71 BARTLETT AVENUE
STATEN ISLAND · Great Kills-Eltingville · BIN 5073431
💬 Discuss this project
1965Year Built
2Stories
A5Building Class
R3AZoning
1,096 sfGross Floor Area
1Units
One family attached or semi-detached · 2,500 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Floor 21p · 2 filings · 9 docs
Floor 11p · 2 filings · 9 docs
Cellar3p · 2 filings · 9 docs
Basement2p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP210/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371210/13/2022
Building Lifecycle
All (19)Filed (2)Permit Issued (2)Signed Off (2)Inspection (5)Special Inspection (8)
03/01/2023
Signed off — Alteration
S08020432-I1
02/28/2023
Signed off — Alteration
PROPOSED INSTALL NEW HVAC AND INTERIOR RENOVATION OF CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. INSTALL FLOORING, CEILING AND PAINTING THROUGHOUT, CONSTRUCTION AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S08018408-I1
02/27/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/30/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/14/2022
Permit issued — Plumbing
S08020432-I1-PL
10/13/2022
Filed — Alteration
S08020432-I1
10/13/2022
Permit issued — General Construction
S08018408-I1-GC-CX
10/11/2022
Filed — Alteration
PROPOSED INSTALL NEW HVAC AND INTERIOR RENOVATION OF CELLAR, 1ST AND 2ND FLOOR OF EXISTING 2 STORY BUILDING. INSTALL FLOORING, CEILING AND PAINTING THROUGHOUT, CONSTRUCTION AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
S08018408-I1
10/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
10/11/2022
Special inspection requirement — Insulation placement and R values
Eric Sun
10/11/2022
Special inspection requirement — Air barrier - visual inspection
Eric Sun
10/11/2022
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
10/11/2022
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
10/11/2022
Special inspection requirement — Interior lighting power
Eric Sun
10/10/2022
Special inspection requirement — Mechanical Systems
Eric Sun
10/10/2022
Special inspection requirement — Final
Eric Sun
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC10/14/2022
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY10/13/2022
1 project · most recent 10/28/2022
General Wiring
FiledStatusContractorScope
10/28/2022CompleteJ Y ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/30/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
10/11/2022Fire-Resistant Penetrations and JointsEric Sunspecial
10/11/2022Insulation placement and R valuesEric Sunenergy_progress
10/11/2022Air barrier - visual inspectionEric Sunenergy_progress
10/11/2022Energy Code Compliance InspectionsEric Sunprogress
10/11/2022Fire-Resistance Rated ConstructionEric Sunprogress
10/11/2022Interior lighting powerEric Sunenergy_progress
10/10/2022Mechanical SystemsEric Sunspecial
10/10/2022FinalEric Sunprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026S08018408-I1Request digital key ↗
08/23/2026S08020432-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026S08018408-I1Open ↗
08/23/2026S08020432-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026S08018408-I1Open ↗
08/23/2026S08018408-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026S08018408-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026S08018408-I1Open ↗
08/23/2026S08020432-I1Open ↗