1895Year Built
11Stories
D0Building Class
M1-5/R9AZoning
64,326 sfGross Floor Area
20Units
LL97 CoveredRent Stabilized13 Open Violations 8 unresolved · 5 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator co-op, conversion from loft/warehouse · Owner of record: 712 BROADWAY CORP · 6,870 sf lot · 9.36 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof1p · 1 filing · 14 docs
Floor 61p · 1 filing · 5 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Sub-Cellar1p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHR GROUP1407/08/2026
AKAM ASSOCIATES1707/08/2026
712 BROADWAY4503/22/2026
ANDREWS BUILDING1203/22/2026
JAY YABLON S/C OWNER AGEN103/22/2026
712 BWAY103/22/2026
OXFORD103/22/2026
712 BROADWAY OWNERS1403/21/2026
TIME EQUITIES403/21/2026
G M CONSTRUCTION WATER303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LAWP ARCHITECTURE203/21/2026
NEW YORK ENGINEERING ASSOCIATES P203/21/2026
NYCCODE603/21/2026
MUNICIPAL BUILDING CONSULTANTS203/21/2026
HIERARCH-E203/21/2026
LOMBARDO BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHR GROUP INCGeneral Contractor1307/08/2026
SMI CONSTRUCTION MANGEMENTGeneral Contractor403/21/2026
ARISTON CHIMNEY LLCGeneral Contractor303/21/2026
R.J.C. MECHANICAL CORPPlumbing203/22/2026
ARCON PLBG SOLUTIONSPlumbing207/08/2026
RICHARD NEUElectrical103/21/2026
RADOS MILOJKOVICElectrical103/21/2026
JOE ZAGOElectrical103/21/2026
ROBERT CHIMENTIElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BONE/LEVINE ARCHITECTS307205/30/2025
SWL ENGINEERING INSPECTIO6912205/30/2025
NEW YORK ENGINEERING ASSO851111/09/2023
SKYLINE ENGINEERING, PLLC267303/08/2022
ARCO ENGINEERING PC3769101/27/2021
Building Lifecycle
All (129)Filed (11)Permit Issued (14)Signed Off (3)Facade (FISP) (15)Violation (60)Inspection (2)Objection (11)Special Inspection (13)
09/26/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/03/2025
Permit issued — Suspended Scaffold
M01083481-I1-SC
06/06/2025
Objection raised — Admin
05/30/2025
Filed — Alteration
EXTERIOR REPAIRS TO INCLUDE SCRAPE, PRIME AND PAINT EXISTING FIRE ESCAPE & LOCALIZED MASONRY REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00821939-P1
05/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/14/2025
Permit issued — General Construction
M00821939-I1-GC
05/14/2025
Permit issued — Supported Scaffold
M00905964-I1-SF
03/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSHUA LUCKRITZ
03/28/2025
Special inspection requirement — Masonry
Kevin Bone
03/28/2025
Special inspection requirement — Final
Kevin Bone
10/09/2024
Permit issued — Supported Scaffold
M00905964-I1-SF
09/30/2024
Permit issued — Sidewalk Shed
M00919007-I1-SH
08/08/2024
Permit issued — Suspended Scaffold
M01083481-I1-SC
08/08/2024
Objection resolved — Addressed
08/05/2024
Objection raised — Other
07/27/2024
Filed — Alteration
Suspended scaffold installation and use as per plans filed herewith.
M01083481-I1
06/27/2024
Permit issued — General Construction
M00821939-I1-GC
03/05/2024
Violation issued (FDNY_NOV, closed)
01/23/2024
Signed off — Alteration
INSTALL CHIMNEY LINER.
M00950031-I1
11/16/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/16/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/16/2023
Violation issued (ECB, closed)
Construction
11/15/2023
Permit issued — General Construction
M00950031-I1-GC
11/09/2023
Filed — Alteration
INSTALL CHIMNEY LINER.
M00950031-I1
10/18/2023
Special inspection requirement — Chimneys and vents
LOUIS ARENA
10/18/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
10/18/2023
Special inspection requirement — Final
LOUIS ARENA
09/19/2023
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SIDEWALK SHED AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00919007-I1
09/19/2023
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.
M00905964-P1
09/19/2023
Permit issued — Sidewalk Shed
M00919007-I1-SH
07/18/2023
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS, USE OR OCCUPANCY UNDER THIS APPLICATION.
M00905964-I1
07/18/2023
Permit issued — Supported Scaffold
M00905964-I1-SF
04/16/2023
Objection raised — Scope
04/16/2023
Objection resolved — Addressed
04/16/2023
Objection raised — Inspections
04/16/2023
Objection resolved — Addressed
04/16/2023
Objection raised — Other
04/16/2023
Objection resolved — Addressed
04/16/2023
Objection raised — Admin
04/16/2023
Objection resolved — Addressed
04/14/2023
Filed — Alteration
EXTERIOR REPAIRS TO INCLUDE SCRAPE, PRIME AND PAINT EXISTING FIRE ESCAPE & LOCALIZED MASONRY REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00821939-I1
03/31/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
10/14/2022
Violation issued (FDNY_NOV, closed)
06/22/2022
Cycle 9 facade report signed — SWARMP
03/28/2022
Signed off — Alteration
M00451746-I1
03/18/2022
Signed off — Alteration
HEREWITH FILE PLANS TO RELOCATE AND INSTALL BATHROOMS AND KITCHEN.
M00446802-I1
03/10/2022
Violation issued (HPD, closed)
A
03/10/2022
Violation issued (HPD, closed)
I
03/08/2022
Filed — Alteration
HEREWITH FILE PLANS TO RELOCATE AND INSTALL BATHROOMS AND KITCHEN.
M00446802-P3
03/07/2022
Special inspection requirement — Energy Code Compliance
Matthew Wavro
03/07/2022
Special inspection requirement — Maintenance information
Matthew Wavro
03/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
02/17/2022
Cycle 9 facade report submitted
02/16/2022
Cycle 9 facade inspection completed
02/14/2022
Filed — Alteration
HEREWITH FILE PLANS TO RELOCATE AND INSTALL BATHROOMS AND KITCHEN.
M00446802-P2
01/28/2022
Special inspection requirement — Maintenance information
Matthew Wavro
01/28/2022
Special inspection requirement — Energy Code Compliance
Matthew Wavro
01/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedPEDROL CONTRACTING INC07/03/2025
DOB NOWGeneral ConstructionPermit IssuedSHR GROUP INC05/14/2025
DOB NOWSupported ScaffoldPermit IssuedSHR GROUP INC05/14/2025
DOB NOWSupported ScaffoldPermit IssuedSHR GROUP INC10/09/2024
DOB NOWSidewalk ShedPermit IssuedSHR GROUP INC09/30/2024
DOB NOWSuspended ScaffoldPermit IssuedPEDROL CONTRACTING INC08/08/2024
DOB NOWGeneral ConstructionPermit IssuedSHR GROUP INC06/27/2024
DOB NOWGeneral ConstructionSigned-offARISTON CHIMNEY LLC11/15/2023
DOB NOWSidewalk ShedPermit IssuedSHR GROUP INC09/19/2023
DOB NOWSupported ScaffoldPermit IssuedSHR GROUP INC07/18/2023
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS05/03/2021
DOB NOWMechanical SystemsSigned-offSMI CONSTRUCTION MANGEMEN04/20/2021
DOB NOWMechanical SystemsSigned-offSMI CONSTRUCTION MANGEMEN03/09/2021
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS01/13/2021
BISOTISSUEDSMI CONSTRUCTION MANGEMENT12/14/2021
BISOTISSUEDSMI CONSTRUCTION MANGEMENT04/02/2021
BISOTISSUEDSMI CONSTRUCTION MANGEMENT12/22/2020
BISSPISSUEDALLSTATE SPRINKLER LLC04/15/2019
BISMHISSUEDMASTER COOLING SERVICE CO03/29/2019
BISOTISSUEDB&B CONTRACTING GRP LLC01/24/2019
BISPLISSUEDNICE PLUMBING CORP11/30/2018
BISPLISSUEDRRP PLUMBING CORP11/20/2018
BISMHISSUEDV B BRAD CONSTRUCTION LLC10/23/2018
BISOTISSUEDV B BRAD CONSTRUCTION LLC10/23/2018
BISOTISSUEDKLEIN KITCHEN, INC10/17/2018
BISOTISSUEDSTEVEN M YANG ARCHITECT L08/15/2018
BISOTISSUEDSTEVEN M YANG ARCHITECT L05/14/2018
BISMHISSUEDSTEVEN M YANG ARCHITECT L10/17/2016
BISPLISSUEDPRACTICAL PLBG & HTG INC04/19/2016
BISOTISSUEDSTEVEN M YANG ARCHITECT L02/25/2016
BISPLISSUEDAPEC CORP04/23/2015
BISMHISSUEDMAGIC TOUCH CONSTRUCTION02/27/2015
BISOTISSUEDMAGIC TOUCH CONSTRUCTION02/26/2015
BISPLISSUEDAPEC CORP02/26/2015
BISOTISSUEDB N J CONSTRUCTION CORP04/28/2014
BISOTISSUEDB N J CONSTRUCTION CORP01/17/2014
BISOTISSUEDDJM RESTORATION INC11/15/2013
BISPLISSUEDP.S.I. MECHANICAL11/12/2013
BISOTISSUEDDJM RESTORATION INC10/04/2013
BISOTISSUEDB N J CONSTRUCTION CORP09/27/2013
+ 24 more permits on file
6 projects · most recent 05/14/2024
General Wiring HVAC Wiring
FiledStatusContractorScope
05/14/2024Permit IssuedRICHARD NEU—
07/13/2023Permit IssuedROBERT CHIMENTI4 meters, 1 new_meters
01/10/2021CompleteJOSEPH SGROI & SONS, INC.General Wiring
12/07/2018CompleteGOTHAM WIRING LICENSEDGeneral Wiring
11/13/2018CompleteVOLTAGE ELECTRIC CORPHVAC Wiring
10/30/2018CompleteVOLTAGE ELECTRIC CORP—
2 projects · most recent 09/19/2023
Sidewalk Shed Scaffold
FiledStatusContractorScope
09/19/2023Permit IssuedSHR GROUP INCSidewalk Shed
09/19/2023Permit IssuedSHR GROUP INCScaffold
1 project · most recent 07/27/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
07/27/2024Permit IssuedPEDROL CONTRACTING INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/26/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
05/15/2025Tenant Protection Plan Compliance—special
03/28/2025Structural Stability – Alterations of existing buildingsJOSHUA LUCKRITZspecial
03/28/2025MasonryKevin Bonespecial
03/28/2025FinalKevin Boneprogress
10/18/2023Chimneys and ventsLOUIS ARENAspecial
10/18/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
10/18/2023FinalLOUIS ARENAprogress
03/07/2022Energy Code ComplianceMatthew Wavroprogress
03/07/2022Maintenance informationMatthew Wavroenergy_progress
03/07/2022Fire-Resistant Penetrations and JointsMatthew Wavrospecial
01/28/2022Maintenance informationMatthew Wavroenergy_progress
01/28/2022Energy Code ComplianceMatthew Wavroprogress
01/28/2022Fire-Resistant Penetrations and JointsMatthew Wavrospecial
▾Documents — 406 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch7
08/29/2026M00905964-I1Request digital key ↗
08/29/2026M00905964-P1Request digital key ↗
08/29/2026M00919007-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00446802-P2Request digital key ↗
09/04/2026M00446802-P3Request digital key ↗
09/04/2026M00446802-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00451746-I1Request digital key ↗
▸Applications & Permits90
▸BISWORK PERMIT APPLICATION44
12/22/2020140972160Open ↗
10/08/2019123001786Open ↗
07/24/2019123001786Open ↗
Showing 3 of 44 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION39
06/18/2021140972160Open ↗
06/16/2021140972160Open ↗
12/15/2020140972160Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWLPC Approval/Permit7
09/04/2026M00446802-P2Open ↗
09/04/2026M00446802-P3Open ↗
09/04/2026M00446802-I1Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications93
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION45
11/19/2019123001786Open ↗
07/10/2019123661386Open ↗
07/10/2019123661386Open ↗
Showing 3 of 45 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
03/26/2019123732755Open ↗
01/23/2019123661395Open ↗
01/23/2019123661386Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/04/2026M00446802-P2Open ↗
09/04/2026M00446802-P3Open ↗
09/04/2026M00446802-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
12/15/2020140972160Open ↗
03/26/2019123732755Open ↗
01/23/2019123661395Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026M00950031-I1Open ↗
09/01/2026M00446802-P2Open ↗
09/01/2026M00446802-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026M00950031-I1Open ↗
09/02/2026M00950031-I1Open ↗
09/01/2026M00446802-P2Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/15/2020140972160Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/15/2020140972160Open ↗
▸Trade Schedules & Equipment26
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
01/23/2019123661386Open ↗
09/19/2018123543497Open ↗
07/24/2018123001786Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS3
07/29/2020123732755Open ↗
07/27/2020123732755Open ↗
Showing 2 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
07/29/2020123732755Open ↗
07/27/2020123732755Open ↗
Showing 2 of 3 on file for this type
▸Safety & Tenant Protection8
▸BISTenant Protection Plan and Notes8
03/26/2019123732755Open ↗
01/23/2019123661395Open ↗
01/23/2019123661386Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos22
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
12/15/2020140972160Open ↗
03/26/2019123732755Open ↗
01/23/2019123661395Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/04/2026M00446802-I1Open ↗
09/04/2026M00446802-P2Open ↗
09/04/2026M00446802-P3Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
11/19/2019123001786Open ↗
03/26/2019123732755Open ↗
03/26/2019123732755Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
07/27/2020123732755Open ↗
11/19/2019123001786Open ↗
10/18/2018123485601Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
09/04/2026M00446802-I1Open ↗
08/13/2026M00451746-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/27/2020123732755Open ↗
▸BISNYCECC EXEMPTION1
12/15/2020140972160Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY8
03/25/2022140972160Open ↗
03/25/2022140972160Open ↗
06/23/2021140972160Open ↗
Showing 3 of 8 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/28/2022140972160Open ↗
▸Approvals, Objections & Sign-offs42
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
03/28/2022140972160Open ↗
07/27/2020123732755Open ↗
07/27/2020123661395Open ↗
Showing 3 of 15 on file for this type
▸BISLANDMARKS APPROVAL13
12/15/2020140972160Open ↗
03/28/2019123732755Open ↗
01/23/2019123661395Open ↗
Showing 3 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/07/2019123001786Open ↗
Showing 1 of 4 on file for this type
▸BISLANDMARKS SIGNOFF3
03/28/2022140972160Open ↗
07/27/2020123732755Open ↗
07/27/2020123661395Open ↗
▸BISFINAL1
03/28/2022140972160Open ↗
▸Cost, Insurance & Ownership41
▸BISCOST AFFIDAVIT38
12/15/2020140972160Open ↗
07/27/2020123732755Open ↗
07/27/2020123661395Open ↗
Showing 3 of 38 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
10/21/2016122638057Open ↗
Showing 1 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
03/25/2022140972160Open ↗
▸Filing & Intake Forms31
▸BISEFILING COVER SHEET17
03/26/2019123732755Open ↗
01/23/2019123661395Open ↗
01/23/2019123661386Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM9
07/29/2020123732755Open ↗
03/27/2020123732755Open ↗
03/23/2020123732755Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION4
03/27/2020123732755Open ↗
08/06/2018123485601Open ↗
08/24/2016122638057Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
12/15/2020140972160Open ↗
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/20/2014121988723Open ↗
06/20/2014121988723Open ↗
▸DOB NOWProof of Historic Building2
08/13/2026M00821939-I1Open ↗
08/13/2026M00821939-P1Open ↗
▸BISLAA - Supporting Documentation1
01/23/2019123661395Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01083481-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01083481-I1Open ↗