Three families
710 LEXINGTON AVENUE
BROOKLYN · Bedford-Stuyvesant (East) · BIN 3044321
💬 Discuss this project
1905Year Built
2Stories
C0Building Class
R6BZoning
1,912 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · 1,875 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 25p · 2 filings · 14 docs
Floor 16p · 2 filings · 14 docs
Cellar7p · 2 filings · 14 docs
Site & exterior4p · 2 filings · 14 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/29/2025$1.0M—Private party → Private party$533/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI611/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HAPPY HOUSE CONSTRUCTIONGeneral Contractor303/21/2026
JOHN FITZGERALD PLBG &HTGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394310/30/2025
Building Lifecycle
All (31)Filed (6)Permit Issued (3)Signed Off (2)Violation (10)Inspection (5)Special Inspection (5)
01/21/2026
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:CAP & REMOVE EXISTING (1)BOILER AND H.W.H. IN CELLAR; RELOCATE KITCHEN ANDBATHROOM FIXTURES; NEW YARD DRAIN AT REAR YARD. NO CHANGE IN USE, EGRESSOR OCCUPANCY UNDER THIS APPLICATION.
B01220143-I1
12/09/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERALCONSTRUCTION AND MECHANICAL SYSTEM AS PER PLAN: NEW PARTITIONS, DOORS,FLOORING AND COSMETIC WORK; REPLACE CONRETE STAIR AT REAR YARD. INSTALLNEW AC CONDENSER SYSTEM. NO CHANGE IN USE, EGRES
B01223032-I1
12/08/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/24/2025
Permit issued — Plumbing
B01220143-I1-PL
11/20/2025
Violation issued (HPD, closed)
I
11/10/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:CAP & REMOVE EXISTING (1)BOILER AND H.W.H. IN CELLAR; RELOCATE KITCHEN ANDBATHROOM FIXTURES; NEW YARD DRAIN AT REAR YARD. NO CHANGE IN USE, EGRESSOR OCCUPANCY UNDER THIS APPLICATION.
B01220143-P2
11/07/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
10/31/2025
Special inspection requirement — Mechanical Systems
FARHAD BASSIRI-TEHRANI
10/31/2025
Special inspection requirement — Final
FARHAD BASSIRI-TEHRANI
10/31/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
10/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
10/30/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERALCONSTRUCTION AND MECHANICAL SYSTEM AS PER PLAN: NEW PARTITIONS, DOORS,FLOORING AND COSMETIC WORK; REPLACE CONRETE STAIR AT REAR YARD. INSTALLNEW AC CONDENSER SYSTEM. NO CHANGE IN USE, EGRES
B01223032-P2
10/28/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/22/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERALCONSTRUCTION AND MECHANICAL SYSTEM AS PER PLAN: NEW PARTITIONS, DOORS,FLOORING AND COSMETIC WORK; REPLACE CONRETE STAIR AT REAR YARD. INSTALLNEW AC CONDENSER SYSTEM. NO CHANGE IN USE, EGRES
B01223032-P1
10/22/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:CAP & REMOVE EXISTING (1)BOILER AND H.W.H. IN CELLAR; RELOCATE KITCHEN ANDBATHROOM FIXTURES; NEW YARD DRAIN AT REAR YARD. NO CHANGE IN USE, EGRESSOR OCCUPANCY UNDER THIS APPLICATION.
B01220143-P1
07/07/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/07/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/19/2025
Permit issued — Plumbing
B01220143-I1-PL
05/13/2025
Permit issued — Mechanical Systems
B01223032-I1-GC-CX
05/09/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:CAP & REMOVE EXISTING (1)BOILER AND H.W.H. IN CELLAR; RELOCATE KITCHEN ANDBATHROOM FIXTURES; NEW YARD DRAIN AT REAR YARD. NO CHANGE IN USE, EGRESSOR OCCUPANCY UNDER THIS APPLICATION.
B01220143-I1
05/09/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERALCONSTRUCTION AND MECHANICAL SYSTEM AS PER PLAN: NEW PARTITIONS, DOORS,FLOORING AND COSMETIC WORK; REPLACE CONRETE STAIR AT REAR YARD. INSTALLNEW AC CONDENSER SYSTEM. NO CHANGE IN USE, EGRES
B01223032-I1
04/10/2024
Violation issued (HPD, closed)
A
11/21/2023
Violation issued (HPD, closed)
I
03/23/2023
Violation issued (HPD, closed)
A
11/10/2022
Violation issued (HPD, closed)
I
02/25/2022
Violation issued (HPD, closed)
I
02/25/2022
Violation issued (HPD, closed)
A
04/09/2021
Violation issued (HPD, closed)
A
10/30/2019
Violation issued (HPD, closed)
I
11/10/2016
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG11/24/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG05/19/2025
DOB NOWMechanical SystemsSigned-offHAPPY HOUSE CONSTRUCTION05/13/2025
1 project · most recent 06/06/2025
General Wiring
FiledStatusContractorScope
06/06/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/08/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
10/28/2025Fail-Final General Construction Non-Directive 14FailView ↗
07/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/07/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/31/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
10/31/2025Mechanical SystemsFARHAD BASSIRI-TEHRANIspecial
10/31/2025FinalFARHAD BASSIRI-TEHRANIprogress
10/31/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/31/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026B01220143-P1Request digital key ↗
08/21/2026B01220143-I1Request digital key ↗
08/21/2026B01220143-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026B01220143-I1Open ↗
08/21/2026B01220143-P2Open ↗
08/21/2026B01220143-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026B01223032-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B01223032-I1Open ↗