← Back
Predominantly retail with other uses
7122 18 AVENUE
BROOKLYN · BIN 3157892
💬 Discuss this project
1999Year Built
2Stories
K4Building Class
R5Zoning
8,000 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 7124 18TH AVENUE LLC · 4,000 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction8p · 2 filings · 8 docs
Floor 1
Cellar1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BENSONHURST SOCIAL DAYCARE LLC1303/22/2026
7124 18TH AVENUE LLC403/22/2026
CENTURY 21603/21/2026
CENTURY 21- CALABRESE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHI F. LAU ARCHITECT, P.C.307/15/2026
ARQUITECTURA VARELA410/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L & J DESIGN GROUP803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INNOVATIVE VENTURES TEAMGeneral Contractor303/21/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
Building Lifecycle
All (62)Filed (7)Permit Issued (3)Signed Off (2)Violation (22)Inspection (3)Objection (12)Special Inspection (13)
09/30/2026
Permit issued — General Construction
B01401777-I1-GC
08/06/2026
Objection resolved — Resolved
07/28/2026
Objection resolved — Addressed
07/22/2026
Objection raised — Other
07/21/2026
Objection raised — Other
07/15/2026
Filed — No Work
B01404438-I1
07/15/2026
Filed — Alteration CO
Propose converting the existing medical office on the 2nd floor into a community center for a senior care facility (UG IIIB). This work includes interior renovation with minor partitions and interior finishes as specified in the plan. Request new CofO.
B01401777-S1
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
07/02/2026
Objection resolved — Addressed
07/02/2026
Objection resolved — Addressed
07/02/2026
Objection resolved — Addressed
07/02/2026
Objection resolved — Resolved
06/24/2026
Objection raised — Other
06/24/2026
Objection raised — Other
06/15/2026
Objection raised — Other
06/15/2026
Objection raised — Admin
05/28/2026
Filed — Alteration CO
Propose converting the existing medical office on the 2nd floor into a community center for a senior care facility (UG IIIB). This work includes interior renovation with minor partitions and interior finishes as specified in the plan. Request new CofO.
B01401777-I1
08/12/2025
Violation issued (ECB, closed)
Construction
08/12/2025
Violation issued (ECB, closed)
Construction
08/12/2025
Violation issued (ECB, closed)
Construction
11/14/2023
Signed off — Alteration
INTERIOR RENOVATION IN 2ND FLOOR ONLY THAT INCLUDES REMOVAL OF INTERIOR WALLS, DROP CEILINGS, NEW FLOORING AND NEW TOILET ROOM AS PER PLANS.- SPACE TO BE USED AS ADULT DAYCARE. NO CHANGE IN USE GROUP.- ALL PLUMBING WORK FILED UNDER A SUBSEQUENT APP.
B00911837-S1
11/14/2023
Signed off — Alteration
INTERIOR RENOVATION IN 2ND FLOOR ONLY THAT INCLUDES REMOVAL OF INTERIOR WALLS, DROP CEILINGS, NEW FLOORING AND NEW TOILET ROOM AS PER PLANS.- SPACE TO BE USED AS ADULT DAYCARE. NO CHANGE IN USE GROUP.- ALL PLUMBING WORK FILED UNDER A SUBSEQUENT APP.
B00911837-I1
11/02/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2023
Filed — Alteration
INTERIOR RENOVATION IN 2ND FLOOR ONLY THAT INCLUDES REMOVAL OF INTERIOR WALLS, DROP CEILINGS, NEW FLOORING AND NEW TOILET ROOM AS PER PLANS.- SPACE TO BE USED AS ADULT DAYCARE. NO CHANGE IN USE GROUP.- ALL PLUMBING WORK FILED UNDER A SUBSEQUENT APP.
B00911837-P2
10/23/2023
Special inspection requirement — Interior lighting power
Vicente Varela
10/23/2023
Special inspection requirement — Fire-Resistance Rated Construction
Vicente Varela
10/23/2023
Special inspection requirement — Final
Vicente Varela
10/23/2023
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
10/23/2023
Special inspection requirement — Lighting controls
Vicente Varela
10/20/2023
Filed — Alteration
INTERIOR RENOVATION IN 2ND FLOOR ONLY THAT INCLUDES REMOVAL OF INTERIOR WALLS, DROP CEILINGS, NEW FLOORING AND NEW TOILET ROOM AS PER PLANS.- SPACE TO BE USED AS ADULT DAYCARE. NO CHANGE IN USE GROUP.- ALL PLUMBING WORK FILED UNDER A SUBSEQUENT APP.
B00911837-P1
10/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Vicente Varela
10/17/2023
Special inspection requirement — Interior lighting power
Vicente Varela
10/17/2023
Special inspection requirement — Lighting controls
Vicente Varela
10/17/2023
Special inspection requirement — Fire-Resistance Rated Construction
Vicente Varela
10/17/2023
Special inspection requirement — Final
Vicente Varela
09/27/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/07/2023
Permit issued — Plumbing
B00911837-S1-PL
08/17/2023
Filed — Alteration
INTERIOR RENOVATION IN 2ND FLOOR ONLY THAT INCLUDES REMOVAL OF INTERIOR WALLS, DROP CEILINGS, NEW FLOORING AND NEW TOILET ROOM AS PER PLANS.- SPACE TO BE USED AS ADULT DAYCARE. NO CHANGE IN USE GROUP.- ALL PLUMBING WORK FILED UNDER A SUBSEQUENT APP.
B00911837-S1
08/07/2023
Permit issued — General Construction
B00911837-I1-GC
08/02/2023
Filed — Alteration
INTERIOR RENOVATION IN 2ND FLOOR ONLY THAT INCLUDES REMOVAL OF INTERIOR WALLS, DROP CEILINGS, NEW FLOORING AND NEW TOILET ROOM AS PER PLANS.- SPACE TO BE USED AS ADULT DAYCARE. NO CHANGE IN USE GROUP.- ALL PLUMBING WORK FILED UNDER A SUBSEQUENT APP.
B00911837-I1
10/14/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/17/2020
Violation issued (ECB, closed)
Elevators
06/05/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/06/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/17/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/17/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/22/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/17/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/14/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/31/2002
Violation issued (ECB, closed)
Construction
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedINNOVATIVE VENTURES TEAM09/30/2026
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP09/07/2023
DOB NOWGeneral ConstructionSigned-offINNOVATIVE VENTURES TEAM08/07/2023
BISMHISSUEDM.R.S., INC01/17/2002
BIS—ISSUEDGOING SIGN & SVCNG CO,INC12/17/2001
BIS—ISSUEDGOING SIGN & SVCNG CO,INC12/17/2001
BIS—ISSUEDGOING SIGN & SVCNG CO,INC12/17/2001
BISOTISSUEDM.R.S., INC10/31/2001
BIS—ISSUEDCONTEMPO DEVELOPMENT05/12/2000
BISEQISSUEDCONTEMPO DEVELOPMENT01/25/2000
BISSPISSUEDFIREQUEST CORP12/01/1999
BISPLISSUEDSTARLITE PLBG & HTG CORP12/01/1999
BISPLISSUEDSTARLITE PLBG & HTG CORP11/19/1999
BIS—ISSUEDCONTEMPO DEVELOPMENT04/22/1999
BISEQISSUEDCONTEMPO DEVELOPMENT04/22/1999
BISEQISSUEDCONTEMPO DEVELOPMENT02/05/1999
BIS—ISSUEDCONTEMPO DEVELOPMENT02/05/1999
BIS—ISSUEDSAL ANDREW CONTRACTING01/08/1999
BISEQISSUEDSAL ANDREW CONTRACTING01/08/1999
1 project · most recent 07/15/2026
Water/Sanitary
FiledStatusContractorScope
07/15/2026——Water/Sanitary
2 projects · most recent 09/23/2026
General Wiring
FiledStatusContractorScope
09/23/2026Permit IssuedA.L. ELECTRICAL CORP.General Wiring
10/19/2022Permit IssuedKNIGHT ELEC'L SERV. CORP.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
07/06/2026Fire-Resistant Penetrations and Joints—special
07/06/2026HVAC-R and service water piping design and insulation—energy_progress
07/06/2026Energy Code Compliance Inspections—progress
10/23/2023Interior lighting powerVicente Varelaenergy_progress
10/23/2023Fire-Resistance Rated ConstructionVicente Varelaprogress
10/23/2023FinalVicente Varelaprogress
10/23/2023Energy Code Compliance InspectionsVicente Varelaprogress
10/23/2023Lighting controlsVicente Varelaenergy_progress
10/17/2023Energy Code Compliance InspectionsVicente Varelaprogress
10/17/2023Interior lighting powerVicente Varelaenergy_progress
10/17/2023Lighting controlsVicente Varelaenergy_progress
10/17/2023Fire-Resistance Rated ConstructionVicente Varelaprogress
10/17/2023FinalVicente Varelaprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/27/2026B00911837-P1Request digital key ↗
08/27/2026B00911837-P2Request digital key ↗
08/27/2026B00911837-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/14/2026B01404438-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B01401777-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026B00911837-P2Open ↗
08/27/2026B00911837-P1Open ↗
08/27/2026B00911837-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00911837-P1Open ↗
09/01/2026B00911837-P1Open ↗
09/01/2026B00911837-P1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/15/2026B01401777-I1Open ↗