← Back
BuildNYC
BROOKLYN
710 BROADWAY
BROOKLYN · BIN 3430147
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMcDonald's USAUnder Construction12p · 1 filing · 5 docs
Floor 2McDonald's USAUnder Construction11p · 1 filing · 5 docs
Floor 1McDonald's USA, Unit 1BUnder Construction11p · 5 filings · 20 docs
CellarMcDonald's USA2 filings · 6 docs
Site & exteriorInstallation of temporary construction fenceUnder Construction2p · 1 filing · 2 docs
Filed — no permit issuedSignage installation for drive-thru establishment13p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
McDonalds603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bohler Engineering NY1107/31/2026
AECOM USA303/05/2026
AECOM Technical Services203/11/2025
AECOM308/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ggonzalez Bohlereng Company3003/21/2026
Bohler Engineering103/21/2026
Sol Building Consulting Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Full Service ContractingGeneral Contractor107/08/2026
Full Service ContractingScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Whitestone Associates Engineering81441107/24/2026
Building Lifecycle
All (129)Filed (19)Permit Issued (2)Objection (78)Special Inspection (30)
08/11/2026
Objection raised — Other
08/11/2026
Objection raised — Other
08/04/2026
Special inspection requirement — Maintenance information
Mudar Khantamr
07/31/2026
Filed — Alteration
Filing herewith for the proposed installation of illuminated non-flashing signage. Filed in conjunction with NB B00837185-I1
B00835963-P1
07/31/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Mudar Khantamr
07/31/2026
Special inspection requirement — Subgrade Inspections
Mudar Khantamr
07/31/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Mudar Khantamr
07/31/2026
Special inspection requirement — Footing and Foundation
Mudar Khantamr
07/31/2026
Special inspection requirement — Concrete - Cast-In-Place
Mudar Khantamr
07/31/2026
Special inspection requirement — Final
Mudar Khantamr
07/24/2026
Filed — Alteration
This application is filed for the pylon sign foundation for the associated McDonald's.
B00836525-P1
06/29/2026
Special inspection requirement — Protection of exposed foundation insulation
Mudar Khantamr
06/29/2026
Special inspection requirement — Vestibules
Mudar Khantamr
06/29/2026
Special inspection requirement — Metering
Mudar Khantamr
06/29/2026
Special inspection requirement — Exterior lighting power
Mudar Khantamr
06/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Mudar Khantamr
06/17/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Mudar Khantamr
06/17/2026
Special inspection requirement — Concrete - Cast-In-Place
Mudar Khantamr
06/17/2026
Special inspection requirement — Footing and Foundation
Mudar Khantamr
06/17/2026
Special inspection requirement — Subgrade Inspections
Mudar Khantamr
06/17/2026
Special inspection requirement — Final
Mudar Khantamr
06/12/2026
Permit issued — Mechanical Systems
B00890222-I1-MS
06/12/2026
Permit issued — Construction Fence
B00902733-I1-FN
06/03/2026
Objection resolved — Addressed
06/03/2026
Objection resolved — Addressed
05/22/2026
Objection raised — Admin
05/22/2026
Objection raised — Fire_Protection
05/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Mudar Khantamr
04/29/2026
Objection resolved — Addressed
04/29/2026
Objection resolved — Open
04/29/2026
Objection resolved — Open
04/29/2026
Objection resolved — Addressed
04/29/2026
Objection resolved — Addressed
04/29/2026
Objection resolved — Addressed
04/29/2026
Objection resolved — Open
04/29/2026
Objection resolved — Addressed
04/29/2026
Objection resolved — Addressed
04/29/2026
Objection resolved — Addressed
04/29/2026
Objection resolved — Open
04/29/2026
Objection resolved — Open
04/29/2026
Objection resolved — Addressed
04/16/2026
Special inspection requirement — Fenestration air leakage
Mudar Khantamr
04/16/2026
Special inspection requirement — Air barrier - visual inspection
Mudar Khantamr
04/16/2026
Special inspection requirement — Fenestration areas
Mudar Khantamr
04/16/2026
Special inspection requirement — Insulation placement and R values
Mudar Khantamr
04/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Mudar Khantamr
04/09/2026
Objection resolved — Resolved
04/09/2026
Objection resolved — Resolved
04/09/2026
Special inspection requirement — Fenestration areas
Mudar Khantamr
04/09/2026
Special inspection requirement — Insulation placement and R values
Mudar Khantamr
04/09/2026
Special inspection requirement — Fenestration air leakage
Mudar Khantamr
04/09/2026
Special inspection requirement — Air barrier - visual inspection
Mudar Khantamr
04/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Mudar Khantamr
04/01/2026
Objection resolved — Resolved
04/01/2026
Objection resolved — Resolved
04/01/2026
Objection resolved — Resolved
04/01/2026
Objection resolved — Resolved
04/01/2026
Objection resolved — Resolved
04/01/2026
Objection resolved — Resolved
04/01/2026
Objection resolved — Resolved
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedFull Service Contracting06/12/2026
DOB NOWConstruction FencePermit IssuedFull Service Contracting06/12/2026
1 project · most recent 08/07/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/07/2023Permit IssuedFull Service ContractingHeating and Air Conditioning Systems
Heat / Cool
Lennox LCT156H5M 154,600 BTU · Rooftop Unit ×1
LCT210H5M 219,800 BTU · Rooftop Unit ×1
LCT60H5E 65,600 BTU · Rooftop Unit ×1
1 project · most recent 08/07/2023
FiledStatusContractorScope
08/07/2023——72 heads
1 project · most recent 08/07/2023
Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
08/07/2023——Plumbing-Sprinkler, Storm, Water/Sanitary
4 projects · most recent 07/24/2026
Concrete Masonry Steel
FiledStatusContractorScope
07/24/2026——2 scope_items
03/05/2026——Concrete, Masonry
08/11/2023——Steel, Concrete
08/10/2023——1 scope_items
1 project · most recent 07/11/2023
Fence
FiledStatusContractorScope
07/11/2023Permit IssuedFull Service ContractingFence
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
08/04/2026Maintenance informationMudar Khantamrenergy_progress
07/31/2026Footing and FoundationMudar Khantamrprogress
07/31/2026Subsurface Investigations (Borings/Test Pits)Mudar Khantamrspecial
07/31/2026Concrete - Cast-In-PlaceMudar Khantamrspecial
07/31/2026Subgrade InspectionsMudar Khantamrspecial
07/31/2026FinalMudar Khantamrprogress
07/31/2026Structural Steel - High Strength BoltingMudar Khantamrspecial
06/29/2026Protection of exposed foundation insulationMudar Khantamrenergy_progress
06/29/2026Exterior lighting powerMudar Khantamrenergy_progress
06/29/2026VestibulesMudar Khantamrenergy_progress
06/29/2026MeteringMudar Khantamrenergy_progress
06/17/2026Subgrade InspectionsMudar Khantamrspecial
06/17/2026FinalMudar Khantamrprogress
06/17/2026Footing and FoundationMudar Khantamrprogress
06/17/2026Concrete - Cast-In-PlaceMudar Khantamrspecial
06/17/2026Structural Steel - High Strength BoltingMudar Khantamrspecial
06/17/2026Subsurface Investigations (Borings/Test Pits)Mudar Khantamrspecial
05/21/2026Energy Code Compliance InspectionsMudar Khantamrprogress
04/16/2026Fenestration and door U-factor and product ratingsMudar Khantamrenergy_progress
04/16/2026Insulation placement and R valuesMudar Khantamrenergy_progress
04/16/2026Fenestration areasMudar Khantamrenergy_progress
04/16/2026Fenestration air leakageMudar Khantamrenergy_progress
04/16/2026Air barrier - visual inspectionMudar Khantamrenergy_progress
04/09/2026Fenestration air leakageMudar Khantamrenergy_progress
04/09/2026Air barrier - visual inspectionMudar Khantamrenergy_progress
Latest 25 of 82.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
McDonald's USARestaurant / Food ServiceCellar, Floors 1, 2, Roof
Project B00894481 Alteration · Filing Withdrawn · 08/11/2023
Project B00894497 Alteration · Filing Withdrawn · 08/10/2023
Project B00894542 No Work · Filing Withdrawn · 08/08/2023
Project B00890222 Alteration · Permit Entire · 08/07/2023
Project B00890228 Alteration · Approved · 08/07/2023
Project B00894531 Alteration · Filing Withdrawn · 08/07/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch18
08/27/2026B00831907-I1Request digital key ↗
08/27/2026B00831902-I1Request digital key ↗
08/27/2026B00835963-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/27/2026B00894542-I1Request digital key ↗
▸Applications & Permits8
▸DOB NOWDEP Stormwater Construction Permit6
08/18/2026B01190685-S2Open ↗
08/18/2026B01190685-I1Open ↗
08/14/2026B01190685-S1Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
07/10/2025340885812Open ↗
03/14/2025340885812Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01190685-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01190685-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01190685-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/27/2026B00831907-I1Open ↗
08/27/2026B00835963-I1Open ↗
08/27/2026B00835963-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026B00836525-I1Open ↗
09/01/2026B01190685-S2Open ↗
09/01/2026B00835963-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B00836525-I1Open ↗
09/01/2026B01190685-S2Open ↗
09/01/2026B01190685-I1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B01190685-S1Open ↗
08/13/2026B01190685-S2Open ↗
08/13/2026B01190685-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan3
08/13/2026B01190685-S2Open ↗
08/13/2026B01190685-I1Open ↗
08/13/2026B01190685-S1Open ↗
▸DOB NOWStreet Tree Checklist3
08/13/2026B01190685-S2Open ↗
08/13/2026B01190685-S1Open ↗
08/13/2026B01190685-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT4
08/27/2026B00836525-P1Open ↗
08/13/2026B00831877-I1Open ↗
08/13/2026B01325090-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/19/2026B01325090-I1Open ↗
08/15/2026B00836525-I1Open ↗
▸DOB NOWHydrant Flow Test Letter1
08/14/2026B00894531-I1Open ↗
▸Other Documents13
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/18/2026B01190685-I1Open ↗
08/18/2026B01190685-S2Open ↗
08/14/2026B01190685-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSite Survey: Initial3
08/13/2026B01190685-S2Open ↗
08/13/2026B01190685-I1Open ↗
08/13/2026B01190685-S1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
02/13/2026340885812Open ↗
▸DOB NOWHydraulic Calculations1
08/13/2026B00894531-I1Open ↗
▸DOB NOWGeotechnical Peer Review Report (BC 1818)1
08/13/2026B00894481-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/18/2026B01190685-I1Open ↗