Office with commercial, 1-6 stories
718 5 AVENUE
MANHATTAN · BIN 1034830
💬 Discuss this project
1937Year Built
5Stories
O5Building Class
C5-3Zoning
16,200 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸
Office with commercial, 1-6 stories · Owner of record: 718 REALTY BR, LLC · 2,700 sf lot · 6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 11 filings · 20 docs
Penthouse1p · 1 filing · 6 docs
Floor 101p · 1 filing · 12 docs
Floor 9
Floor 8
Floor 7
Floor 61p · 1 filing · 3 docs
Floor 5Under Construction113p · 10 filings · 20 docs
Floor 4Under Construction127p · 13 filings · 20 docs
Floor 3Under Construction128p · 13 filings · 20 docs
Floor 2Under Construction125p · 13 filings · 20 docs
Floor 1Under Construction12p · 16 filings · 20 docs
MezzanineUnder Construction12p · 12 filings · 20 docs
Cellar12p · 20 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARAMOUNT GROUP3907/30/2026
SPRING SCAFFOLDING LLC703/22/2026
JRM CONSTRUCTION MGMT203/22/2026
2 WEST 56STREET LP103/22/2026
712 FIFTH AVENUE L P PARAMOUNT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE4403/21/2026
RIZZO GROUP5103/21/2026
JAM CONSULTANTS, INC.203/21/2026
PREEMPTIVE SOLUTIONS & CONSULTING L403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRM CONSTRUCTION MGMT LLCGeneral Contractor3507/30/2026
SHAWMUT WOODWORKING & SUPPLYGeneral Contractor2807/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor2109/19/2026
PAR PLUMBING CO., INCPlumbing1007/08/2026
AGGRESSIVE FIRE PROT LLCFire Protection907/08/2026
SPRING SCAFFOLDING LLCGeneral Contractor303/21/2026
ABSOLUTE ELEC'L CONTRG OFElectrical203/22/2026
ABCO-PEERLESS SPRKLR CORPFire Protection207/08/2026
LAWRENCE J. LEVINEFire Protection203/21/2026
SIRINA FIRE PROT CORPFire Protection207/08/2026
KING HOIST & SCAFFOLDINGGeneral Contractor207/08/2026
DAL ELECTRICAL CORP.Electrical103/22/2026
MALATESTA PALADINO, INCGeneral Contractor104/09/2026
WALTER KNITTELElectrical103/21/2026
SALVATORE D'ALESSIOElectrical103/21/2026
PHILIP MISHENElectrical103/21/2026
NYC FIRE SPRINKLER CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER5443607/02/2026
G. BLINN CONSULTING, LLC2894506/18/2026
ALAN MARGOLIN & ASSOC423707/19/2023
Building Lifecycle
All (281)Filed (80)Permit Issued (80)Signed Off (11)Violation (28)Inspection (52)Special Inspection (30)
09/18/2026
Permit issued — Construction Fence
M01223551-I1-FN
09/17/2026
Permit issued — Supported Scaffold
M01259685-I1-SF
09/17/2026
Permit issued — Protection and Mechanical Methods
M01259711-I1-PMM
09/17/2026
Permit issued — Protection and Mechanical Methods
M01223540-S1-PMM
09/17/2026
Permit issued — Protection and Mechanical Methods
M01223540-S2-PMM
09/17/2026
Permit issued — Protection and Mechanical Methods
M01223540-S3-PMM
09/03/2026
Permit issued — Protection and Mechanical Methods
M01223540-S4-PMM
08/24/2026
Filed — Alteration
Modifications to the existing plumbing system on the 3rd floor (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
M01134236-P4
08/05/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/29/2026
Permit issued — Structural
M01320144-I1-ST
07/17/2026
Filed — Alteration
Modifications to the existing plumbing system on the 3rd floor (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
M01134236-P3
07/15/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
07/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
07/06/2026
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
07/06/2026
Special inspection requirement — Maintenance information
EUGENE BIFULCO
07/06/2026
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
07/06/2026
Special inspection requirement — Final
EUGENE BIFULCO
07/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
07/06/2026
Special inspection requirement — Shutoff dampers
EUGENE BIFULCO
07/06/2026
Special inspection requirement — Ventilation and air distribution system
EUGENE BIFULCO
07/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
EUGENE BIFULCO
07/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
07/06/2026
Special inspection requirement — Lighting controls
EUGENE BIFULCO
07/02/2026
Filed — Alteration
M08025955-P1
06/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/18/2026
Filed — Alteration
TEMPORARY SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01259685-P3
06/15/2026
Signed off — Alteration
M00446869-I1
06/11/2026
Filed — Alteration
Modifications to the existing plumbing system on the 3rd floor (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
M01134236-P2
06/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2026
Filed — Alteration
Installation of new stair from 1st floor to Mezzanine and reinforcing of existing framing to support the stair (Harry Winston -Retail) as per plans. No change to use, egress or occupancy.
M01320144-I1
06/02/2026
Permit issued — Sprinklers
M01320141-I1-EW-SP
06/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/26/2026
Permit issued — Plumbing
M01324524-I1-PL
05/22/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
05/22/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/05/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/29/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/27/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/21/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
04/14/2026
Permit issued — Sprinklers
M08025961-I1-EW-SD
04/14/2026
Permit issued — Sprinklers
M08025961-I1-EW-SP
04/14/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/14/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/08/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/01/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/09/2026
Permit issued — Plumbing
M01134236-I1-PL
03/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/05/2026
Permit issued — Structural
M01295720-I1-ST
03/04/2026
Permit issued — General Construction
M01328205-I1-GC
03/03/2026
Permit issued — General Construction
M01134202-I1-GC
03/03/2026
Special inspection requirement — Fenestration air leakage
EUGENE BIFULCO
Latest 60 of 281 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSAFWAY ATLANTIC, LLC09/18/2026
DOB NOWSupported ScaffoldPermit IssuedSAFWAY ATLANTIC, LLC09/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/03/2026
DOB NOWStructuralPermit IssuedJRM CONSTRUCTION MGMT LLC07/29/2026
DOB NOWSprinklersPermit IssuedNYC FIRE SPRINKLER CORP06/02/2026
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC05/26/2026
DOB NOWSprinklersPermit IssuedAGGRESSIVE FIRE PROT LLC04/14/2026
DOB NOWSprinklersSigned-offAGGRESSIVE FIRE PROT LLC04/14/2026
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC03/09/2026
DOB NOWStructuralPermit IssuedJRM CONSTRUCTION MGMT LLC03/05/2026
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC03/04/2026
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC03/03/2026
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC02/19/2026
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC02/12/2026
DOB NOWSprinklersPermit IssuedAGGRESSIVE FIRE PROT LLC02/12/2026
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC02/03/2026
DOB NOWStructuralPermit IssuedJRM CONSTRUCTION MGMT LLC01/28/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP01/27/2026
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC01/26/2026
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC01/20/2026
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC01/16/2026
DOB NOWPlumbingPermit IssuedPAR PLUMBING CO., INC12/18/2025
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC12/02/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC11/18/2025
DOB NOWStructuralPermit IssuedJRM CONSTRUCTION MGMT LLC10/21/2025
DOB NOWSidewalk ShedPermit IssuedSAFWAY ATLANTIC, LLC09/30/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/29/2025
DOB NOWSupported ScaffoldPermit IssuedSAFWAY ATLANTIC, LLC09/29/2025
DOB NOWConstruction FencePermit IssuedSAFWAY ATLANTIC, LLC09/29/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/29/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC09/29/2025
DOB NOWSupported ScaffoldPermit IssuedSAFWAY ATLANTIC, LLC07/24/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedSAFWAY ATLANTIC, LLC07/24/2025
DOB NOWConstruction FencePermit IssuedSAFWAY ATLANTIC, LLC05/12/2025
DOB NOWSidewalk ShedPermit IssuedSAFWAY ATLANTIC, LLC05/12/2025
DOB NOWConstruction FencePermit IssuedMALATESTA PALADINO, INC04/14/2025
+ 60 more permits on file
2 projects · most recent 05/30/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/30/2025Permit IssuedJRM CONSTRUCTION MGMT LLCAir Conditioning Systems
Cooling
Mitsubishi Electric PEFY-P12NMAU 318 CFM · Vrf Indoor ×10
PKA-P18 455 CFM · Vrf Indoor ×10
MITSUBISHI - PEFY-P24NMAU-E4 880 CFM · Vrf Indoor ×5
MITSUBISHI - PEFY-P36NMAU-E4 1,270 CFM · Vrf Indoor ×5
PEFY-P18NMAU 575 CFM · Vrf Indoor ×5
09/21/2021——Air Conditioning Systems
Cooling
Mitsubishi Electric PLFY-EP30NEMU 700 CFM · Vrf Indoor ×2
PMFY-P12NBMU 300 CFM · Vrf Indoor ×1
2 projects · most recent 12/15/2025
FiledStatusContractorScope
12/15/2025Permit IssuedNYC FIRE SPRINKLER CORP77 heads
08/29/2024Signed-offAGGRESSIVE FIRE PROT LLC62 heads, 10 outlets
3 projects · most recent 08/24/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
08/24/2026Permit IssuedPAR PLUMBING CO., INCGas, Water/Sanitary
12/15/2025———
06/26/2024Permit IssuedPAR PLUMBING CO., INCStorm, Water/Sanitary
15 projects · most recent 06/10/2026
General Wiring
FiledStatusContractorScope
06/10/2026Permit IssuedABSOLUTE ELEC'L CONTRG OFGeneral Wiring
10/08/2025Permit IssuedABSOLUTE ELEC'L CONTRG OF1 meters
07/28/2025CompleteDAL ELECTRICAL CORP.General Wiring
07/07/2025CompleteNEAD ELECTRIC INC.General Wiring
05/21/2025Permit IssuedABSOLUTE ELEC'L CONTRG OF1 meters
05/21/2025Permit IssuedABSOLUTE ELEC'L CONTRG OF1 meters
05/13/2025CompleteDAL ELECTRICAL CORP.General Wiring
04/16/2025Permit IssuedABSOLUTE ELEC'L CONTRG OFGeneral Wiring
01/27/2025Permit IssuedABSOLUTE ELEC'L CONTRG OFGeneral Wiring
07/09/2024CompleteDAL ELECTRICAL CORP.General Wiring
01/11/2024Permit IssuedCORPORATE ELEC. GROUP INC—
08/25/2023CompleteDAL ELECTRICAL CORP.—
04/07/2023Permit IssuedTOP SHELF ELECTRIC CORP—
03/17/2023CompleteDAL ELECTRICAL CORP.—
07/21/2022CompleteJAM ELECTRICAL CORP—
5 projects · most recent 06/04/2026
Steel Concrete Masonry
FiledStatusContractorScope
06/04/2026Permit IssuedJRM CONSTRUCTION MGMT LLCSteel, Concrete
03/02/2026Permit IssuedJRM CONSTRUCTION MGMT LLCSteel, Masonry
01/21/2026Permit IssuedJRM CONSTRUCTION MGMT LLCMasonry
01/21/2025Signed-offJRM CONSTRUCTION MGMT LLCSteel
02/08/2021Permit IssuedSHAWMUT WOODWORKING & SUPSteel, Concrete
6 projects · most recent 06/18/2026
Scaffold Sidewalk Shed Fence
FiledStatusContractorScope
06/18/2026Permit IssuedSAFWAY ATLANTIC, LLCScaffold
12/22/2025Permit IssuedSAFWAY ATLANTIC, LLCSidewalk Shed
12/08/2025Permit IssuedSAFWAY ATLANTIC, LLCFence
04/10/2025Permit IssuedMALATESTA PALADINO, INCFence
02/12/2024Permit IssuedSAFWAY ATLANTIC, LLCSidewalk Shed
03/02/2023Permit IssuedKING HOIST & SCAFFOLDINGScaffold
▾Field Inspections (DOB CAP) — 54
DateTypeResultReport
08/05/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/15/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/22/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/22/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/05/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/29/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/29/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/21/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/14/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/14/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/08/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 54.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/06/2026Ventilation and air distribution systemEUGENE BIFULCOenergy_progress
07/06/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
07/06/2026HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
07/06/2026FinalEUGENE BIFULCOprogress
07/06/2026Shutoff dampersEUGENE BIFULCOenergy_progress
07/06/2026Lighting controlsEUGENE BIFULCOenergy_progress
07/06/2026HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
07/06/2026Mechanical SystemsEUGENE BIFULCOspecial
07/06/2026Interior lighting powerEUGENE BIFULCOenergy_progress
07/06/2026Duct leakage testing, insulation and designEUGENE BIFULCOenergy_progress
07/06/2026HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
07/06/2026Maintenance informationEUGENE BIFULCOenergy_progress
03/03/2026Insulation placement and R valuesEUGENE BIFULCOenergy_progress
03/03/2026FinalKenneth Parkprogress
03/03/2026Air barrier - visual inspectionEUGENE BIFULCOenergy_progress
03/03/2026Fenestration areasEUGENE BIFULCOenergy_progress
03/03/2026Fenestration air leakageEUGENE BIFULCOenergy_progress
03/03/2026Fenestration and door U-factor and product ratingsEUGENE BIFULCOenergy_progress
03/03/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
03/03/2026Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
03/02/2026FinalEUGENE BIFULCOprogress
03/02/2026Structural Stability – Alterations of existing buildingsEUGENE BIFULCOspecial
03/02/2026Structural Steel - DetailsEUGENE BIFULCOspecial
03/02/2026Structural Steel - WeldingEUGENE BIFULCOspecial
03/02/2026MasonryEUGENE BIFULCOspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Harry WinstonRetailFloors 1–5, Roof
Project M01328205 Alteration · Permit Entire · 02/05/2026
Project M01265692 Alteration · Permit Entire · 10/06/2025
Project M08025953 Alteration · LOC Issued · 12/22/2022
Project M08025950 Alteration · LOC Issued · 12/19/2022
Project M08025955 Alteration · Permit Entire · 12/19/2022
Project M00578633 Alteration · LOC Issued · 09/23/2021
Project M00586727 Alteration · Permit Entire · 09/15/2021
Project M00586729 Alteration · LOC Issued · 09/14/2021
Project M00446701 Alteration · Permit Entire · 02/04/2021
Project M00446869 Alteration · LOC Issued · 02/04/2021
Project M00446875 Alteration · Permit Entire · 02/04/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 828 on file (BIS + DOB NOW)
▸Plans & Drawings81
▸DOB NOWPlans/Sketch76
09/03/2026M00586729-I1Request digital key ↗
09/03/2026M00587659-I1Request digital key ↗
09/03/2026M00586727-I1Request digital key ↗
Showing 3 of 76 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00446701-P1Request digital key ↗
09/04/2026M00446701-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00446875-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/04/2026M00446796-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00446869-I1Request digital key ↗
▸Applications & Permits128
▸BISPLAN / WORK APPROVAL APPLICATION81
04/24/2024140957301Open ↗
05/13/2022140957301Open ↗
10/28/2021140957301Open ↗
Showing 3 of 81 on file for this type
▸BISWORK PERMIT APPLICATION47
02/27/2014121358351Open ↗
02/27/2014121358351Open ↗
07/29/2013121348611Open ↗
Showing 3 of 47 on file for this type
▸Seals & Professional Certifications277
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION104
04/06/2016120835953Open ↗
04/06/2016120835953Open ↗
04/06/2016120835953Open ↗
Showing 3 of 104 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature85
09/10/2026M01223540-P7Open ↗
09/10/2026M01223540-S4Open ↗
09/04/2026M00446869-I1Open ↗
Showing 3 of 85 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature34
09/26/2026M08025955-P1Open ↗
09/23/2026M01223540-P7Open ↗
09/23/2026M01223540-P2Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
09/26/2026M08025955-P1Open ↗
09/26/2026M08025955-P1Open ↗
09/22/2026M01320144-I1Open ↗
Showing 3 of 32 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
10/10/2012121397817Open ↗
10/10/2012121397826Open ↗
09/25/2012121362658Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
10/10/2012121397817Open ↗
10/10/2012121397826Open ↗
09/25/2012121362658Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/06/2020140957301Open ↗
▸Trade Schedules & Equipment25
▸BISSCHEDULE B - PLUMBING10
10/23/2012121348611Open ↗
Showing 1 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
03/21/2014121348611Open ↗
06/28/2013120835953Open ↗
12/04/2012120835953Open ↗
Showing 3 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA4
08/13/2014121341869Open ↗
07/31/2014121341869Open ↗
Showing 2 of 4 on file for this type
▸BISEQUIPMENT USE PERMITS2
04/06/2016120835953Open ↗
12/31/2013120835953Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT1
12/31/2013120835953Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
05/12/2021140957301Open ↗
▸Environmental & Asbestos58
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
09/03/2026M00586729-I1Open ↗
09/03/2026M00578699-I1Open ↗
09/03/2026M00578633-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form17
09/04/2026M00446869-I1Open ↗
08/27/2026M01034295-I1Open ↗
08/27/2026M01033874-I1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
11/06/2020140957301Open ↗
10/10/2012121397817Open ↗
10/10/2012121397826Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance26
▸BISAS-BUILT ENERGY ANALYSIS8
04/06/2016120835953Open ↗
04/02/2014121348611Open ↗
08/01/2013120716895Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
04/06/2016120835953Open ↗
04/02/2014121348611Open ↗
08/01/2013120716895Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
11/16/2012121348611Open ↗
Showing 1 of 3 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/06/2022140957301Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/12/2021140957301Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports3
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/06/2022140957301Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/26/2021140957301Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/06/2022140957301Open ↗
▸Approvals, Objections & Sign-offs92
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
04/06/2016120835953Open ↗
06/23/2015120872234Open ↗
06/23/2015120872859Open ↗
Showing 3 of 31 on file for this type
▸BISADMINISTRATIVE OBJECTIONS31
10/10/2012121397817Open ↗
10/10/2012121397826Open ↗
09/25/2012121362658Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDEP Variance (V5) letter16
09/04/2026M00446869-I1Open ↗
09/04/2026M00446875-I1Open ↗
08/23/2026M01092130-I1Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
12/06/2012120872261Open ↗
12/05/2012120873144Open ↗
12/05/2012120872831Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
04/24/2024140957301Open ↗
07/09/2021140957301Open ↗
11/06/2020140957301Open ↗
▸DOB NOWDCLA Approval of Artwork3
08/21/2026M01259685-P3Open ↗
Showing 1 of 3 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
01/26/2021140957301Open ↗
01/08/2021140957301Open ↗
▸Cost, Insurance & Ownership69
▸BISCOST AFFIDAVIT69
11/06/2020140957301Open ↗
04/06/2016120835953Open ↗
06/23/2015120872234Open ↗
Showing 3 of 69 on file for this type
▸Filing & Intake Forms57
▸BISEFILING COVER SHEET38
10/10/2012121397817Open ↗
10/10/2012121397826Open ↗
09/25/2012121362658Open ↗
Showing 3 of 38 on file for this type
▸BISADDITIONAL INFORMATION15
07/01/2024140957301Open ↗
06/14/2022140957301Open ↗
03/04/2021140957301Open ↗
Showing 3 of 15 on file for this type
▸BISeFiling Job Application Cover Sheet2
11/06/2020140957301Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWAI1 Form (from plan PDF)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
12/06/2012120876588Open ↗
12/06/2012120872859Open ↗
12/06/2012120873135Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWPARTIAL DEMO: 10-DAY Notice2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
11/06/2020140957301Open ↗
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type