — Alteration
PROPOSED SEISMIC BRACING FOR SPRINKLER & STANDPIPE (ONLY). IN CONJUNCTION WITH ALTERATION TYPE 1 APPLICATION # 421101042 AS PER PLANS FILED HEREWITH.
Q00650326-I1
08/05/2025
Signed off — Alteration
PS 196Q FILING FOR SEISMIC BRACE DESIGN FOR DUCT WORK /MECHANICAL TRADE. JOB IN CONJUNCTION WITH NEW ADDITION DOB # 421101042
Q00682048-I1
07/30/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/11/2024
Signed off — Alteration
Q01025198-I1
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/29/2024
Violation issued (ECB, closed)
Construction
07/29/2024
Violation issued (ECB, open)
Construction
07/29/2024
Violation issued (ECB, open)
Construction
07/29/2024
Violation issued (ECB, open)
Construction
07/29/2024
Violation issued (ECB, open)
Construction
04/16/2024
Permit issued — Solar
Q01025198-I1-SL
04/05/2024
Filed — Alteration
Q01025198-I1
03/25/2024
Special inspection requirement — Air barrier - visual inspection
RUCHIT PATEL
03/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUCHIT PATEL
03/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
RAYMOND PANCHARI
03/25/2024
Special inspection requirement — Energy Code Compliance Inspections
RUCHIT PATEL
03/25/2024
Special inspection requirement — Final
RUCHIT PATEL
02/21/2024
Objection resolved — Addressed
01/15/2024
Objection raised — Other
01/08/2024
Filed — Alteration
THE SCOPE OF WORK INCLUDES THE INSTALLATION OF THE SUPPLEMENTAL COOLING SYSTEMS FOR THE FIRST FLOOR AUDITORIUM.
Q00956681-I1
01/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/01/2023
Special inspection requirement — Final
Asma Hashmi
11/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
11/01/2023
Special inspection requirement — Mechanical Systems
Asma Hashmi
11/01/2023
Special inspection requirement — Post-installed Anchors
Asma Hashmi
10/30/2023
Signed off — Alteration
PS 196Q - Herewith Filing For The Installation Of Scaffold As Per Plans.
Q00447397-I1
03/14/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/09/2023
Signed off — Alteration
Q00447091-I1
01/30/2023
Permit issued — General Construction
Q00645474-I1-GC
12/05/2022
Filed — Alteration
Proposed seismic restraints for plumbing in conjunction with 4 story addition at PS 196Q. All as per plans filed herewith.
Q00641474-P1
11/23/2022
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
11/23/2022
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
09/01/2022
Permit issued — Supported Scaffold
Q00447397-I1-SF
08/15/2022
Permit issued — General Construction
Q00645591-I1-GC
08/15/2022
Permit issued — General Construction
Q00650326-I1-GC
08/15/2022
Permit issued — General Construction
Q00682048-I1-GC
08/10/2022
Violation issued (ECB, closed)
Unknown
08/05/2022
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
08/05/2022
Special inspection requirement — Seismic Isolation Systems
NELSON LOPEZ
08/03/2022
Filed — Alteration
PROPOSED SEISMIC BRACING FOR SPRINKLER & STANDPIPE (ONLY). IN CONJUNCTION WITH ALTERATION TYPE 1 APPLICATION # 421101042 AS PER PLANS FILED HEREWITH.
Q00650326-P1
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offACCORD POWER INC04/16/2024
DOB NOWGeneral ConstructionPermit IssuedCITNALTA CONSTRUCTION01/30/2023
DOB NOWSupported ScaffoldSigned-offCITNALTA CONSTRUCTION09/01/2022
DOB NOWGeneral ConstructionSigned-offCITNALTA CONSTRUCTION08/15/2022
DOB NOWGeneral ConstructionSigned-offCITNALTA CONSTRUCTION08/15/2022
DOB NOWGeneral ConstructionSigned-offCITNALTA CONSTRUCTION08/15/2022
DOB NOWGeneral ConstructionPermit IssuedCITNALTA CONSTRUCTION06/17/2022
DOB NOWGeneral ConstructionSigned-offCITNALTA CONSTRUCTION03/04/2022
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC01/12/2022
DOB NOWGeneral ConstructionPermit IssuedCITNALTA CONSTRUCTION12/22/2021
DOB NOWSupported ScaffoldSigned-offCITNALTA CONSTRUCTION06/28/2021
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC03/22/2021
DOB NOWSupported ScaffoldSigned-offCITNALTA CONSTRUCTION02/08/2021
DOB NOWSidewalk ShedSigned-offPJP INSTALLERS INC01/28/2021
BIS—ISSUEDCITNALTA CONSTRUCTION04/25/2024
BIS—ISSUEDCITNALTA CONSTRUCTION04/25/2024
BIS—ISSUEDCITNALTA CONSTRUCTION04/04/2023
BIS—ISSUEDCITNALTA CONSTRUCTION04/04/2023
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY09/16/2022
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY09/16/2022
BISMHISSUEDTAMEER INC08/31/2022
BISOTISSUEDCITNALTA CONSTRUCTION08/16/2022
BIS—RE-ISSUEDCITNALTA CONSTRUCTION08/04/2022
BIS—RE-ISSUEDCITNALTA CONSTRUCTION08/04/2022
BISOTISSUEDNYCSCA08/01/2022
BISSPISSUEDA & F FIRE PROTECTION CO05/27/2022
BISFSISSUEDCHAMPION COMBUSTION CORP04/20/2022
BIS—ISSUEDCITNALTA CONSTRUCTION03/11/2022
BIS—ISSUEDCITNALTA CONSTRUCTION03/09/2022
BISPLISSUEDPHASE 1 GROUP INC02/04/2022
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN02/01/2022
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN12/06/2021
BISEQISSUEDCITNALTA CONSTRUCTION11/09/2021
BISPLISSUEDEAGLE 1 MECHANICAL, INC10/07/2021
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY08/16/2021
BISOTISSUEDNATIONAL ENVIROMENTAL SAFETY08/16/2021
BISOTISSUEDCITNALTA CONSTRUCTION06/25/2021
BIS—ISSUEDCITNALTA CONSTRUCTION03/24/2021
BIS—ISSUEDCITNALTA CONSTRUCTION03/24/2021
BISPLISSUEDOLYMPIC PLBG & HTG SVC IN02/09/2021
+ 24 more permits on file
1 project · most recent 01/08/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/08/2024——Heating and Air Conditioning Systems
Heat / Cool
Fujitsu ASUB36TLAV1 38,000 BTU · Fan Coil Indoor ×8
AOU120RLAVL 135,000 BTU · Condensing Unit ×2
15 projects · most recent 04/14/2026
General Wiring Lighting
FiledStatusContractorScope
04/14/2026Permit IssuedSTANCO SYSTEM ELEC'L CONTGeneral Wiring, Lighting
01/08/2025CompleteCHARAN ELEC'L ENTERP'S IN—
05/13/2024CompleteANCO ELECTL CONTCTNG INC—
03/29/2024CompletePOWER SURGE ELECTRIC, INC—
01/24/2024CompleteANCO ELECTL CONTCTNG INC—
01/12/2023CompleteCHARAN ELEC'L ENTERP'S IN—
08/11/2022Permit IssuedSTANCO SYSTEM ELEC'L CONT—
03/14/2022Permit IssuedLEVINSON & SANTORO ELEC CGeneral Wiring, Lighting
01/07/2021CompleteSTANCO SYSTEM ELEC'L CONT—
01/07/2021CompleteSTANCO SYSTEM ELEC'L CONTGeneral Wiring
12/07/2020CompleteCHARAN ELEC'L ENTERP'S IN—
04/04/2020Permit IssuedA & S ELECTRIC INC.General Wiring
03/20/2020CompleteLEVINSON & SANTORO ELEC C1 meters, 1 new_meters
07/02/2019CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
04/29/2019CompleteSTANCO SYSTEM ELEC'L CONTGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/12/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/14/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
07/01/2026Seismic Isolation SystemsNELSON LOPEZspecial
07/01/2026Post-installed AnchorsNELSON LOPEZspecial
10/28/2025Seismic Isolation SystemsNELSON LOPEZspecial
10/28/2025Post-installed AnchorsNELSON LOPEZspecial
03/25/2024Air barrier - visual inspectionRUCHIT PATELenergy_progress
03/25/2024Fire-Resistant Penetrations and JointsRUCHIT PATELspecial
03/25/2024Structural Stability – Alterations of existing buildingsRAYMOND PANCHARIspecial
03/25/2024Energy Code Compliance InspectionsRUCHIT PATELprogress
03/25/2024FinalRUCHIT PATELprogress
11/01/2023FinalAsma Hashmiprogress
11/01/2023Fire-Resistant Penetrations and JointsAsma Hashmispecial
11/01/2023Mechanical SystemsAsma Hashmispecial
11/01/2023Post-installed AnchorsAsma Hashmispecial
11/23/2022Seismic Isolation SystemsNELSON LOPEZspecial
11/23/2022Post-installed AnchorsNELSON LOPEZspecial
08/05/2022Post-installed AnchorsNELSON LOPEZspecial
08/05/2022Seismic Isolation SystemsNELSON LOPEZspecial
08/02/2022Seismic Isolation SystemsNELSON LOPEZspecial
08/02/2022Post-installed AnchorsNELSON LOPEZspecial
02/16/2022Seismic Isolation SystemsNELSON LOPEZspecial
02/16/2022Post-installed AnchorsNELSON LOPEZspecial
12/10/2021Post-installed AnchorsNELSON LOPEZspecial
12/10/2021Seismic Isolation SystemsNELSON LOPEZspecial
08/20/2021Post-installed AnchorsNELSON LOPEZspecial
08/16/2021Post-installed AnchorsNELSON LOPEZspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 196qEducationSub-cellar, Cellar, Sub-basement, Basement, Floors 1, 2, Roof
Project Q00682048 Alteration · LOC Issued · 02/23/2022
Project Q00645474 Alteration · Permit Entire · 12/16/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 113 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch10
08/26/2026Q00645474-I1Request digital key ↗
08/26/2026Q00645591-I1Request digital key ↗
08/26/2026Q00650326-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
08/27/2026Q00447397-P1Request digital key ↗
08/14/2026Q00447397-I1Request digital key ↗
▸Applications & Permits7
▸DOB NOWHPD - Permit Notice4
08/13/2026Q00641474-I1Open ↗
08/13/2026Q00682048-I1Open ↗
08/13/2026Q00645591-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
10/10/2019421898183Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/18/2022421101042Open ↗
▸BISWORK PERMIT APPLICATION1
03/02/2022421101042Open ↗
▸Seals & Professional Certifications34
▸DOB NOWSpecial Inspector Seal & Signature18
09/22/2026Q00682048-I1Open ↗
09/22/2026Q00682048-I1Open ↗
09/02/2026Q01025198-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026Q00447397-I1Open ↗
08/27/2026Q00447397-P1Open ↗
08/26/2026Q00645474-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026Q01025198-I1Open ↗
09/02/2026Q01025198-I1Open ↗
09/02/2026Q01025198-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWNYCSCA - Approved Site Safety Plans4
08/13/2026Q00447397-P1Open ↗
08/13/2026Q00447091-P1Open ↗
08/13/2026Q00447091-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/23/2026Q01025198-I1Open ↗
▸Approvals, Objections & Sign-offs32
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
08/18/2026Q00641474-P1Open ↗
08/18/2026Q00641474-I1Open ↗
08/13/2026Q01025198-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/27/2026Q00447397-P1Open ↗
08/18/2026Q00641474-P1Open ↗
08/18/2026Q00641474-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)6
08/18/2026Q00641474-I1Open ↗
08/13/2026Q00650326-I1Open ↗
08/13/2026Q00682048-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01025198-I1Open ↗
▸Cost, Insurance & Ownership1
▸DOB NOWNYCSCA Wrap-up Insurance1
08/13/2026Q00447091-I1Open ↗
▸Filing & Intake Forms1
▸BISBOROUGH INTAKE FORM1
03/02/2022421101042Open ↗
▸Other Documents21
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal13
08/18/2026Q00641474-P1Open ↗
08/18/2026Q00641474-P2Open ↗
08/18/2026Q00641474-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWNYCSCA Exhibit 25
08/18/2026Q00641474-I1Open ↗
08/13/2026Q00447397-I1Open ↗
08/13/2026Q00645591-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
08/13/2026Q00447091-P1Open ↗
08/13/2026Q00447091-I1Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026Q00956681-I1Open ↗