1930Year Built
2Stories
A5Building Class
R5Zoning
1,264 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,000 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
StructuralMechanical
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/08/2024$1.1M—Private party → Private party$902/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NA210/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILD TEAM403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIMROSE SERVICE INCGeneral Contractor303/21/2026
GOODALL ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HSU & ASSOCIATES8025105/12/2023
Building Lifecycle
All (37)Filed (2)Permit Issued (1)Signed Off (1)Violation (1)Inspection (3)Objection (14)Special Inspection (15)
11/06/2023
Signed off — Alteration
amend the as-built plan for construction inspection objections
B00867402-I1
11/02/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/17/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/11/2023
Filed — Alteration
amend the as-built plan for construction inspection objections
B00867402-S1
10/11/2023
Special inspection requirement — Final
Chih Hsu
10/10/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/03/2023
Permit issued — Mechanical Systems
B00867402-I1-GC-CX
05/16/2023
Objection raised — Other
05/16/2023
Objection resolved — Addressed
05/16/2023
Objection raised — Other
05/16/2023
Objection resolved — Addressed
05/16/2023
Objection raised — Zoning
05/16/2023
Objection resolved — Addressed
05/16/2023
Objection raised — Zoning
05/16/2023
Objection resolved — Addressed
05/16/2023
Objection raised — Other
05/16/2023
Objection resolved — Addressed
05/16/2023
Objection raised — Other
05/16/2023
Objection resolved — Addressed
05/16/2023
Objection raised — Zoning
05/16/2023
Objection resolved — Addressed
05/12/2023
Filed — Alteration
amend the as-built plan for construction inspection objections
B00867402-I1
05/11/2023
Special inspection requirement — Wood – Prefabricated I-Joists
Chih Hsu
04/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chih Hsu
04/29/2023
Special inspection requirement — Final
Chih Hsu
04/29/2023
Special inspection requirement — Insulation placement and R values
Chih Hsu
04/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
Chih Hsu
04/29/2023
Special inspection requirement — Air barrier - visual inspection
Chih Hsu
04/29/2023
Special inspection requirement — Interior lighting power
Chih Hsu
04/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
Chih Hsu
04/29/2023
Special inspection requirement — Lighting controls
Chih Hsu
04/29/2023
Special inspection requirement — Fenestration air leakage
Chih Hsu
04/29/2023
Special inspection requirement — Fenestration areas
Chih Hsu
04/29/2023
Special inspection requirement — Lighting in dwelling units
Chih Hsu
04/29/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Chih Hsu
04/29/2023
Special inspection requirement — Mechanical Systems
Chih Hsu
08/20/2004
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPRIMROSE SERVICE INC10/03/2023
1 project · most recent 11/04/2023
FiledStatusContractorScope
11/04/2023CompleteGOODALL ELECTRIC CORP1 meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/02/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/17/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
10/10/2023Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/11/2023FinalChih Hsuprogress
05/11/2023Wood – Prefabricated I-JoistsChih Hsuspecial
04/29/2023Fire-Resistant Penetrations and JointsChih Hsuspecial
04/29/2023FinalChih Hsuprogress
04/29/2023Insulation placement and R valuesChih Hsuenergy_progress
04/29/2023HVAC-R and service water heating equipmentChih Hsuenergy_progress
04/29/2023Air barrier - visual inspectionChih Hsuenergy_progress
04/29/2023Interior lighting powerChih Hsuenergy_progress
04/29/2023HVAC-R and service water heating system controlsChih Hsuenergy_progress
04/29/2023Lighting controlsChih Hsuenergy_progress
04/29/2023Fenestration air leakageChih Hsuenergy_progress
04/29/2023Fenestration areasChih Hsuenergy_progress
04/29/2023Lighting in dwelling unitsChih Hsuenergy_progress
04/29/2023Fenestration and door U-factor and product ratingsChih Hsuenergy_progress
04/29/2023Mechanical SystemsChih Hsuspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026B00867402-S1Request digital key ↗
08/15/2026B00867402-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00867402-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B00867402-I1Open ↗
09/01/2026B00867402-I1Open ↗
09/01/2026B00867402-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00867402-I1Open ↗
09/01/2026B00867402-I1Open ↗
09/01/2026B00867402-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026B00867402-S1Open ↗
08/26/2026B00867402-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026B00867402-S1Open ↗
08/15/2026B00867402-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026B00867402-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00867402-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B00867402-I1Open ↗