← Back
Two stories - detached, small or mid-size
71-71 DOUGLASTON PARKWAY
QUEENS · Douglaston-Little Neck · BIN 4430372
💬 Discuss this project
1989Year Built
2Stories
A1Building Class
R2AZoning
1,600 sfGross Floor Area
1Units
8 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,950 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC103/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272103/13/2025
Building Lifecycle
All (23)Filed (1)Permit Issued (1)Signed Off (1)Violation (15)Special Inspection (5)
12/12/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01193914-I1
11/25/2025
Violation issued (HPD, open)
I
03/20/2025
Permit issued — Solar
Q01193914-I1-SL
03/13/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01193914-I1
03/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
03/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/12/2025
Special inspection requirement — Final
Walid Abdulla
03/12/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
12/04/2024
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, open)
I
11/18/2022
Violation issued (HPD, open)
I
03/17/2022
Violation issued (HPD, open)
I
04/22/2021
Violation issued (HPD, open)
I
11/07/2019
Violation issued (HPD, open)
I
01/09/2018
Violation issued (HPD, open)
I
04/13/2010
Violation issued (HPD, closed)
C
04/13/2010
Violation issued (HPD, closed)
A
04/13/2010
Violation issued (HPD, closed)
B
04/13/2010
Violation issued (HPD, closed)
B
04/13/2010
Violation issued (HPD, closed)
C
04/13/2010
Violation issued (HPD, closed)
B
05/07/1990
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC03/20/2025
BISPLISSUEDACTION JACK PLG09/20/1990
BIS—ISSUEDHIOS BLDG CORP04/27/1990
1 project · most recent 03/13/2025
General Wiring
FiledStatusContractorScope
03/13/2025CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/12/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/12/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
03/12/2025Energy Code Compliance InspectionsWalid Abdullaprogress
03/12/2025FinalWalid Abdullaprogress
03/12/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01193914-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026Q01193914-I1Open ↗
08/24/2026Q01193914-I1Open ↗
08/24/2026Q01193914-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026Q01193914-I1Open ↗
08/24/2026Q01193914-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01193914-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01193914-I1Open ↗