1900Year Built
2Stories
A9Building Class
R6BZoning
1,600 sfGross Floor Area
1Units
Miscellaneous one family · 483 sf lot · 3.31 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/08/2021$1.5M—— → —$909/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RONALD NEMEC ARCHITECT PC405/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RICHARD SWANSON403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RYSZARD & SON CONSTRUCTIOGeneral Contractor603/21/2026
H.K. MECHANICAL SVC CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RONALD NEMEC ARCHITECT, P8386203/07/2023
STRUCT. ENGINEERING INTEG4174203/07/2023
Building Lifecycle
All (71)Filed (4)Permit Issued (3)Signed Off (2)Inspection (2)Objection (52)Special Inspection (8)
12/08/2023
Signed off — Alteration
install 3 piece bathroom, washer in cellar, replace fixtures on second floor, no change to use, exits or occupancy, revise existing gas and storm piping, relocate existing gas meter,
B00715854-I1
12/05/2023
Signed off — Alteration
install 3 piece bathroom, washer in cellar, replace fixtures on second floor, no change to use, exits or occupancy, revise existing gas and storm piping, relocate existing gas meter,
B00715854-S1
06/12/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/10/2023
Permit issued — General Construction
B00715854-I1-GC
05/25/2023
Objection raised — Other
05/25/2023
Objection resolved — Addressed
05/09/2023
Filed — Alteration
install 3 piece bathroom, washer in cellar, replace fixtures on second floor, no change to use, exits or occupancy, revise existing gas and storm piping, relocate existing gas meter,
B00715854-P2
05/04/2023
Special inspection requirement — Lighting in dwelling units
Ronald Nemec
05/04/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ronald Nemec
05/04/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chris Yiu
05/04/2023
Special inspection requirement — Final
Ronald Nemec
03/07/2023
Filed — Alteration
install 3 piece bathroom, washer in cellar, replace fixtures on second floor, no change to use, exits or occupancy, revise existing gas and storm piping, relocate existing gas meter,
B00715854-P1
02/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ronald Nemec
02/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Chris Yiu
02/28/2023
Special inspection requirement — Final
Ronald Nemec
02/28/2023
Special inspection requirement — Lighting in dwelling units
Ronald Nemec
01/13/2023
Permit issued — Plumbing
B00715854-S1-PL
12/09/2022
Permit issued — General Construction
B00715854-I1-GC
11/15/2022
Objection raised — Other
11/15/2022
Objection resolved — Addressed
10/25/2022
Objection raised — Other
10/25/2022
Objection resolved — Addressed
10/25/2022
Objection raised — Other
10/25/2022
Objection resolved — Addressed
10/25/2022
Objection raised — Other
10/25/2022
Objection resolved — Addressed
10/25/2022
Objection raised — Other
10/25/2022
Objection resolved — Addressed
09/30/2022
Objection raised — Other
09/30/2022
Objection resolved — Addressed
09/30/2022
Objection raised — Other
09/30/2022
Objection resolved — Addressed
09/30/2022
Objection raised — Other
09/30/2022
Objection resolved — Addressed
09/30/2022
Objection raised — Other
09/30/2022
Objection resolved — Addressed
09/30/2022
Objection raised — Other
09/30/2022
Objection resolved — Addressed
09/30/2022
Objection raised — Other
09/30/2022
Objection resolved — Addressed
09/30/2022
Objection raised — Other
09/30/2022
Objection resolved — Addressed
09/06/2022
Objection raised — Other
09/06/2022
Objection resolved — Addressed
09/06/2022
Objection raised — Other
09/06/2022
Objection resolved — Addressed
09/06/2022
Objection raised — Other
09/06/2022
Objection resolved — Addressed
09/06/2022
Objection raised — Other
09/06/2022
Objection resolved — Addressed
09/06/2022
Objection raised — Other
09/06/2022
Objection resolved — Addressed
09/06/2022
Objection raised — Energy
09/06/2022
Objection resolved — Addressed
09/06/2022
Objection raised — Other
09/06/2022
Objection resolved — Addressed
09/06/2022
Objection raised — Other
09/06/2022
Objection resolved — Addressed
09/06/2022
Objection raised — Other
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRYSZARD & SON CONSTRUCTIO06/10/2023
DOB NOWPlumbingSigned-offH.K. MECHANICAL SVC CORP01/13/2023
DOB NOWGeneral ConstructionSigned-offRYSZARD & SON CONSTRUCTIO12/09/2022
1 project · most recent 05/05/2023
General Wiring
FiledStatusContractorScope
05/05/2023CompleteDENMAR ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/12/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
05/04/2023Lighting in dwelling unitsRonald Nemecenergy_progress
05/04/2023Fire-Resistant Penetrations and JointsRonald Nemecspecial
05/04/2023Structural Stability – Alterations of existing buildingsChris Yiuspecial
05/04/2023FinalRonald Nemecprogress
02/28/2023Fire-Resistant Penetrations and JointsRonald Nemecspecial
02/28/2023Structural Stability – Alterations of existing buildingsChris Yiuspecial
02/28/2023FinalRonald Nemecprogress
02/28/2023Lighting in dwelling unitsRonald Nemecenergy_progress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026B00715854-P1Request digital key ↗
08/15/2026B00715854-S1Request digital key ↗
08/15/2026B00715854-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B00715854-I1Open ↗
08/13/2026B00715854-P1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature4
09/13/2026B00715854-I1Open ↗
09/13/2026B00715854-I1Open ↗
08/28/2026B00715854-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026B00715854-S1Open ↗
08/27/2026B00715854-P1Open ↗
08/27/2026B00715854-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/13/2026B00715854-I1Open ↗
09/13/2026B00715854-I1Open ↗
08/28/2026B00715854-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026B00715854-P1Open ↗
08/15/2026B00715854-S1Open ↗
08/15/2026B00715854-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00715854-I1Open ↗