← Back
BuildNYC
Three families
713 BUSHWICK AVENUE
BROOKLYN · BIN 3073077
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R6Zoning
2,265 sfGross Floor Area
3Units
Three families · Owner of record: 713 Bushwick · 1,260 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 323p · 1 filing · 20 docs
Floor 221p · 1 filing · 20 docs
Floor 121p · 1 filing · 20 docs
Cellar14p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
713 Bushwick103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/10/2025$1.3M—Private party → 713 BUSHWICK LLC$574/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bayside Associates706/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC ConstructionGeneral Contractor104/09/2026
LXC Constructionspecialty_contractor104/09/2026
Best Plumbing & HVACPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD Testing & Inspection S7010706/16/2026
Building Lifecycle
06/16/2026
Filed — Alteration
PROPOSED MECHANICAL SYSTEM WORKS IN CONJUNCTION WITH DOB NOW JOB# B01231270-I1 AS PER PLAN, NO CHANGE IN USE,EGRESS AND OCCUPANCY.
B01231270-P4
06/09/2026
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
05/14/2026
Objection resolved — Addressed
05/12/2026
Objection resolved — Addressed
58 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBest Plumbing & HVAC10/15/2025
DOB NOWMechanical SystemsSigned-offLXC Construction10/14/2025
DOB NOWGeneral ConstructionSigned-offLXC Construction08/18/2025
1 project · most recent 06/16/2026
Air Conditioning Systems
FiledStatusContractorScope
06/16/2026Signed-offLXC ConstructionAir Conditioning Systems
1 project · most recent 06/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/16/2026Signed-offBest Plumbing & HVACGas, Water/Sanitary
1 project · most recent 08/01/2026
General Wiring
FiledStatusContractorScope
08/01/2026CompleteCombined Electrical ContngGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/21/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
04/10/2026Fail-Final General Construction Non-Directive 14FailView ↗
11/26/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
06/09/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
06/09/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
05/05/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
05/05/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
04/17/2026Energy Code Compliance InspectionsXIUCHENG LIprogress
04/17/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
12/19/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
12/19/2025Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
12/19/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
12/19/2025Fire-Resistance Rated ConstructionXIUCHENG LIprogress
12/19/2025Interior lighting powerXIUCHENG LIenergy_progress
12/19/2025Lighting controlsXIUCHENG LIenergy_progress
11/24/2025Lighting controlsXIUCHENG LIenergy_progress
11/24/2025Interior lighting powerXIUCHENG LIenergy_progress
11/24/2025Fire-Resistance Rated ConstructionXIUCHENG LIprogress
11/24/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
11/24/2025Structural Stability – Alterations of existing buildingsXIUCHENG LIspecial
11/24/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
09/04/2025HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
09/04/2025Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
09/04/2025HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
09/04/2025HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
09/04/2025Energy Code Compliance InspectionsXIUCHENG LIprogress
06/26/2025FinalXIUCHENG LIprogress
06/26/2025Mechanical SystemsXIUCHENG LIspecial
43 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account