← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Bennett Tower
711 WEST 190TH STREET · BIN 1064464
💬 Discuss this project
1963Year Built
7Stories
D1Building Class
R7-2Zoning
75,678 sfGross Floor Area
67Units
LL97 CoveredRent Stabilized34 Active Violations 1 old, status unconfirmed ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: Bennett Towers Apart · 18,500 sf lot · 4.09 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBennett Towers Apartments facade repair3p · 1 filing · 4 docs
Floor 7Limited exterior repairs3p · 2 filings · 7 docs
Floor 6Limited exterior repairs3p · 2 filings · 7 docs
Floor 5Limited exterior repairs3p · 2 filings · 7 docs
Floor 4Limited exterior repairs3p · 2 filings · 7 docs
Floor 3Limited exterior repairs3p · 2 filings · 7 docs
Floor 2Limited exterior repairs3p · 2 filings · 7 docs
Floor 1Limited exterior repairs3p · 2 filings · 7 docs
Site & exteriorTemporary overhead protectionUnder Construction12p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bennett Towers Apt1903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Paul Perdek, Prof. Engineering111/17/2025
Framework Engineering111/01/2022
Ashraf206/06/2022
Hoffmann Architects107/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service203/21/2026
Rite One Expediting103/21/2026
Rigid Structural Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Intersystem InstallationScaffold603/21/2026
Yarks NYCScaffold303/21/2026
Florentina Contracting CoGeneral Contractor207/08/2026
Bisantz Electric CoElectrical103/21/2026
Syed-Naqvi AltafElectrical103/21/2026
Alson Electrical ContractingElectrical103/21/2026
Building Lifecycle
All (84)Filed (5)Permit Issued (5)Signed Off (1)Facade (FISP) (12)Violation (60)Special Inspection (1)
04/29/2026
Violation issued (HPD, closed)
A
11/18/2025
Permit issued — Protection and Mechanical Methods
M01280451-I1-PMM
11/17/2025
Filed — Alteration
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01280451-I1
12/15/2022
Permit issued — General Construction
M08020365-I1-GC
11/03/2022
Violation issued (HPD, closed)
I
11/01/2022
Filed — Alteration
M08020365-I1
09/27/2022
Permit issued — Sidewalk Shed
M00616682-I1-SH
08/12/2022
Cycle 9 facade report submitted
08/12/2022
Cycle 9 facade report signed — SAFE
07/27/2022
Signed off — Alteration
FACADE REPAIR ON THE NORTH, WEST AND SOUTH FACADES AT 711 WEST 190 STREET AS SHOWN PER PLAN.
M00554119-I1
07/11/2022
Cycle 9 facade inspection completed
06/06/2022
Filed — Alteration
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00616682-P1
10/22/2021
Permit issued — Sidewalk Shed
M00616682-I1-SH
10/21/2021
Filed — Alteration
Installation of a temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00616682-I1
09/02/2021
Permit issued — General Construction
M00554119-I1-GC
07/20/2021
Filed — Alteration
FACADE REPAIR ON THE NORTH, WEST AND SOUTH FACADES AT 711 WEST 190 STREET AS SHOWN PER PLAN.
M00554119-I1
07/08/2021
Special inspection requirement — Final
Juan Kuriyama
05/16/2019
Violation issued (HPD, open)
A
05/16/2019
Violation issued (HPD, open)
A
05/16/2019
Violation issued (HPD, open)
A
05/16/2019
Violation issued (HPD, open)
A
05/16/2019
Violation issued (HPD, open)
A
10/30/2018
Cycle 8 facade report signed — SAFE
08/15/2018
Cycle 8 facade report submitted
08/10/2018
Cycle 8 facade inspection completed
07/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2018
Cycle 7 facade report signed — SAFE
06/15/2018
Cycle 7 facade inspection completed
01/10/2018
Violation issued (ECB, closed)
Construction
01/09/2018
Cycle 7 facade report submitted
10/27/2016
Violation issued (HPD, closed)
I
01/25/2016
Violation issued (ECB, closed)
Construction
12/29/2015
Violation issued (ECB, closed)
Construction
10/02/2015
Violation issued (HPD, closed)
I
12/04/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/29/2014
Violation issued (ECB, closed)
Unknown
11/29/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/27/2013
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
08/23/2012
Violation issued (HPD, closed)
B
08/23/2012
Violation issued (HPD, closed)
B
08/23/2012
Violation issued (HPD, closed)
B
08/23/2012
Violation issued (HPD, closed)
A
08/23/2012
Violation issued (HPD, closed)
B
08/23/2012
Violation issued (HPD, closed)
B
08/23/2012
Violation issued (HPD, closed)
B
08/23/2012
Violation issued (HPD, closed)
A
08/23/2012
Violation issued (HPD, closed)
B
08/23/2012
Violation issued (HPD, closed)
B
08/23/2012
Violation issued (HPD, closed)
B
08/23/2012
Violation issued (HPD, closed)
B
08/23/2012
Violation issued (HPD, closed)
B
08/23/2012
Violation issued (HPD, closed)
B
08/23/2012
Violation issued (HPD, closed)
B
08/13/2012
Cycle 7 facade report submitted
08/13/2012
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
08/09/2012
Cycle 7 facade report signed — UNSAFE
08/08/2012
Cycle 7 facade inspection completed
08/01/2012
Violation issued (ECB, closed)
Unknown
05/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/08/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedYarks NYC11/18/2025
DOB NOWGeneral ConstructionPermit IssuedFlorentina Contracting Co12/15/2022
DOB NOWSidewalk ShedPermit IssuedIntersystem Installation09/27/2022
DOB NOWSidewalk ShedPermit IssuedIntersystem Installation10/22/2021
DOB NOWGeneral ConstructionSigned-offFlorentina Contracting Co09/02/2021
BISEQISSUEDS&E Bridge & Scaffold05/30/2018
BISEQISSUEDIntersystem S&S09/11/2017
BISOTISSUEDC S Cornerstone07/19/2017
BISEQISSUEDS&E Bridge & Scaffold06/05/2017
BISOTISSUEDC S Cornerstone09/28/2016
BISFBISSUEDC C Controlled Combustion09/26/2016
BISPLISSUEDCC Controlled Plumbing Co09/15/2016
BISEQISSUEDIntersystem S&S09/14/2016
BISOTISSUEDC S Cornerstone08/08/2016
BISEQISSUEDS&E Bridge & Scaffold06/09/2016
BISOTISSUEDC S Cornerstone04/11/2016
BISPLISSUEDAlklem Plumbing03/30/2016
BISPLISSUEDCC Controlled Plumbing Co10/21/2015
BISFBISSUEDC C Controlled Combustion10/21/2015
BISEQISSUEDIntersystem S&S09/25/2015
BISPLISSUEDJodom Mechanical08/18/2015
BISOTISSUEDC S Cornerstone08/10/2015
BISOTISSUEDAdass06/29/2015
BISEQISSUEDS&E Bridge & Scaffold06/23/2015
BISEQISSUEDIntersystem S&S09/25/2014
BISOTISSUEDC S Cornerstone07/31/2014
BISEQISSUEDS&E Bridge & Scaffold07/18/2014
BISEQISSUEDIntersystems02/07/2014
BISOTISSUEDC S Cornerstone11/19/2013
BISOTISSUEDC S Cornerstone08/08/2013
BISEQISSUEDIntersystems07/11/2013
BISEQISSUEDS&E Bridge & Scaffold07/05/2013
BISEQISSUEDS&E Bridge & Scaffold02/11/2013
BISOTISSUEDC S Cornerstone09/10/2012
BISEQISSUEDSwing Staging08/10/2012
BISOTISSUEDBoro Wide Rest12/09/2004
BISBLISSUEDA.P. Laudato Co10/15/1996
BISFSISSUEDU and I Mechanical Contractors03/14/1995
1 project · most recent 11/02/2021
FiledStatusContractorScope
11/02/2021CompleteSteven Farkas—
1 project · most recent 06/06/2022
Sidewalk Shed
FiledStatusContractorScope
06/06/2022Permit IssuedIntersystem InstallationSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
07/08/2021FinalJuan Kuriyamaprogress
▾Documents — 186 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026M00554119-I1Request digital key ↗
09/02/2026M00616682-P1Request digital key ↗
09/02/2026M00616682-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits44
▸BISWORK PERMIT APPLICATION29
05/30/2018121335625Open ↗
09/13/2017121613922Open ↗
07/26/2017122676121Open ↗
Showing 3 of 29 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION15
11/01/2016121767276Open ↗
10/24/2016121767276Open ↗
10/14/2016121767276Open ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications37
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
08/20/2018121613922Open ↗
08/20/2018121613922Open ↗
05/16/2018122676121Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/02/2026M00616682-I1Open ↗
09/01/2026M08020365-I1Open ↗
08/13/2026M00616682-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
11/10/2015121767276Open ↗
10/31/2015121747119Open ↗
07/23/2013121613922Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
11/10/2015121767276Open ↗
10/31/2015121747119Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
07/23/2013121613922Open ↗
08/13/2012121335625Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026M00554119-I1Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
11/01/2016121767276Open ↗
10/24/2016121767276Open ↗
10/14/2016121767276Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
10/14/2016121767276Open ↗
10/03/2016121767276Open ↗
11/10/2015121767276Open ↗
▸BISSCHEDULE B - PLUMBING1
07/08/2014122038696Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
11/19/2015122038696Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
03/30/2016122676121Open ↗
03/14/2016122676121Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
02/18/2016122676121Open ↗
11/10/2015121767276Open ↗
10/31/2015121747119Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026M08020365-I1Open ↗
08/13/2026M00554119-I1Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
07/23/2013121613922Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
03/30/2018122676121Open ↗
10/27/2017121145796Open ↗
05/10/2017121767276Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
05/16/2018122676121Open ↗
03/30/2018122676121Open ↗
10/27/2017121145796Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections1
07/08/2014122038696Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: PILE DRIVING2
03/30/2018122676121Open ↗
03/30/2018122676121Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/18/2016122676121Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
04/18/2016122676121Open ↗
▸Approvals, Objections & Sign-offs20
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST8
08/20/2018121613922Open ↗
05/16/2018122676121Open ↗
03/30/2018122676121Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/10/2017121767276Open ↗
07/28/2016121747119Open ↗
07/24/2014121335625Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER3
07/24/2014121335625Open ↗
07/16/2013121335625Open ↗
02/19/2013121335625Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
07/23/2013121613922Open ↗
08/13/2012121335625Open ↗
07/11/2012121145796Open ↗
▸BISSUPERSEDING LETTER2
10/15/2014121613922Open ↗
02/19/2013121335625Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT16
05/16/2018122676121Open ↗
03/30/2018122676121Open ↗
10/27/2017121145796Open ↗
Showing 3 of 16 on file for this type
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION9
05/11/2018122676121Open ↗
11/01/2016121767276Open ↗
10/14/2016121767276Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET8
02/18/2016122676121Open ↗
11/10/2015121767276Open ↗
10/31/2015121747119Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM4
08/20/2018121613922Open ↗
05/16/2018122676121Open ↗
03/30/2018122676121Open ↗
Showing 3 of 4 on file for this type