← Back
Zoned commercial or Manhattan residential
426 WYONA STREET
BROOKLYN · BIN 3429293
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R6Zoning
0 sfGross Floor Area
0Units
1 Open Violation ▸FDNY Report ↗
Zoned commercial or Manhattan residential · Owner of record: HP NEW PENN HOUSING DEVELOPMENT FUND COM PANY, INC · 4,000 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction41p · 3 filings · 20 docs
Floor 4Under Construction38p · 3 filings · 20 docs
Floor 3Under Construction36p · 3 filings · 20 docs
Floor 2Under Construction38p · 3 filings · 20 docs
Floor 1Under Construction39p · 3 filings · 20 docs
CellarUnder Construction26p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW PENN DEVELOPMENT HDFC1308/31/2026
TECHOCRAFT INC703/22/2026
HPD103/21/2026
HP NEW PENN HOUSING DEVELOPMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P. M. ARCHITECTURE, PC606/02/2026
R AND O ENGINEERING. P.C.412/09/2025
JOEL PHAGOO P.E. PLLC309/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC1803/21/2026
A1 EXPEDITING SERVICE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TECHNOCRAFT INCGeneral Contractor507/08/2026
NATIONWIDE MECHANICAL INCPlumbing507/08/2026
AKM CONSTRUCTION NY CORPGeneral Contractor204/09/2026
ALEXANDER EUGENEElectrical103/21/2026
VITO INGRAVALLOElectrical103/21/2026
C. JAMES PLBG & HTG INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PRUDIGM ENGINEERING LLCU4304806/02/2026
STRUCTURES & FOUNDATIONS7714105/08/2025
Building Lifecycle
All (133)Filed (13)Permit Issued (11)Signed Off (4)Violation (9)Inspection (4)Objection (62)Special Inspection (30)
06/23/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/10/2026
Special inspection requirement — Shutoff dampers
PARAG MEHTA
06/10/2026
Special inspection requirement — Duct leakage testing, insulation and design
PARAG MEHTA
06/10/2026
Special inspection requirement — Mechanical Systems
Naeem Anwar
06/10/2026
Special inspection requirement — Energy Code Compliance Inspections
PARAG MEHTA
06/10/2026
Special inspection requirement — HVAC-R and service water heating system controls
PARAG MEHTA
06/10/2026
Special inspection requirement — Final
PARAG MEHTA
06/10/2026
Special inspection requirement — HVAC-R and service water heating equipment
PARAG MEHTA
06/09/2026
Permit issued — Plumbing
B00609840-I1-PL
06/09/2026
Objection resolved — Addressed
06/08/2026
Objection raised — Cost
06/02/2026
Filed — Alteration
New mechanical work with ERV units for intake and exhaust and new heat pump for heating and cooling in conjunction with NB filing 321598945
B00611445-P2
05/15/2026
Signed off — Alteration
Reinforced concrete and steel structure for new building
B00614808-I1
04/29/2026
Special inspection requirement — Structural Steel - Welding
Naeem Anwar
04/29/2026
Special inspection requirement — Final
Naeem Anwar
04/29/2026
Special inspection requirement — Structural Steel - Details
Naeem Anwar
04/29/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Naeem Anwar
04/29/2026
Special inspection requirement — Structural Cold-Formed Steel
Naeem Anwar
03/19/2026
Permit issued — Mechanical Systems
B00611445-I1-MS
03/18/2026
Violation issued (ECB, open)
Construction
03/06/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228789-I1
03/06/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228789-S1
02/09/2026
Objection resolved — Addressed
02/04/2026
Objection raised — Other
02/01/2026
Violation issued (ECB, closed)
Unknown
01/12/2026
Permit issued — Plumbing
B00609840-I1-EW-SP
12/26/2025
Objection resolved — Addressed
12/25/2025
Objection raised — Other
12/24/2025
Permit issued — Construction Fence
B01135573-I1-FN
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/09/2025
Filed — Alteration
Reinforced concrete and steel structure for new building
B00614808-P3
11/12/2025
Special inspection requirement — Structural Steel - Details
Naeem Anwar
11/12/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Naeem Anwar
11/12/2025
Special inspection requirement — Structural Steel - Welding
Naeem Anwar
11/12/2025
Special inspection requirement — Final
Naeem Anwar
11/12/2025
Special inspection requirement — Structural Cold-Formed Steel
Naeem Anwar
09/25/2025
Permit issued — Supported Scaffold
B01228789-S1-SF
09/24/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228789-S1
09/24/2025
Violation issued (ECB, closed)
Unknown
09/24/2025
Violation issued (ECB, closed)
Construction
09/24/2025
Violation issued (ECB, closed)
Construction
09/24/2025
Violation issued (ECB, closed)
Site Safety
09/24/2025
Violation issued (ECB, closed)
Unknown
09/24/2025
Violation issued (ECB, closed)
Unknown
09/15/2025
Signed off — Alteration
Foundation and Earthwork in conjunction to NB filing 321598945
B00615057-I1
07/28/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228789-P1
07/28/2025
Permit issued — Plumbing
B00609840-I1-PL
06/18/2025
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01228789-I1
06/18/2025
Permit issued — Sidewalk Shed
B01228789-I1-SH
05/21/2025
Special inspection requirement — Protection of exposed foundation insulation
PARAG MEHTA
05/21/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Naeem Anwar
05/21/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Naeem Anwar
05/21/2025
Special inspection requirement — Subgrade Inspections
Naeem Anwar
05/21/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Naeem Anwar
05/21/2025
Special inspection requirement — Concrete - Cast-In-Place
Naeem Anwar
05/21/2025
Special inspection requirement — Final
Naeem Anwar
05/21/2025
Special inspection requirement — Footing and Foundation
Naeem Anwar
05/21/2025
Special inspection requirement — Insulation placement and R values
PARAG MEHTA
05/09/2025
Violation issued (ECB, closed)
Construction
05/09/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
Latest 60 of 133 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedNATIONWIDE MECHANICAL INC06/09/2026
DOB NOWMechanical SystemsPermit IssuedTECHNOCRAFT INC03/19/2026
DOB NOWPlumbingPermit IssuedC. JAMES PLBG & HTG INC01/12/2026
DOB NOWConstruction FencePermit IssuedTECHNOCRAFT INC12/24/2025
DOB NOWSupported ScaffoldSigned-offAKM CONSTRUCTION NY09/25/2025
DOB NOWPlumbingPermit IssuedNATIONWIDE MECHANICAL INC07/28/2025
DOB NOWSidewalk ShedSigned-offAKM CONSTRUCTION NY06/18/2025
DOB NOWPlumbingPermit IssuedNATIONWIDE MECHANICAL INC04/10/2025
DOB NOWEarth WorkSigned-offTECHNOCRAFT INC01/08/2025
DOB NOWStructuralPermit IssuedTECHNOCRAFT INC01/08/2025
DOB NOWConstruction FencePermit IssuedTECHNOCRAFT INC01/03/2025
BIS—ISSUEDTECHNOCRAFT INC12/22/2025
BIS—ISSUEDTECHNOCRAFT INC01/14/2025
1 project · most recent 06/02/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/02/2026Permit IssuedTECHNOCRAFT INCAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Ice Air RSXC09 10,300 BTU ×46
Ephoca HPAC 2.0 10,500 BTU ×23
Heat / Cool
Cadet CSC101TW 1 kW · Electric Heater ×8
Ventilation
Ventacity Ventacity VS1000 RTe 1,060 CFM · Erv ×6
3 projects · most recent 04/03/2026
General Wiring
FiledStatusContractorScope
04/03/2026Permit IssuedL J ELEC'L SERV. INC.—
09/12/2025Permit IssuedGALAXY ELECTRIC CORPGeneral Wiring
06/04/2025CompleteHIGH QUALITY ELEC.OF NYC—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/23/2026Pass-Final PL - UndergroundPassView ↗
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/09/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
06/10/2026Shutoff dampersPARAG MEHTAenergy_progress
06/10/2026Duct leakage testing, insulation and designPARAG MEHTAenergy_progress
06/10/2026Mechanical SystemsNaeem Anwarspecial
06/10/2026Energy Code Compliance InspectionsPARAG MEHTAprogress
06/10/2026HVAC-R and service water heating system controlsPARAG MEHTAenergy_progress
06/10/2026FinalPARAG MEHTAprogress
06/10/2026HVAC-R and service water heating equipmentPARAG MEHTAenergy_progress
04/29/2026Structural Steel - WeldingNaeem Anwarspecial
04/29/2026FinalNaeem Anwarprogress
04/29/2026Structural Steel - DetailsNaeem Anwarspecial
04/29/2026Structural Steel - High Strength BoltingNaeem Anwarspecial
04/29/2026Structural Cold-Formed SteelNaeem Anwarspecial
11/12/2025Structural Steel - DetailsNaeem Anwarspecial
11/12/2025Structural Steel - High Strength BoltingNaeem Anwarspecial
11/12/2025Structural Steel - WeldingNaeem Anwarspecial
11/12/2025FinalNaeem Anwarprogress
11/12/2025Structural Cold-Formed SteelNaeem Anwarspecial
05/21/2025Protection of exposed foundation insulationPARAG MEHTAenergy_progress
05/21/2025Subsurface Investigations (Borings/Test Pits)Naeem Anwarspecial
05/21/2025Excavations - Sheeting, Shoring, and BracingNaeem Anwarspecial
05/21/2025Subgrade InspectionsNaeem Anwarspecial
05/21/2025Subsurface Conditions – Fill Placement & In-Place DensityNaeem Anwarspecial
05/21/2025Concrete - Cast-In-PlaceNaeem Anwarspecial
05/21/2025FinalNaeem Anwarprogress
05/21/2025Footing and FoundationNaeem Anwarprogress
Latest 25 of 50.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/30/2026B00615057-P2Request digital key ↗
08/23/2026B01135573-I1Request digital key ↗
08/21/2026B00609840-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
07/27/2022340829580Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/16/2008310198666Open ↗
▸Seals & Professional Certifications51
▸DOB NOWSpecial Inspector Seal & Signature22
09/02/2026B00611445-I1Open ↗
08/30/2026B00615057-I1Open ↗
08/30/2026B00615057-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/02/2026B00611445-I1Open ↗
09/02/2026B00611445-I1Open ↗
08/30/2026B00615057-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/25/2026B00611445-P2Open ↗
08/23/2026B01135573-I1Open ↗
08/21/2026B01228789-P1Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/27/2022340829580Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/16/2008310198666Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
09/16/2008310198666Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
07/27/2022340829580Open ↗
09/16/2008310198666Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/27/2022340829580Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026B00615057-P2Open ↗
08/13/2026B00615057-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00615057-I1Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter13
08/19/2026B00614808-P3Open ↗
08/15/2026B00611445-P2Open ↗
08/14/2026B00614808-I1Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
09/16/2008310198666Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
07/27/2022340829580Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/16/2008310198666Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00615057-I1Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
07/27/2022340829580Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/27/2022340829580Open ↗
▸BISEFILING COVER SHEET1
09/16/2008310198666Open ↗
▸Other Documents5
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
07/27/2022340829580Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
07/27/2022340829580Open ↗
▸BISPLOT DIAGRAM1
09/16/2008310198666Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/27/2022340829580Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00615057-I1Open ↗