Condo, residential tower (mixed-use, multi-family elevator) [derived]
714 59TH STREET
BROOKLYN · BIN 3016395
💬 Discuss this project
2016Year Built
4Stories
RMBuilding Class
R7AZoning
6,322 sfGross Floor Area
7Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: GREAT 8 REALTY LLC · 2,003 sf lot · 3.16 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Floor 14p · 3 filings · 20 docs
Cellar3p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREAT 8 REALTY503/22/2026
JC PREMIUM CONSTRUCTION 1103/22/2026
MILLENIUM BUILDERS & DEVE203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI203/06/2026
GREAT WALL CONSULTANT PROFESSIONAL810/01/2021
HARRY TENENBAUM,PE101/28/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
P L ELECL CONTRG CORP 003654General Contractor303/22/2026
PETER LIElectrical303/21/2026
JZ CONSTRUCTION GROUP INCGeneral Contractor303/21/2026
QMB PLUMBING & HEATING INCPlumbing207/08/2026
AI FANG WUElectrical103/21/2026
VMC PLUMBING & HEATING INPlumbing107/08/2026
KALE CONSTRUCTION INCGeneral Contractor107/11/2026
KWONG MING ELECTRIC INC 003828General Contractor103/22/2026
SPLEN CONSTRUCTION INCGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394103/06/2026
STREET CONSULTING ENGINEE4259210/01/2021
GREAT WALL CONSULTANT P.E5633609/30/2021
S M TAM ARCHITECT, PLLC1666101/28/2020
Building Lifecycle
All (68)Filed (11)Permit Issued (4)Signed Off (4)Violation (11)Inspection (7)Objection (1)Special Inspection (30)
07/10/2026
Permit issued — General Construction
B01346828-I1-GC
03/12/2026
Violation issued (FDNY_ORDER, closed)
03/12/2026
Violation issued (FDNY_ORDER, closed)
03/06/2026
Filed — Alteration
B01346828-I1
01/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
FARHAD BASSIRI-TEHRANI
02/12/2025
Objection raised — Other
02/07/2025
Filed — Alteration
RESOLVE ECB VIOLATION: 39132866Z; REMOVE FIBER GLASS AWNING ENCLOSURE AND SIGN AT STOREFRONT RESTORE TO PRIOR LEGAL CONDITION AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01177668-I1
12/13/2024
Violation issued (ECB, closed)
Construction
03/31/2023
Violation issued (HPD, closed)
A
11/15/2022
Violation issued (HPD, closed)
I
09/30/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/18/2021
Signed off — Alteration
Propose installation of new AC units and exhaust duct work of existing commercial space in conjunction with Construction #B00485478 as per plan. No change in use, egress, or occupancy. Obtain a certificate of compliance.
B00485496-I1
11/17/2021
Signed off — Alteration
Propose plumbing work of existing commercial space on cellar thru 1st floor in conjunction with DOB Now Construction #B00485478 as per plan and per C/O #320265823F. No change in use, egress, or occupancy.
B00485492-I1
11/17/2021
Signed off — Alteration
B00485478-I1
11/09/2021
Special inspection requirement — Interior lighting power
Xiong Wei Wu
11/09/2021
Special inspection requirement — Lighting controls
Xiong Wei Wu
11/09/2021
Special inspection requirement — Metering
Xiong Wei Wu
11/09/2021
Special inspection requirement — Air barrier - visual inspection
Xiong Wei Wu
11/09/2021
Special inspection requirement — Energy Code Compliance Inspections
Xiong Wei Wu
11/09/2021
Special inspection requirement — Fire-Resistance Rated Construction
Xiong Wei Wu
11/09/2021
Special inspection requirement — Masonry
Xiong Wei Wu
11/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
11/05/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/25/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/12/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Erik Street
10/12/2021
Special inspection requirement — Mechanical Systems
Erik Street
10/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Erik Street
10/12/2021
Special inspection requirement — Energy Code Compliance Inspections
Erik Street
10/12/2021
Special inspection requirement — Final
Erik Street
10/12/2021
Special inspection requirement — Fire-Resistance Rated Construction
Erik Street
10/12/2021
Special inspection requirement — Duct leakage testing, insulation and design
Erik Street
10/12/2021
Special inspection requirement — HVAC-R and service water heating equipment
Erik Street
10/12/2021
Special inspection requirement — HVAC-R and service water heating system controls
Erik Street
10/07/2021
Permit issued — Mechanical Systems
B00485496-I1-MS
10/01/2021
Filed — Alteration
Propose installation of new AC units and exhaust duct work of existing commercial space in conjunction with Construction #B00485478 as per plan. No change in use, egress, or occupancy. Obtain a certificate of compliance.
B00485496-P1
09/30/2021
Filed — Alteration
B00485478-P2
09/30/2021
Special inspection requirement — HVAC-R and service water heating equipment
Erik Street
09/30/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Erik Street
09/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiong Wei Wu
09/30/2021
Special inspection requirement — Energy Code Compliance Inspections
Xiong Wei Wu
09/30/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Xiong Wei Wu
09/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Erik Street
09/30/2021
Special inspection requirement — Mechanical Systems
Erik Street
09/30/2021
Special inspection requirement — Energy Code Compliance Inspections
Erik Street
09/30/2021
Special inspection requirement — Final
Erik Street
09/30/2021
Special inspection requirement — Fire-Resistance Rated Construction
Erik Street
09/30/2021
Special inspection requirement — Duct leakage testing, insulation and design
Erik Street
09/30/2021
Special inspection requirement — HVAC-R and service water heating system controls
Erik Street
09/22/2021
Filed — Alteration
Propose plumbing work of existing commercial space on cellar thru 1st floor in conjunction with DOB Now Construction #B00485478 as per plan and per C/O #320265823F. No change in use, egress, or occupancy.
B00485492-P2
09/17/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/30/2021
Filed — Alteration
Propose plumbing work of existing commercial space on cellar thru 1st floor in conjunction with DOB Now Construction #B00485478 as per plan and per C/O #320265823F. No change in use, egress, or occupancy.
B00485492-P1
07/20/2021
Filed — Alteration
B00485478-P1
06/21/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/21/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/21/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/01/2021
Permit issued — Plumbing
B00485492-I1-PL
04/20/2021
Violation issued (HPD, closed)
A
03/23/2021
Filed — Alteration
Propose installation of new AC units and exhaust duct work of existing commercial space in conjunction with Construction #B00485478 as per plan. No change in use, egress, or occupancy. Obtain a certificate of compliance.
B00485496-I1
03/23/2021
Filed — Alteration
Propose plumbing work of existing commercial space on cellar thru 1st floor in conjunction with DOB Now Construction #B00485478 as per plan and per C/O #320265823F. No change in use, egress, or occupancy.
B00485492-I1
03/23/2021
Filed — Alteration
B00485478-I1
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC07/10/2026
DOB NOWMechanical SystemsSigned-offJZ CONSTRUCTION GROUP INC10/07/2021
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC06/01/2021
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC01/29/2020
BISSPISSUEDRRP PLUMBING CORP03/26/2019
BISPLISSUEDFULL CIRCLE PLUMBING CORP.01/07/2019
BIS—ISSUEDJAYA CONTRACTING INC05/11/2018
BIS—ISSUEDJAYA CONTRACTING INC04/16/2018
BISEQISSUEDJAYA CONTRACTING INC04/16/2018
BISEQISSUEDSUNLIGHT CONSTRUCTION AA04/18/2017
BISEQISSUEDJC PREMIUM CONSTRUCTION I04/18/2017
BIS—ISSUEDJC PREMIUM CONSTRUCTION I08/10/2016
BISSPISSUEDRRP PLUMBING CORP06/30/2016
BISEQISSUEDJC PREMIUM CONSTRUCTION I02/26/2016
BIS—ISSUEDJC PREMIUM CONSTRUCTION I02/26/2016
BISPLISSUEDFULL CIRCLE PLUMBING CORP.09/11/2015
BISSPISSUEDCAPITOL FIRE SPKL CO,INC05/14/2015
BIS—RE-ISSUEDMILLENNIUM BUILDERS &.DEV02/17/2015
BISEQISSUEDMILLENNIUM BUILDERS &.DEV02/17/2015
BISEQISSUEDMILLENNIUM BUILDERS &.DEV12/11/2014
BIS—ISSUEDMILLENNIUM BUILDERS &.DEV12/11/2014
BISEQISSUEDDONG & TANG INC03/24/2014
BIS—ISSUEDDONG & TANG INC03/24/2014
4 projects · most recent 09/08/2021
General Wiring
FiledStatusContractorScope
09/08/2021CompleteP.L. ELEC'L CONTR'G CORP8 meters, 1 new_meters
06/22/2021CompleteKWONG MING ELECTRIC INCGeneral Wiring
06/21/2021CompleteKWONG MING ELECTRIC INC—
04/28/2020CompleteP.L. ELEC'L CONTR'G CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/30/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/05/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/25/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/17/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/21/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/21/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/21/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
01/14/2026Tenant Protection Plan ComplianceFARHAD BASSIRI-TEHRANIspecial
11/09/2021Interior lighting powerXiong Wei Wuenergy_progress
11/09/2021Lighting controlsXiong Wei Wuenergy_progress
11/09/2021MeteringXiong Wei Wuenergy_progress
11/09/2021Air barrier - visual inspectionXiong Wei Wuenergy_progress
11/09/2021Energy Code Compliance InspectionsXiong Wei Wuprogress
11/09/2021Fire-Resistance Rated ConstructionXiong Wei Wuprogress
11/09/2021MasonryXiong Wei Wuspecial
11/09/2021Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
10/12/2021HVAC-R and service water piping design and insulationErik Streetenergy_progress
10/12/2021Mechanical SystemsErik Streetspecial
10/12/2021Fire-Resistant Penetrations and JointsErik Streetspecial
10/12/2021Energy Code Compliance InspectionsErik Streetprogress
10/12/2021FinalErik Streetprogress
10/12/2021Fire-Resistance Rated ConstructionErik Streetprogress
10/12/2021Duct leakage testing, insulation and designErik Streetenergy_progress
10/12/2021HVAC-R and service water heating equipmentErik Streetenergy_progress
10/12/2021HVAC-R and service water heating system controlsErik Streetenergy_progress
09/30/2021HVAC-R and service water heating equipmentErik Streetenergy_progress
09/30/2021HVAC-R and service water piping design and insulationErik Streetenergy_progress
09/30/2021Fire-Resistant Penetrations and JointsXiong Wei Wuspecial
09/30/2021Energy Code Compliance InspectionsXiong Wei Wuprogress
09/30/2021HVAC-R and service water piping design and insulationXiong Wei Wuenergy_progress
09/30/2021Fire-Resistant Penetrations and JointsErik Streetspecial
09/30/2021Mechanical SystemsErik Streetspecial
Latest 25 of 52.
▾Documents — 251 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch10
09/01/2026B00485492-P1Request digital key ↗
09/01/2026B00485492-I1Request digital key ↗
09/01/2026B00485492-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00304324-I1Request digital key ↗
▸Applications & Permits36
▸BISWORK PERMIT APPLICATION17
03/27/2019320337989Open ↗
01/07/2019320265823Open ↗
05/14/2018320265823Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
02/17/2021322035445Open ↗
02/02/2021322035445Open ↗
11/19/2019320265823Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
01/02/2020320265823Open ↗
01/02/2020320265823Open ↗
11/13/2019320265823Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
07/18/2011320337970Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
02/23/2018320265823Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING EXHIBIT I: CERTIFICATION2
02/19/2021322035445Open ↗
08/05/2011320265823Open ↗
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
08/05/2011320265823Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/19/2021322035445Open ↗
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
02/02/2011320265823Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/19/2021322035445Open ↗
▸BISVERIFY TAX LOT1
06/16/2020320265823Open ↗
▸BISZONING DIAGRAM1
05/17/2011320265823Open ↗
▸Seals & Professional Certifications81
▸DOB NOWProgress Inspector Seal & Signature38
09/01/2026B00485478-P1Open ↗
09/01/2026B00485478-P1Open ↗
09/01/2026B00485478-P1Open ↗
Showing 3 of 38 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION18
08/22/2019320337989Open ↗
08/22/2019320337989Open ↗
03/14/2019320265823Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/01/2026B00485478-P1Open ↗
09/01/2026B00485478-P1Open ↗
08/31/2026B00485478-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/01/2026B00485492-I1Open ↗
09/01/2026B00485492-P2Open ↗
09/01/2026B00485492-P1Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment18
▸BISFA - FDNY APPROVAL : FD-FAA3
07/08/2019320265823Open ↗
07/08/2019320265823Open ↗
03/25/2019321265199Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
11/13/2019320265823Open ↗
12/21/2018320337989Open ↗
10/05/2018320265823Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
11/19/2019320265823Open ↗
12/28/2018320337989Open ↗
▸BISEQUIPMENT USE PERMITS2
03/15/2019320265823Open ↗
03/15/2019320265823Open ↗
▸BISSCHEDULE B - PLUMBING2
07/19/2011320337989Open ↗
02/02/2011320265823Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
03/15/2019320265823Open ↗
02/02/2011320265823Open ↗
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0211
08/12/2016320265823Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/02/2011320265823Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
06/16/2020320265823Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
06/16/2020320265823Open ↗
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan3
08/13/2026B00485478-P2Open ↗
08/13/2026B00485478-I1Open ↗
08/13/2026B00485478-P1Open ↗
▸BISSTREET TREE CHECKLIST2
07/18/2011320337970Open ↗
02/02/2011320265823Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/11/2014320884398Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/22/2019320265823Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
07/19/2011320337989Open ↗
07/18/2011320337970Open ↗
02/02/2011320265823Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/11/2014320884398Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
09/27/2017320265823Open ↗
09/27/2017320265823Open ↗
07/11/2017320265823Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
09/01/2026B00485496-I1Open ↗
08/13/2026B00485478-I1Open ↗
08/13/2026B00485492-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
08/22/2019320337989Open ↗
07/11/2017320265823Open ↗
▸BISTECHNICAL REPORT: ENERGY1
08/05/2011320265823Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/16/2020320265823Open ↗
06/16/2020320265823Open ↗
▸BISHYDRO FLOW TEST LETTER1
07/19/2011320337989Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
02/22/2019320265823Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/05/2011320265823Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
12/15/2014320265823Open ↗
▸Approvals, Objections & Sign-offs27
▸BISLETTERS - SUPPORTING DOCUMENTATION15
02/19/2021322035445Open ↗
03/25/2019321265199Open ↗
02/26/2016320265823Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
09/27/2013320884398Open ↗
07/19/2011320337989Open ↗
07/18/2011320337970Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE4
07/07/2011320265823Open ↗
07/07/2011320265823Open ↗
02/02/2011320265823Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
06/17/2020320265823Open ↗
11/08/2019320337989Open ↗
03/25/2019321265199Open ↗
▸BISSUPERSEDING LETTER1
04/16/2018320265823Open ↗
▸Cost, Insurance & Ownership11
▸BISPROJECT-SPECIFIC GL INSURANCE5
05/14/2018320265823Open ↗
04/16/2018320265823Open ↗
08/22/2016320265823Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT3
11/08/2019320337989Open ↗
03/25/2019321265199Open ↗
07/19/2011320337989Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
04/16/2018320265823Open ↗
08/22/2016320265823Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE (PGLI)1
02/19/2015320265823Open ↗
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION10
07/08/2019320265823Open ↗
05/06/2019320265823Open ↗
02/22/2019320265823Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET8
02/19/2021322035445Open ↗
02/17/2021322035445Open ↗
11/02/2015321265199Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM3
11/08/2019320337989Open ↗
03/25/2019321265199Open ↗
02/23/2018320265823Open ↗
▸BISSRO INTAKE FORM(SRO1)1
07/11/2014320884398Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/18/2011320337970Open ↗
▸Other Documents7
▸BISPLOT DIAGRAM2
02/22/2019320265823Open ↗
02/02/2011320265823Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
02/20/2014320884398Open ↗
02/20/2014320884398Open ↗
▸BISPD-11
02/19/2021322035445Open ↗
▸BISRESTRICTION: DEED1
02/19/2021322035445Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/19/2021322035445Open ↗