2 Open Violations 1 unresolved · 1 paperwork only▸
DOB01/15/2014FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB05/13/2013WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS IN THAT ALTERATION #500106761 FILED FOR LEGALIZE ONE STORY ADDITION AT REAR OF BUILDING.3RD STORY WAS CONSTRUCTED AND ADDED TO EXISTING BUILDING W/O APPRNothing owed — awaiting certificate of correction
Two family frame · 0.71 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.