← Back
Primarily 2 family with 1 store or office
71-59 AUSTIN STREET
QUEENS · BIN 4078011
💬 Discuss this project
1930Year Built
2Stories
S2Building Class
C4-4AZoning
1,920 sfGross Floor Area
3Units
13 Open Violations ▸
Primarily 2 family with 1 store or office · Owner of record: 71-59 AUSTIN INC · 1,630 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 14p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
158 MANAGEMENT1607/08/2026
CYRUS403/21/2026
SARANG 94103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KORMAN DESIGN & BUILD111/09/2021
HC ARCHITECT, PC510/07/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HANOK503/21/2026
KENNY LEE ARCHITECT103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
C PLUS DESIGN GROUP INCGeneral Contractor207/08/2026
HD HVAC OF NY INCGeneral Contractor107/08/2026
I DO PLUMBING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BEYOND ARCH LLC3600109/23/2021
Building Lifecycle
All (65)Filed (6)Permit Issued (4)Signed Off (4)Violation (38)Inspection (2)Special Inspection (11)
05/15/2026
Violation issued (HPD, closed)
B
05/15/2026
Violation issued (HPD, closed)
A
01/30/2026
Violation issued (HPD, open)
B
01/30/2026
Violation issued (HPD, closed)
B
01/30/2026
Violation issued (HPD, closed)
B
01/30/2026
Violation issued (HPD, closed)
B
01/30/2026
Violation issued (HPD, closed)
B
01/30/2026
Violation issued (HPD, closed)
C
01/30/2026
Violation issued (HPD, closed)
B
01/30/2026
Violation issued (HPD, closed)
C
01/30/2026
Violation issued (HPD, closed)
C
01/30/2026
Violation issued (HPD, closed)
C
01/30/2026
Violation issued (HPD, closed)
C
01/30/2026
Violation issued (HPD, closed)
C
01/30/2026
Violation issued (HPD, closed)
A
01/30/2026
Violation issued (HPD, closed)
C
01/30/2026
Violation issued (HPD, open)
C
11/25/2025
Violation issued (HPD, closed)
I
12/04/2024
Violation issued (HPD, closed)
I
03/03/2022
Violation issued (HPD, closed)
A
03/03/2022
Violation issued (HPD, closed)
A
03/03/2022
Violation issued (HPD, closed)
B
12/10/2021
Signed off — Alteration
install temporary plywood construction fence.
Q00590077-I1
12/10/2021
Signed off — Alteration
INSTALLATION OF COMMERCIAL KITCHEN EXHAUST HOOD (TYPE I) IN RESTAURANT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00595637-I1
12/10/2021
Signed off — Alteration
Replace and new plumbing fixtures. No proposed gas work.
Q00585423-I1
12/10/2021
Signed off — Alteration
INTERIOR RENOVATION OF RESTAURANT. REPLACE STOREFRONT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00585420-I1
11/09/2021
Filed — Alteration
INSTALLATION OF NON-FLASHING DIRECT ILLUMINATED BUSINESS ACCESSORY SIGN ON FRONT FACADE AT 1ST FLOOR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00621008-I1
11/08/2021
Special inspection requirement — Final
DAVID UH
11/08/2021
Special inspection requirement — Exterior lighting power
DAVID UH
11/08/2021
Special inspection requirement — Lighting controls
DAVID UH
11/03/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/15/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/07/2021
Filed — Alteration
Replace and new plumbing fixtures. No proposed gas work.
Q00585423-P1
10/04/2021
Permit issued — Mechanical Systems
Q00595637-I1-MS
09/28/2021
Permit issued — General Construction
Q00585420-I1-GC
09/28/2021
Permit issued — Construction Fence
Q00590077-I1-FN
09/28/2021
Permit issued — Plumbing
Q00585423-I1-PL
09/23/2021
Filed — Alteration
INSTALLATION OF COMMERCIAL KITCHEN EXHAUST HOOD (TYPE I) IN RESTAURANT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00595637-I1
09/20/2021
Filed — Alteration
install temporary plywood construction fence.
Q00590077-I1
09/20/2021
Filed — Alteration
Replace and new plumbing fixtures. No proposed gas work.
Q00585423-I1
09/20/2021
Filed — Alteration
INTERIOR RENOVATION OF RESTAURANT. REPLACE STOREFRONT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00585420-I1
09/16/2021
Special inspection requirement — Final
Hackjong Choi
09/16/2021
Special inspection requirement — Mechanical Systems
Hackjong Choi
09/14/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Hackjong Choi
09/14/2021
Special inspection requirement — Energy Code Compliance Inspections
Hackjong Choi
09/14/2021
Special inspection requirement — Fire-Resistance Rated Construction
Hackjong Choi
09/14/2021
Special inspection requirement — Fenestration areas
Hackjong Choi
09/14/2021
Special inspection requirement — Fenestration air leakage
Hackjong Choi
09/08/2021
Special inspection requirement — Final
Hackjong Choi
10/06/2020
Violation issued (HPD, closed)
C
10/06/2020
Violation issued (HPD, closed)
B
07/14/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/23/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/19/2003
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHD HVAC OF NY INC10/04/2021
DOB NOWGeneral ConstructionSigned-offC PLUS DESIGN GROUP INC09/28/2021
DOB NOWConstruction FenceSigned-offC PLUS DESIGN GROUP INC09/28/2021
DOB NOWPlumbingSigned-offI DO PLUMBING & HTG INC09/28/2021
BISMHISSUEDSTURGES CONSTRUCTION06/16/2003
BISOTISSUEDSTURGES CONSTRUCTION06/16/2003
2 projects · most recent 12/06/2021
General Wiring
FiledStatusContractorScope
12/06/2021CompleteJONG HYUN KIM—
10/01/2021CompleteASKO ELEC CONST & MAIN INGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/03/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
11/08/2021FinalDAVID UHprogress
11/08/2021Exterior lighting powerDAVID UHenergy_progress
11/08/2021Lighting controlsDAVID UHenergy_progress
09/16/2021FinalHackjong Choiprogress
09/16/2021Mechanical SystemsHackjong Choispecial
09/14/2021Fenestration and door U-factor and product ratingsHackjong Choienergy_progress
09/14/2021Energy Code Compliance InspectionsHackjong Choiprogress
09/14/2021Fire-Resistance Rated ConstructionHackjong Choiprogress
09/14/2021Fenestration areasHackjong Choienergy_progress
09/14/2021Fenestration air leakageHackjong Choienergy_progress
09/08/2021FinalHackjong Choiprogress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00590077-I1Request digital key ↗
08/27/2026Q00585420-I1Request digital key ↗
08/27/2026Q00595637-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00585420-I1Open ↗
08/27/2026Q00585423-I1Open ↗
08/27/2026Q00621008-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q00621008-I1Open ↗
09/01/2026Q00621008-I1Open ↗
08/27/2026Q00595637-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q00595637-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00585420-I1Open ↗
08/27/2026Q00585423-I1Open ↗
08/27/2026Q00621008-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00585420-I1Open ↗