| Owner | Filings | Most Recent |
|---|---|---|
| RG | 120 | 09/13/2026 |
| TSQ DEVELOPMENT | 31 | 07/08/2026 |
| CEPRINE CONSTRUCTION | 13 | 07/08/2026 |
| OWNERS REP | 42 | 07/08/2026 |
| CONSTRUCTED | 1 | 07/08/2026 |
| INTERNATIONAL CONCRETE | 3 | 03/22/2026 |
| UPTOWN CONSTRUCTION GROUP | 3 | 03/22/2026 |
| STATE CONTRACTING CORP NY | 2 | 03/22/2026 |
| HALSTEAD MANAGEMENT | 3 | 03/22/2026 |
| SIMMONS TOM 4KEYS | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| GENE KAUFMAN ARCHITECT, PC | 41 | 07/29/2026 |
| OSPINO ENGINEERING PLLC | 1 | 05/18/2026 |
| R SCOTT LEWIS PE PC | 17 | 01/08/2026 |
| PAUL PERDEK, PROF. ENG. PLLC | 23 | 01/06/2026 |
| LEON SKVIRSKY PE | 3 | 12/15/2025 |
| RIGID STRUCTURAL DESIGN, LLC | 1 | 08/30/2024 |
| KN3 ENGINEERING LLC | 4 | 04/18/2024 |
| HOWARD SHAPIRO & ASSOCIATES, P.C. | 1 | 02/26/2024 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 02/05/2024 |
| GEODESIGN INC. PC | 2 | 05/11/2023 |
| WELLWORTH CONSULTING LLC | 1 | 04/11/2023 |
| H & O ENGINEERING, DPC | 6 | 03/30/2023 |
| KZ ENGINEERING, P.C | 2 | 11/23/2021 |
| URBAN INTEGRATIONS | 1 | 08/04/2021 |
| CAPOBIANCO ENGINEERING GROUP, LLP | 1 | 04/27/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| AE DESIGN SOLUTION | 42 | 03/21/2026 |
| BUILDING BROTHERS | 30 | 03/21/2026 |
| GENE KAUFMAN ARCHITECT | 39 | 03/21/2026 |
| RES FIRE | 5 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 6 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 12 | 03/21/2026 |
| SRP DRAFTING AND DESIGN | 2 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 2 | 03/21/2026 |
| Rigid Structural Design, LLC | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| FLINTLOCK CONSTR SERV LLC | General Contractor | 38 | 07/08/2026 |
| CORE SCAFFOLD SYSTEMS INC. | General Contractor | 36 | 07/08/2026 |
| STATE CONTRACTING CORP NY | General Contractor | 19 | 07/08/2026 |
| NORTH SHORE NEON SIGN | Scaffold | 12 | 07/08/2026 |
| CEPRINE CONSTRUCTION INC | General Contractor | 11 | 07/08/2026 |
| DC BUILDING SERVICES INC | Fire Protection | 5 | 08/20/2026 |
| DC BUILDING SERVICES INC | Plumbing | 4 | 07/08/2026 |
| INTERNATIONAL CONCRETE C* | General Contractor | 3 | 03/21/2026 |
| EDGE CONSTRUCTION & CONCRETE | General Contractor | 3 | 03/21/2026 |
| ACTIVE SIGNS | Scaffold | 3 | 07/08/2026 |
| FM95 NY | Scaffold | 2 | 07/08/2026 |
| MARTINEZ, JOSE | Electrical | 1 | 03/21/2026 |
| GLENDALE ELECTL CONTNG IN | Electrical | 1 | 03/22/2026 |
| SANG CHEUNG | Electrical | 1 | 03/21/2026 |
| DONADIO, JOHN | Electrical | 1 | 03/21/2026 |
| SEECHARAN, STEVE | Electrical | 1 | 03/21/2026 |
| SOLAS ELECTRICAL CORP | Electrical | 1 | 03/22/2026 |
| TAYLOR, THOMAS | Electrical | 1 | 03/21/2026 |
| CANAVAN, ANDREW | Electrical | 1 | 03/21/2026 |
| MCKENNA, KERWIN | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ATLAS ATC ENGINEERING INC | 8011 | 35 | 07/29/2026 |
| URBAN INTEGRATIONS LLC | 7993 | 1 | 08/30/2024 |
| GEODESIGN, INC., P.C. | 627 | 8 | 05/31/2023 |
| H & O ENGINEERING, DPC | 5595 | 1 | 12/16/2021 |
| CAPOBIANCO ENGINEERING GR | 6763 | 1 | 04/27/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | DC BUILDING SERVICES INC | 07/02/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | CONSTRUCTED CORP | 05/18/2026 |
| DOB NOW | Sign | Permit Issued | RED HOOK SIGN AND ELECT | 05/13/2026 |
| DOB NOW | Sign | Permit Issued | RED HOOK SIGN AND ELECT | 05/13/2026 |
| DOB NOW | Sign | Permit Issued | ACTIVE SIGNS INC | 01/28/2026 |
| DOB NOW | Sign | Permit Issued | ACTIVE SIGNS INC | 01/27/2026 |
| DOB NOW | Structural | Permit Issued | ANDREW WEISS | 01/20/2026 |
| DOB NOW | Sign | Permit Issued | ACTIVE SIGNS INC | 01/16/2026 |
| DOB NOW | Structural | Permit Issued | ANDREW WEISS | 01/14/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 11/26/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ANDREW WEISS | 11/21/2025 |
| DOB NOW | Boiler Equipment | Signed-off | AMERICAN BOILER & WELDING | 11/12/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 11/05/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ANDREW WEISS | 11/05/2025 |
| DOB NOW | Boiler Equipment | Signed-off | AMERICAN BOILER & WELDING | 10/27/2025 |
| DOB NOW | Construction Fence | Signed-off | ANDREW WEISS | 10/20/2025 |
| DOB NOW | General Construction | Permit Issued | ANDREW WEISS | 10/17/2025 |
| DOB NOW | Construction Fence | Signed-off | ANDREW WEISS | 09/15/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | CORE SCAFFOLD SYSTEMS INC | 09/12/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 09/02/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 09/02/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 08/29/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 08/25/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 08/25/2025 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 08/21/2025 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 08/21/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 08/20/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 08/19/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 08/18/2025 |
| DOB NOW | Sign | Signed-off | NORTH SHORE NEON SIGN CO | 08/18/2025 |
| DOB NOW | Structural | Signed-off | ANDREW WEISS | 08/15/2025 |
| DOB NOW | Sign | Permit Issued | NORTH SHORE NEON SIGN CO | 08/15/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | CORE SCAFFOLD SYSTEMS INC | 07/07/2025 |
| DOB NOW | Structural | Signed-off | ANDREW WEISS | 06/24/2025 |
| DOB NOW | Structural | Signed-off | ANDREW WEISS | 06/23/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | CORE SCAFFOLD SYSTEMS INC | 05/05/2025 |
| DOB NOW | Construction Fence | Signed-off | CORE SCAFFOLD SYSTEMS INC | 05/05/2025 |
| DOB NOW | Plumbing | Permit Issued | DC BUILDING SERVICES INC | 04/28/2025 |
| DOB NOW | Supported Scaffold | Signed-off | CORE SCAFFOLD SYSTEMS INC | 04/18/2025 |
| DOB NOW | Structural | Signed-off | ANDREW WEISS | 12/10/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/30/2025 | Signed-off | FLINTLOCK CONSTR SERV LLC | Air Conditioning Systems, Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric PURY-EP72TNU-A 6 tons · Vrf Outdoor ×98 PURY-EP-72TNU-A 6 tons · Vrf Outdoor ×14 MXZ-SM48NAM-U1 4 tons · Condensing Unit ×4 MXZ-SM60NAM-U1 5 tons · Heat Pump Outdoor ×4 MXZ-3D24NL 2 tons · Heat Pump Outdoor ×2 PUHY-EP96TNU-A1 20 tons · Vrf Outdoor ×2 PURY-EP96TNU-A1 8 tons · Vrf Outdoor ×2 PURY-HP144NU-A 12 tons · Vrf Outdoor ×2 PUZ-A24NHA7 2 tons · Condensing Unit ×2 PUZ-A42NKA7 4 tons · Heat Pump Outdoor ×2 Coleman YC240C00A2AAA5 20 tons · Condensing Unit ×2 Heating Mitsubishi Electric PEFY-PO8NMSU-ER2 7,800 tons · Vrf Indoor ×780 GMV-N24G/A3A-D(U) 11,900 tons · Vrf Outdoor ×26 PKA-A24KA7.TH 24,000 BTU · Vrf Outdoor ×6 PKFY-P12NLMU-E.TH Vrf Indoor ×4 PEFY-P72NMHSU-E Vrf Indoor ×4 PKA-23KA7.TH 36,000 tons · Vrf Outdoor ×2 PEFY-96NMHSU-E 120,000 BTU · Vrf Indoor ×4 PKFY-P24NKMU-E2.TH 24,000 tons · Vrf Indoor ×5 PKFY-P72NMHSU-E Vrf Indoor ×6 Laars ×4 Reznor SDH-125 Unit Heater ×2 Captiveaire A2-IBT-400-20D 2,606,000 BTU · Kitchen Exhaust ×2 AI-IBT-300-150-150-16Z 340,700 BTU · Kitchen Exhaust ×2 Ventilation Aaon RN-030-8-0-EB09-3C9 Rooftop Unit ×5 Mitsubishi Electric GMV-N24G/A3A-D(U) 42,000 tons · Vrf Outdoor ×2 PEAD-A42AA7 42,000 tons · Vrf Indoor ×3 Reznor SDH-300 Unit Heater ×2 Heat / Cool Mitsubishi Electric PEFY-PO8NMSU-ER2 7,800 tons · Vrf Indoor ×1,191 PEFY-P12NMS-ER2 13,600 BTU · Vrf Indoor ×32 GMV-N24G/A3A-D(U) 11,900 tons · Vrf Outdoor ×39 PEFY-P15NMSU-ER2 17,000 BTU · Vrf Indoor ×12 PEAD-A24AA7 24,000 tons · Vrf Indoor ×3 PEFY-P08NMSU-ER2 7,800 tons · Vrf Indoor ×3 PEFY-P36NKMU-E4 36,000 BTU · Vrf Indoor ×2 PEFY-P48NMAU 48,000 BTU · Vrf Indoor ×2 PKA-A24KA7.TH 24,000 BTU · Vrf Outdoor ×2 PKA-P24NKMU-E2.TH 24,000 BTU · Vrf Indoor ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/15/2025 | Permit Issued | DC BUILDING SERVICES INC | 6,668 heads, 8 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2026 | Permit Issued | DC BUILDING SERVICES INC | Gas, Storm, Water/Sanitary |
| 11/15/2025 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2026 | Permit Issued | I.P. ELECTRIC INC | General Wiring |
| 06/10/2026 | Permit Issued | I.P. ELECTRIC INC | General Wiring |
| 03/01/2026 | Complete | RAINBOW ELECTRIC CO., INC | — |
| 03/01/2026 | Complete | RAINBOW ELECTRIC CO., INC | — |
| 03/01/2026 | Complete | RAINBOW ELECTRIC CO., INC | — |
| 11/14/2025 | Complete | CITY ELEC'L SIGN ERECTORS | — |
| 10/29/2025 | Complete | CITY ELEC'L SIGN ERECTORS | — |
| 10/29/2025 | Complete | CITY ELEC'L SIGN ERECTORS | — |
| 10/29/2025 | Complete | CITY ELEC'L SIGN ERECTORS | — |
| 09/26/2025 | Permit Issued | AL-LECTRIC ELECT'L CONTRG | 1 meters, 1 new_meters |
| 05/19/2025 | Permit Issued | I.P. ELECTRIC INC | General Wiring |
| 04/10/2025 | Permit Issued | JAM ELECTRICAL CORP | — |
| 12/05/2023 | Permit Issued | I.P. ELECTRIC INC | 1 meters, 1 new_meters |
| 10/10/2023 | Complete | SOLAS ELECTRICAL CORP | — |
| 08/22/2023 | Complete | SOLAS ELECTRICAL CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | Permit Issued | CONSTRUCTED CORP | Steel, Concrete |
| 04/27/2020 | — | — | 2 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/06/2026 | Signed-off | CORE SCAFFOLD SYSTEMS INC | Fence |
| 08/25/2025 | Signed-off | CORE SCAFFOLD SYSTEMS INC | Sidewalk Shed |
| 06/14/2024 | Signed-off | CORE SCAFFOLD SYSTEMS INC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | Permit Issued | CONSTRUCTED CORP | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/12/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 05/18/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/18/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/10/2026 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 12/19/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/18/2025 | Certified Sprinkler (PL)-Sprinkler-Hydro | Certified | View ↗ |
| 12/17/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 12/17/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/10/2025 | Certified StandPipe-Fire Pump (SD)-Fire Pump Test | Certified | View ↗ |
| 11/07/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/29/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 08/18/2025 | Pass-Final PL - Underground | Pass | View ↗ |
| 08/12/2025 | Pass-Final PL - Underground | Pass | View ↗ |
| 07/23/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/29/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/17/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 10/09/2024 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 10/04/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/24/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 08/23/2024 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 08/14/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 08/14/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 08/14/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/14/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 08/05/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/14/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | RONALD GRAPIN | special |
| 07/28/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | RONALD GRAPIN | special |
| 07/01/2026 | Maintenance information | RONALD GRAPIN | energy_progress |
| 07/01/2026 | Energy Code Compliance Inspections | RONALD GRAPIN | progress |
| 07/01/2026 | Electrical motors and elevators | RONALD GRAPIN | energy_progress |
| 07/01/2026 | Exterior lighting power | RONALD GRAPIN | energy_progress |
| 07/01/2026 | Luminous Exit Path Markings | RONALD GRAPIN | special |
| 07/01/2026 | Vestibules | RONALD GRAPIN | energy_progress |
| 07/01/2026 | Interior lighting power | RONALD GRAPIN | energy_progress |
| 07/01/2026 | Air barrier continuity plan testing | RONALD GRAPIN | energy_progress |
| 07/01/2026 | Structural Stability – Alterations of existing buildings | RONALD GRAPIN | special |
| 07/01/2026 | Exterior Insulation and Finish Systems (EIFS) | RONALD GRAPIN | special |
| 07/01/2026 | Insulation placement and R values | RONALD GRAPIN | energy_progress |
| 07/01/2026 | Masonry | RONALD GRAPIN | special |
| 07/01/2026 | Fire-Resistant Penetrations and Joints | RONALD GRAPIN | special |
| 07/01/2026 | Fire-Resistance Rated Construction | RONALD GRAPIN | progress |
| 07/01/2026 | Concrete - Cast-In-Place | RONALD GRAPIN | special |
| 07/01/2026 | Fenestration areas | RONALD GRAPIN | energy_progress |
| 07/01/2026 | Air barrier - visual inspection | RONALD GRAPIN | energy_progress |
| 07/01/2026 | HVAC-R and service water piping design and insulation | RONALD GRAPIN | energy_progress |
| 07/01/2026 | Wall Panels, Curtain Walls, and Veneers | RONALD GRAPIN | special |
| 07/01/2026 | Fenestration and door U-factor and product ratings | RONALD GRAPIN | energy_progress |
| 07/01/2026 | Fenestration air leakage | RONALD GRAPIN | energy_progress |
| 07/01/2026 | Protection of exposed foundation insulation | RONALD GRAPIN | energy_progress |
| 07/01/2026 | Metering | RONALD GRAPIN | energy_progress |