← Back
Two family frame
718 42 STREET
BROOKLYN · Sunset Park (Central) · BIN 3018273
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R6BZoning
2,048 sfGross Floor Area
2Units
Two family frame · 2,003 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 11p · 1 filing · 4 docs
Cellar2p · 2 filings · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/20/2025$1.1M—— → —$537/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FARHAD BASSIRI-TEHRANI406/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor303/21/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394206/16/2025
Building Lifecycle
All (19)Filed (4)Permit Issued (2)Signed Off (2)Inspection (5)Special Inspection (6)
08/21/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01191435-I1
08/21/2025
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD REPLACE CONCRETE STAIR AT REAR YARD AND EXTERIOR WALLS. NO CHANGE IN USE, EGRESS OR OCC
B01191434-I1
07/31/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/23/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/16/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD REPLACE CONCRETE STAIR AT REAR YARD AND EXTERIOR WALLS. NO CHANGE IN USE, EGRESS OR OCC
B01191434-P1
06/16/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01191435-P1
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/16/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
06/16/2025
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
06/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
04/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/24/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/22/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/18/2025
Permit issued — Plumbing
B01191435-I1-PL
03/18/2025
Permit issued — General Construction
B01191434-I1-GC
03/12/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01191435-I1
03/12/2025
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; REPLACE CONCRETE STAIR AT REAR YARD REPLACE CONCRETE STAIR AT REAR YARD AND EXTERIOR WALLS. NO CHANGE IN USE, EGRESS OR OCC
B01191434-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC03/18/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC03/18/2025
1 project · most recent 09/10/2025
General Wiring
FiledStatusContractorScope
09/10/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/31/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/23/2025Fail-Final General Construction Non-Directive 14FailView ↗
04/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/24/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/16/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/16/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/16/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
06/16/2025Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
06/16/2025Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
06/16/2025Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026B01191435-P1Request digital key ↗
08/22/2026B01191435-I1Request digital key ↗
08/22/2026B01191434-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026B01191435-I1Open ↗
08/22/2026B01191435-P1Open ↗
08/22/2026B01191434-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026B01191434-I1Open ↗
08/25/2026B01191434-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026B01191434-I1Open ↗
08/25/2026B01191434-P1Open ↗